Page 410

21

Conventional Stakeout

5.

Use the graphical display screen, or the text display, to navigate the target to the point. For more information, see Using the Graphical Display During Stakeout, page 381.

6.

When all arrows are hollow, to mark the point, do one of the following: – a s s 9 y

To record the as-staked point:

If you selected the View deltas before storage check box, tap . The measurement and the stakeout deltas are displayed. Tap to store the point. If you did not select the View deltas before storage check to store the point. box, tap –

21.2.4

To abandon the as-staked point without recording it, tap then . You return to the list and can stake out more points.

Staking Out a Line To stake out a line:

38 6

S

1.

Perform a station setup. For more information, Chapter 19, Starting a Conventional Survey.

2.

From the map, select the line to be staked out. Tap Stake out line screen appears.

3.

The selected line is displayed in the Line name field. To select another line in the Line name field, use one of the following methods:

. The

–

Tap to display a list of lines selected from the map. Tap the required line to select it. If necessary, reselect the line from the map.

– to display a list of lines stored in the Trimble Tap Survey Controller database. Tap the required line to select it.

–

Tap l k and define the line to be staked out.

Trimble Survey Controller User Guide

Page 411

Conventional Stakeout

21

4.

Enter a value in the Target height field.

5.

Select an option in the Stake field and enter the required information. For more information, see Stake options, page 389.

6.

. The TSCe data collector displays a large arrow that Tap indicates the direction in which you must turn the instrument.

7.

. The When the target is on line with the instrument, tap following fields contain values if they are appropriate to the stakeout method used:

x m

–

H. Dist reqd – the horizontal distance from the instrument to the line or station on the line.

–

H. Ang reqd – the horizontal angle reading that should appear on the instrument to point in the direction of the line or station on the line.

–

Delta H. Ang – the angle that the instrument needs to turn to point in the direction of the line or station on the line.

–

Go In/Out – the horizontal distance along the instrument line of sight, to the line or station on the line.

–

Go Left/Right – the horizontal distance perpendicular to the instrument line of sight, to the line of station on the line.

–

V. Dist (cut/fill) – the vertical distance between the target position and the point on the line to be staked out.

–

Stationing – the station/chainage of the target position perpendicular to the line.

–

∆ Station – the difference in the stationing between the target position and the station to be staked out. A positive value means that the station to be staked out is towards the beginning of the line. A negative value means that the station to be staked out is towards the end of the line.

–

H.Offset – the offset of the target position in relation to the line. A positive value is an offset to the right and a negative offset is an offset to the left.

Trimble Survey Controller User Guide

387

Page 412

21

Conventional Stakeout

– 8.

Grade to line – the grade of the slope between the target position and the closest point on the line.

Use the graphical display or the text display to navigate the target to the point, as shown in the following screen:

For more information, see Using the Graphical Display During Stakeout, page 381. 9.

When all four arrows are hollow, mark the point. Do one of the following: – a s s 9- y+

To record the as-staked point:

If you selected the View deltas before storage check box, . The measurement and the stakeout deltas are tap displayed. Tap to store the point. If you did not select the View deltas before storage check to store the point. box, tap –

38 8

To abandon the as-staked point without recording it, tap then . You return to the Stakeout/Line screen. Tap or to select the next station on the line, and stake out the points as described above.

Trimble Survey Controller User Guide

Page 413

Conventional Stakeout

21

Stake options When staking out a line, the options for the Stake field are:

21.2.5

•

Station on the line – enter the station to be staked out.

•

Station/offset from line – enter the station to be staked out, a horizontal offset, and a vertical offset.

•

Slope from line – enter the slope parameters for a slope to the left and/or right of the line as required.

Staking Out an Arc To stake out an arc:

S

1.

Perform a station setup. For more information, see Chapter 19, Starting a Conventional Survey.

2.

From the map, select the arc to be staked out. Tap Stake out line screen appears.

3.

The selected line is displayed in the Line name field. To select another line in the Arc name field, use one of the following methods: –

–

–

. The

Tap to display a list of arcs selected from the map. Tap the required arc to select it. If necessary, reselect the arc from the map.

l k x to display a list of arcs stored in the Trimble Tap Survey Controller database. Tap the required arc to select it. Tap and define the arc to be staked out.

4.

Enter a value in the Target height field.

5.

Choose a setting in the Stake field and enter the required information. For more information, see Stake options, page 391.

6.

. The TSCe data collector displays a large arrow that Tap indicates the direction in which you must turn the instrument.

Trimble Survey Controller User Guide

389

Page 414

21

7.

39 0 m

Conventional Stakeout

When the target is on line with the instrument, tap . The following fields contain values if they are appropriate to the stakeout method used: –

H. Dist reqd – the horizontal distance from the instrument to the arc or station on the arc.

–

H. Ang reqd – the horizontal angle reading that should appear on the instrument to point in the direction of the arc or station on the arc.

–

Delta H. Ang – the angle that the instrument needs to turn to point in the direction of the arc or station on the arc.

–

Go In/Out – the horizontal distance along the instrument line of sight, to the arc or station on the arc.

–

Go Left/Right – the horizontal distance, perpendicular to the instrument line of sight, to the arc of station on the arc.

–

V. Dist (cut/fill) – the vertical distance between the target position and the point on the arc to be staked out.

–

Stationing – the station/chainage of the target position, perpendicular to the arc.

–

∆ Station – the difference in the stationing between the target position and the station to be staked out. A positive value means that the station to be staked out is towards the beginning of the arc. A negative value means that the station to be staked out is towards the end of the arc.

–

H.Offset – the offset of the target position in relation to the arc. A positive value is an offset to the right and a negative offset is an offset to the left.

–

Grade to arc – the grade of the slope between the target position and the closest point on the arc.

Trimble Survey Controller User Guide

Page 415

Conventional Stakeout

8.

21

Use the graphical screen display or the text display to navigate the target to the point, as shown in the following screen:

For more information, see Using the Graphical Display During Stakeout, page 381. 9.

When all four arrows are hollow, mark the point. Do one of the following: – a s s 9- y+

To record the as-staked point:

If you selected the View deltas before storage check box, . The measurement and the stakeout deltas are tap displayed. Tap to store the point. If you did not select the View deltas before storage field, to store the point. tap –

To abandon the as-staked point without recording it, tap then . You return to the Stakeout/Arc screen. Tap or to select the next station on the arc, then stake out the points as described above.

Stake options When staking out an arc, the options for the Stake to field are: •

Station on the arc – enter the station to be staked out.

•

Station/offset from arc – enter the station to be staked out and any horizontal and vertical offset.

Trimble Survey Controller User Guide

391

Page 416

21

21.2.6

Conventional Stakeout

•

Slope from arc – enter the slope parameters for a slope to the left and/or right of the arc, as required.

•

Intersect point of arc.

•

Center point of arc.

Staking Out a Digital Terrain Model To stake out a DTM: 1. 2. 3. 4. 5. 6.

7.

8.

39 2

From the main menu, select Survey / < Conventional Survey Style>. Select Station Setup and perform a station setup. For more information, see Chapter 19, Starting a Conventional Survey. Select Stakeout / DTMs. The Stake out DTM screen appears. In the DTM field, select the terrain model to be staked out. Enter a value in the Target height field and, if needed, the Vertical offset field. Tap . When the graphical display screen appears, tap . The screen displays the coordinates of the current position and the vertical distance above (cut) or below (fill) the DTM. Do one of the following: – To record the point: If you selected the View deltas before storage check box, tap . The measurement and the stakeout deltas are displayed. Tap to store the point. If you did not select the View deltas before storage check box, tap to store the point. The Trimble Survey Controller software stores the point and the stakeout deltas. – To abandon the point without recording it, tap then . You return to the list and can stake out more points. Tap to return to the Stakeout/DTM screen.

x a s s y 9

Trimble Survey Controller User Guide m

9

Page 417

Conventional Stakeout 21.2.7

21

Staking Out a Road To stake out a road using a conventional instrument, use the graphical screen shown in Using the Graphical Display During Stakeout, page 381. For more information about staking out a road, see Chapter 6, Roading.