Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 11 of 14

Trimble Survey Controller Field Guide: Conventional Instrument Field Procedures, pages 79 to 88

Pages 79 to 88 of 114, from Trimble Survey Controller Field Guide

The original document is the PDF (2.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Trimble TSC1

Page 79

Conventional Instrument Field Procedures

4.7

4

Measuring a Point Before measuring points, do a station setup. To measure a point: 1.

From the Survey menu, select Measure points. The Survey/Measure points screen appears, as shown in Figure 4.5.

o

Figure 4.5

Survey/Measure points screen

2.

Press

3.

Make sure that the View before storage field is set to Yes. Change any other fields as required.

4.

Enter a value in the Point name field.

5.

If applicable, enter a feature code in the Code field.

6.

Set the measurement method to Angles and distance in the Method field.

7.

Enter a value in the Target height field.

8.

Sight the center of the target and press s

.

m

.

The measurement information appears on the screen. 9.

Press to store the point.

The Trimble Survey Controller software stores the raw observations (HA, VA, and SD). 10. Repeat Step 4 through Step 9 until all points are measured. Trimble Survey Controller Field Guide

65

Page 80

4

Conventional Instrument Field Procedures

4.8

Measuring Rounds of Observations To measure multiple sets (rounds) of observations, complete a station setup and do the following: 1.

From the Survey menu, select Measure rounds. The Survey/Measure rounds screen appears, as shown in Figure 4.6.

Figure 4.6

Survey/Measure rounds screen o

2.

To change the settings for the survey, press fields as required.

3.

Enter a value in the Point name field.

4.

If applicable, enter a feature code in the Code field.

5.

Choose one of the following options from the Method field, :

6.

–

Angles only–measures the horizontal and vertical angles

–

Angles and distance–measures the horizontal and vertical angles and slope distance o m

Enter a value in the Target height field. Note – Press

7.

. Change the s to enter a prism constant for the target.

Sight the center of the target and press

.

The measurement information appears on the screen. 8.

66

Press to store the point.

Trimble Survey Controller Field Guide

Page 81

Conventional Instrument Field Procedures

9.

é

4

Repeat Step 4 through Step 8 until all points to be included in the rounds of observations are measured.

10. Press

.

For subsequent observations, the Trimble Survey Controller software guides you through the specified number of rounds by: – directing you to change face when required

– defaulting to the correct point details for each observed station

11. Repeat Step 7 and Step 8 until all observations are completed in the current round. At the end of each round the Trimble Survey Controller software displays the results for the survey in the Rounds summary screen. 12. Do one of the following:

4.9

J e

–

To continue and observe more rounds, press

–

To end the rounds survey, press

.

.

Stakeout This section shows how to stake out a point using a conventional instrument. For information about staking out lines, curves, and surfaces refer to the Trimble Survey Controller Reference Manual.

C

Warning – Do not stake out points and then change the coordinate system or perform a calibration. If you do, these points will not be in terms of the new coordinate system. They will also be inconsistent with points staked out after the change.

Trimble Survey Controller Field Guide

67

Page 82

4 4.9.1

Conventional Instrument Field Procedures

General Procedure To stake out a point, set up the conventional instrument and do the following: 1.

Define the point and store it in the Trimble Survey Controller software database. To define the point do one of the following: – key in data

– upload a job from the Trimble Geomatics Office or Trimble Survey Office software, or upload coordinates from another device

– calculate coordinates using a Cogo function

2.

Complete a station setup.

3.

Start a survey.

4.

Select the point to stake out.

5.

Direct the person with the target to the point.

6.

Store the as-staked point (this step is optional).

7.

Repeat Step 4 through Step 6 until all points are staked out.

8.

End the survey.

The rest of this section shows how to key in a point using the Key in option, and then stake it out. For information on other methods, refer to the Trimble Survey Controller Reference Manual or the online help.

4.9.2

Keying in a Point To key in a point:

68

1.

From the main menu, select Key in / Points. The Key in/Point screen appears.

2.

Enter the point name, and a code if required.

3.

Set the Method field to Keyed in coordinates.

Trimble Survey Controller Field Guide

Page 83

o

Conventional Instrument Field Procedures

4

Make sure the coordinate fields are North, East, and Elevation. If not, press the softkey and change the coordinate view to Grid.

4.9.3

\ =

4.

Key in the coordinates.

5.

Press

6.

Repeat Step 2 through Step 5 for each point, then press return to the Key in menu.

7.

Press to store the point.

= to again to return to the main menu.

Staking Out a Point To stake out a point: 1.

From the main menu, select Survey. From the Select Survey Style menu, select your Conventional Survey Style.

2.

Select Station setup and perform a station setup.

3.

Select Stakeout / Points. The Stakeout/Points list appears.

4.

softkey to transfer points in the Trimble Survey Press the Controller software database to the Stakeout/Points list. The Select points screen appears, as shown in Figure 4.7.

A

Figure 4.7

5.

Screen showing selection methods

From the list, choose the method by which points are to be selected. Trimble Survey Controller Field Guide

69

Page 84

4

Conventional Instrument Field Procedures

If you choose Select from list, for example, a list of points in the Trimble Survey Controller software database appears as shown in Figure 4.8.

Figure 4.8

Select points screen showing list of points

/

To select a point from the list, highlight it and press the softkey. A check mark appears beside the selected point name. Do this for each point that is to be added to the stakeout list.

\ \ to return to the Stakeout/Points screen.

6.

Press

7.

Select the point to be staked out. (To do this, highlight the point .) and press The stakeout graphical display screen appears. It displays the horizontal angle to which you should turn the instrument and the distance from the instrument to the point, together with a graphical representation of this, as shown in Figure 4.9.

Figure 4.9 70

Graphical display screen – initial screen

Trimble Survey Controller Field Guide

Page 85

Conventional Instrument Field Procedures

8.

4

Use the graphical display or the text display to navigate the target to the point. A solid/filled arrow in the graphical display usually means that you must perform some action. Use the arrows to locate the point. In Figure 4.9, the large arrow indicates the direction in which the instrument must be turned. The value below the arrow indicates the circle reading that the instrument must display.

B

Tip – Press o to edit the tolerances used when locating a point.

o

The graphical display operates in two modes: Distances, and Angles and Distances. Both modes are shown in the following figures. To choose a mode, press and set the Display/Deltas field. 9.

m

When the instrument is within the angular tolerance, the graphical display shows two hollow/outline arrows.

. When the distance measurement has been made, a 10. Press screen similar to those shown in Figure 4.10 appears.

Figure 4.10

Graphical display screen – distance measurement made

In the left screen, the Display/Deltas field is set to Angles and distances. The arrows are curved. In the right screen, the Display/Deltas field is set to Distances. The arrows are straight.

Trimble Survey Controller Field Guide

71

Page 86

4

Conventional Instrument Field Procedures

The left and right arrows are hollow because the instrument is still on line. The up/down arrow is solid because the target must move away from the instrument.

m

11. Instruct the person with the target to move. again. If the instrument has turned off line, the two 12. Press outline arrows disappear and a solid one appears, as shown in Figure 4.11.

Figure 4.11

Graphical display screen – measurement made, instrument off line

In the left screen, the instrument must be turned to the left by the amount shown and the target must follow to stay on-line. The down arrow indicates that the target must also move towards the conventional instrument. In the right screen, the target must move to the left. The instrument must be turned to follow the target. When the instrument is on-line, the two outline arrows reappear. The down arrow indicates that the target must also move towards the conventional instrument. 13. When the target has moved, press m again.

If the instrument is on-line, two left/right outline arrows appear. If the distance is not yet correct, a solid up/down arrow shows the direction and amount that the target must move towards or away from the instrument, as shown in Figure 4.10. 14. Instruct the person with the target to move. 72

Trimble Survey Controller Field Guide

Page 87

15. Press m

Conventional Instrument Field Procedures

4 again.

If the measurement is within the set angular and distance tolerances, four hollow/outline arrows appear and the center point is filled in, as shown in Figure 4.12.

Figure 4.12

Graphical display screen – point located within tolerance s

16. When all arrows are hollow, mark the point. Then do one of the following: – z s y

To record the as-staked point, press the softkey.

If the View deltas before storage option is set to Yes, press then . –

=

If you do not want to record the as-staked point, press then . You return to the list and can stake out more points.

17. Repeat Step 7 through Step 16 until all points are staked out.

4.10

Ending the Survey End the survey when you have finished measuring and staking out points at the current station setup.

y

To end the survey: 1.

From the Survey menu, select End survey.

2.

Press to confirm the action. Trimble Survey Controller Field Guide

73

Page 88

4

Conventional Instrument Field Procedures

74

Trimble Survey Controller Field Guide