Page 135
LSI
GB
Contents 1. General......................................................................... 136 2. System description........................................................ 137 3. Safety regulations and instructions................................ 137 4. Mounting....................................................................... 139 4.1 Mechanical mounting ............................................. 139 4.2 Electrical installation .............................................. 139 4.3 Cabling requirements ............................................. 140 5. Notes on commissioning ............................................... 142 6. Tests............................................................................. 142 6.1 Test of PLS with LSI .............................................. 142 6.2 Checklist ................................................................ 145 7. Diagnosis...................................................................... 148 7.1 Diagnostic elements............................................... 148 7.2 Service .................................................................. 150 8. Accessories .................................................................. 150 9. Declaration of Conformity ............................................. 151 10. Technical Data, LSI..................................................... 152 11. Appendix: Key to diagrams ......................................... 160
This document is protected by the law of copyright, whereby all rights established therein remain with the company SICK AG. Reproduction of this document or parts of this document is only permissible within the limits of the legal determination of Copyright Law. Alteration or abridgement of the document is not permitted without the explicit written approval of the company SICK AG.
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
135
Page 136
GB
LSI
1. General This manual contains information on commissioning, diagnosis, servicing and technical data, as well as certification of conformity. For more detailed information, such as ordering, system use and programming, refer to the LSI Technical Description. For information on the PLS laser scanner refer to the PLS documentation. This instruction manual refers only to the following device: LSI 101 - 11X The last digit of the type designation (X: 1 to 4) represents the maximum number of connectable sensors. This device is certified for use as a personal protection unit and, when used correctly, conforms to the relevant standards.
136
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
Page 137
LSI
GB
2. System description The LSI Laser Scanner Interface together with the PLS laser scanner forms a sensor system unit for personal protection on vehicles and industrial plant in enclosed areas. The LSI offers the possibility of operating up to four PLS units simultaneously. The connected laser scanners communicate online via serial interfaces with the LSI. Up to eight protective and warning fields – subsequently referred to as monitoring areas – can be stored in the non-volatile memory of the interface. The various areas are selected by way of binary inputs or speed transducers and are assigned to various output channels. The LSI is used in conjunction with PLS units in driverless transport systems and in manufacturing plant. It significantly enhances the applications of the laser scanner in those areas. Registering the running speed makes it possible to adapt monitoring areas dependent on speed and direction of travel. Likewise, in stationary area protection applications protective fields can be controlled dependent on machine position and status. By the use of two independent 2-channel outputs (OSSD), simultaneous monitoring cases can be implemented. Each OSSD pair has a separate reset/restart and external device monitoring input.
3. Safety regulations and instructions Before mounting and wiring up the LSI, please observe the instructions set out in the Technical Descriptions of the LSI and the PLS. Mounting and connection work must only be carried out only by qualified personnel. Prior to initial commissioning, a test must be carried out by the operating company’s line manager. Tests of such kind may be carried out only by qualified personnel. 1. The use and installation of the non-contact safety device, both for commissioning and for routine technical inspections,
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
137
Page 138
GB
LSI is subject to the relevant national and international legal requirements, in particular the Machinery Safety Regulations derived from the Machinery Directive 98/37 EC, the Word Equipment Regulations derived from the Provision and Use of Work Equipment Directive 89/655 EEC, the applicable safety directives and the rules governing accident prevention and safety at work. The manufacturers and users of the machinery on which our safety devices are used are solely responsible for ascertaining all applicable safety rules and regulations from the competent authorities and for compliance with the said rules and regulations. 2. Furthermore, the instructions given by us - and in particular the test regulations (see section “Tests”) set out in the Technical Description and in the Operating Instructions (including instructions relating to use, mounting, installation and integration into the machine control system) - must be followed. 3. The tests must be performed by qualified experts or by specially authorised and instructed personnel and must be documented in such a way as to be verifiable at any time. 4. Our Operating Instructions must be made available to the employee (operator) of the machine on which our safety device is used. The employee must be instructed by qualified experts. 5. The appendix to this brochure includes a checklist for testing by the manufacturer and equipment supplier.
138
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
Page 139
LSI
GB
4. Mounting 4.1 Mechanical mounting The housing of the LSI can be DIN rail mounted in the switch cabinet rails (top-hat TS 35) or by means of the supplied brackets (min. protection IP54). For correct mounting of the PLS unit(s) refer to the PLS Technical Description.
4.2 Electrical installation When wiring up the system you are advised to unfold the pin assignment diagram presented in the appendix to this document. With regard to the power supply to the LSI, it should be noted that the overall current consumption is dependent on the number of sensors in use and the connected load at the outputs. For relevant data refer to the PLS and LSI Technical Descriptions. Also ensure that the cable cross-section is sufficiently dimensioned. To wire the WAGO connectors use the supplied plastic U-clamp. If the incremental encoder inputs C and D are used, the static inputs C1, C2 and D1, D2 are no longer available! Mark the connectors to prevent inadvertent swapping. Notes on installation of the PLS units on the LSI The safety outputs (OSSD) of the connected PLS unit(s) must not be used in conjunction with the LSI. Also refer to the complete connection diagram in the appendix. Lay all cables and wires such that they are protected against damage. If you pre-assemble the connectors and cables yourself, make sure you do not confuse the power supply and interface connectors. Close off exposed tapped holes using the supplied blanking plugs and make sure the seals are correctly positioned. Do not drop the connectors. The Sub-D connector may be
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
139
Page 140
GB
LSI pushed into its housing as a result, and so be rendered unusable. Check that that the seal on the connection boxes fits tight. Insert the connectors in the pre-assigned mountings on the correct sides in the PLS housing. Push the connectors into the PLS housing by exerting a small amount of pressure. You will identify that a correct connection has been made when the connection boxes with the connectors terminate flush with the PLS housing. Only then you should secure the connection boxes by the hexagon socket screws. Only when both connection boxes with their seals are inserted and secured in the way specified does the housing conform to enclosure rating IP65.
4.3 Cabling requirements Communication cable from LSI to PLS: The communication cable to the PLS must be a shielded twisted pair data cable. On the LSI end be sure to use the accessory 9-pin metallised Sub-D connectors, because they are provided with a special shield. Connect the data cable shield to the strain relief on the LSI end only. The shield is not connected on the PLS end. Pay attention to the pin assignment. Use a low-capacitance twisted pair data cable of type Li2YCY 2 (TP) with a cross-section of at least 2 x 2 x 0.25 mm . Max. cable length: 30 m Power supply cable to LSI: Use a copper cable with a maximum cross-section of 2.5 2 mm . Max. cable length: 50 m Signal cables to and from the LSI: Use a copper cable with a maximum cross-section of 2.5 2 mm . Max. cable length: 50 m
140
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
Page 141
LSI
GB
Power supply cable to PLS: Use a copper cable with a maximum cross-section of 2 0.5 mm . Max. cable length: 30 m Notes: When dimensioning the cable cross-sections dependent on line length and power pack tolerance, make sure the system is not operated outside its permitted voltage ranges (see technical data of LSI and PLS). The spring clamp female connector strips can hold cables (single-wire, multi-wire, fine-wire or fine-wire with ferrule) with 2 cross-sections from 0.08 to 2.5 mm . Example table - Power supply cables: Power supply cable length System LSI with two PLS Power pack 24 V DC ± 3 %
Power pack – LSI
LSI – PLS
2
50 m (2.5 mm )
10 m (0.5 mm )
2
2
40 m (2.5 mm )
20 m (0.5 mm )
24 m (1.5 mm )
2
20 m (0.5 mm )
2
2 2 2
LSI with four PLS
40 m (2.5 mm )
4 m (0.5 mm )
Power pack 24 V DC ± 3 %
28 m (2.5 mm )
2
20 m (0.5 mm )
2
17 m (1.5 mm )
20 m (0.5 mm )
50 m (2.5 mm )
2
20 m (0.5 mm )
2
LSI with two PLS
2 2 2 2
Power pack 24 V DC ± 1 %
30 m (1.5 mm )
20 m (0.5 mm )
LSI with two PLS
4 m (1.0 mm )
2
4 m (0.5 mm )
2
Power pack 24 V DC +20 %/-25 %
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
141
Page 142
GB
LSI
5. Notes on commissioning Commissioning is subject to special safety precautions. Be sure to refer to the relevant sections of the Technical Description in this regard. The device is programmed in a basic configuration. Changes to monitoring areas or to the parameter settings may be made only by authorised (qualified) personnel.
6. Tests 6.1 Test of PLS with LSI These tests are required in order to check that the safety devices are functioning correctly and are properly integrated into the machine/plant control, as well as to reveal any alterations or manipulations in the system. The following instructions must be observed to ensure regulation use: The units must be installed and connected only by qualified personnel. “Qualified” means personnel trained and experienced in operation of the power-driven machinery being checked, and familiar with the relevant statutory work safety and accident prevention regulations, standards and generally accepted technical rules (e.g. DIN standards, VDE rules, technical standards and regulations of other EU states) such that they are able to assess the operational safety of the power-driven machinery concerned. Such personnel are usually qualified employees of the manufacturers of noncontact protective devices, or personnel who have undergone training by the manufacturers of such devices, are primarily engaged in testing of non-contact protective devices and have been commissioned to carry out the work by the company operating the devices.
142
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved
Page 143
LSI
GB
1. Pre-commissioning test of the machine protective device by qualified personnel: -
-
-
The pre-commissioning test confirms compliance with the safety requirements laid down in the national and international regulations, in particular machinery and equipment use directives (EC Declaration of Conformity). Test of the effectiveness of the protective device on the machine in all modes in which the machine is capable of operating, based on the enclosed checklist. The operating personnel of the machine protected by the protective device must be instructed by specialist personnel of the machine operating company before beginning work. The said instruction is the responsibility of the machine operating company.
Test your LSI system using the checklist reproduced in section 6.2. 2. Routine testing of the protective device by qualified personnel: -
-
Test based on national regulations, at the intervals they stipulate. These tests serve to reveal modification or manipulations of the protective device relative to the initial commissioning stage. The tests must be conducted any time major modifications are made to the machine or the protective device, as well as whenever resetting or repair work is carried out in the event of damage to the housing, front screen, connecting cables, etc.
Test your LSI system using the checklist reproduced in section 6.2.
8 008 308/M848/06-05-02 Operating Instructions · LSI © SICK AG · Industrial Safety Systems · Germany · All rights reserved