For the NCR 7870
Page 51
Chapter 3: Site Preparation
3-9
Checkstand Power and Wiring Considerations Power Considerations In the 1000 and 2000 models, the 7870 receives power from an external supply which is normally mounted to the exterior surface of the unit’s chassis. The power supply may be mounted near the 7870 rather than on it, if advantageous. In the 3000, 4000, and 4500 models, the power supply is mounted on the checkstand. It is a 40-watt switching power supply with the following inputs.
Voltage
Frequency
Input Power
90 to 260 Vac
47 to 63 Hz
55 Watts
Power Applications The 7870 has no ON/OFF switch. A recessed, 15 amp circuit breaker must be wired in the checkstand. This circuit breaker must be accessible to the operator so the unit may be powered off and on. It will also be needed to reset the unit during programming.
Power Transients Protection Voltage transients -- surges, sags, impulses, and spikes – may be experienced routinely or sporadically. When such conditions exist, the use of protective devices may be required to ensure proper operation.
Page 52
3-10
Chapter 3: Site Preparation
Wiring Considerations U.S., Canadian, and Japanese Checkstand Wiring Input Voltage
L3 G Main Service Panel
Neutral and Ground Bus
Belt Control Lighting Misc. Equip.
N Conduit Circuit A: Checkstand
Belt Motor
Checkstand Frame
Note: The electrical wiring must meet all electrical codes, laws, and regulations.
Feeder wiring and insulated ground from main service panel to distribution panel to be run in metal conduit. Circuit Breakers
Isolated/Insulated Ground Bus
NCR circuits should be run in separate metal Conduits. Note: NCR circuits must be dedicated to NCR equipment or other logically connected electronic equipment (modems, DAA, bridges, etc.)
L1
Circuit B: Terminal L2 Circuit C: Scanner/Scale Receptacle should be easily accessible and near the Scanner/Scale
Neutral Bus Distribution Panel
Isolated Ground Receptacles Installation Type U.S., Canada, & Japan
Input Voltage
L1, L2
Circuit Breakers
100Vac to 120Vac
100Vac to 120Vac
International
220Vac to 240Vac
220Vac to 240Vac
Standard single-pole; value determined by type of device branch and by electrical code.
European
220Vac
220Vac
European double-pole. R0121
Page 53
Chapter 3: Site Preparation
3-11
European Checkstand Wiring Use this diagram when line voltage to the Service Panel is 220 Vac and European double-pole circuit breakers are used in the Distribution Panel. Store Load Center
220Vac
Circuit A
L3 Neutral and Ground Bus
G
Belt Control Lighting Misc. Equip.
N
Belt Motor
Conduit
N
Checkstand Frame Feeder wiring and insulated ground from main service panel to distribution panel to be run in metal conduit. The electrical wiring must meet state and local electrical codes, laws, and regulations.
Isolated/ Insulated Ground Bus.
European double-pole circuit breakers.
L2 L1
NCR circuits should be run in seprate metal Conduits.
Circuit B Terminal 220 Vac
Circuit C Scanner/Scale Neutral Bus Isolated Ground Receptacles Distribution Panel
Note : NCR circuits must be dedicated to NCR equipment or other logically connected electronic equipment (modems, DAA, bridges, etc.) R0133
Page 54
3-12
Chapter 3: Site Preparation
International Checkstand Wiring Use this diagram when the line voltage to the Service Panel is 220 or 240 Vac and standard single pole circuit breakers are used in the Distribution Panel. Main Service Panel
220 Vac 240
Circuit A
L3 Neutral and Ground Bus
G
Belt Control Lighting Misc. Equip.
N
Belt Motor
Conduit
N
Checkstand Frame Feeder wiring and insulated ground from main service panel to distribution panel to be run in metal conduit. The electrical wiring must meet state and local electrical codes, laws, and regulations.
Isolated/ Insulated Ground Bus.
Standard single-pole circuit breakers.
L2 L1
NCR circuits should be run in seprate metal Conduits.
Circuit B 220 230 Vac 240
Terminal
Circuit C Scanner/Scale Neutral Bus
Distribution Panel
Isolated Ground Receptacles
Note : NCR circuits must be dedicated to NCR equipment or other logically connected electronic equipment (modems, DAA, bridges, etc.) R0134
Page 55
Chapter 3: Site Preparation
3-13
Wiring Instructions Running Feeder Lines from Main Service Panel 1. Select the most appropriate wiring diagram as a guide. 2. Run two separate feeder lines in conduit from the Main Service Panel in the checkstand to the customer equipment and to the NCR Distribution Panel. •
Line 1 services Circuit A which is for customer equipment such as checkstand belt motor, counter lighting, and cooling fans.
•
Line 2 is dedicated to service the NCR equipment, typically Circuit B and Circuit C.
Circuit A 3. Electrically connect the grounding conductor in Circuit A to Store Ground. 4.
Electrically connect conduit and checkstand junction box to the frame of the checkstand, if conductive, or to a common tie point if not conductive.
5. Connect to the grounding conductor in Circuit A (which is Store Ground) any • conduit,
• metal parts,
• store ground devices
• counter belt motor ground, and
• other counter equipment grounds.
Page 56
3-14
Chapter 3: Site Preparation
Circuit B The ground conductor in Circuit B (to the host terminal) is an isolated, insulated ground – it must be isolated from the outlet box for the host terminal. The circuit breaker in the power conductor of Circuit B is optional. If used, it should be near the operator and recessed.
Circuit C The power conductor in Circuit C (to the NCR 7870) should include a 15 Amp circuit breaker located near the operator. The circuit breaker should be recessed to prevent being accidentally switched on or off.
Note: The outlet boxes for the NCR equipment must be isolated and insulated from the ground conductor, convenient to the equipment, readily accessible, and labeled as exclusively for use with NCR equipment.
Page 57
Chapter 3: Site Preparation
3-15
Checkstand Considerations Careful planning of how the checkstand and 7870 work together can improve flow and ergonomics. An evaluation of the checkstand should take into consideration: • weight of the 7870,
• ventilation,
• service clearance to the 7870,
• display clearance,
• power on and off,
• secure fit and mounting in the cutout for the 7870,
• item diverter (optional),
• adjustable plate (optional),
Ventilation Requirements The NCR 7870 Scanner/Scale does not need an exhaust fan in the checkstand provided • there is adequate convection air flow,
• no other equipment in the checkstand raises the temperature in the checkstand to more than 7° C (12.6° F) above the ambient temperature, and
• the temperature inside the checkstand does not exceed 40° F.
If the checkstand contains other heat producing equipment, forced air may be needed to keep the temperature within the 7870’s operating range. If forced air is used, air coming into or leaving the checkstand MUST NOT enter or exit past the 7870.
Page 58
3-16
Chapter 3: Site Preparation
Service Clearance The 7870 is designed to allow servicing without removal from the checkstand. This includes component removal and replacement, scale calibration, and installation of the Weights and Measures seal. To take advantage of this design feature, an area for service clearance must be provided. Note: Access to the Power Supply may require removal of the 7870 from the checkstand.
Mounting surface for keyboard must be removable for servicing and vertical window replacement.
B Item Flow Area A
A C
A = 20.3 cm (8.0 in.) minimum if checkstand structure is not removable for servicing. 2.5 cm (1.0 in.) minimum if checkstand structure is removable for servicing. B = 33.0 cm (13.0 in.) minimum if checkstand structure is not removable for servicing. 17.8 cm (7.0 in.) minimum if checkstand structure is removable for servicing. C = 13.0 cm (5.1 in.) minimum clearance to closest checkstand panel. The 7870-1000 or 2000 must not be supported by this panel. R0117