NCR 7870 Scanner/Scale Release 1.0 User's Guide: Chapter 3: Site Preparation, pages 43 to 50

Pages 43 to 50 of 228, from NCR 7870 Scanner/Scale Release 1.0 User's Guide

The original document is the PDF (1.3 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the NCR 7870

Page 43

Chapter 3: Site Preparation

For the NCR 7870 to operate efficiently and safely, the selected installation site must meet certain requirements. Ensuring that these conditions are met and maintained will protect the 7870 from unnecessary wear and potential damage as well as easing installation. This chapter covers •

Getting Started

•

About Site Preparation

•

Customer Responsibilities

•

Environmental Requirements

•

Checkstand Power and Wiring Considerations

•

Checkstand Considerations

•

Cable Lengths and Hole Sizes

•

7870 Dimensions

Page 44

3-2

Chapter 3: Site Preparation

Getting Started The first step to preparing the selected site is to read the following two sections – About Site Preparation and Customer Responsibilities. These sections provide important information about NCR’s and your responsibilities to keep the NCR 7870 safe and in good working order. The next step is to evaluate the chosen site for its suitability. As a minimum, these conditions need to be accessed: •

Is the environment controlled within the 7870’s operational range for temperature, temperature change, relative humidity, barometric pressure, ambient light, acoustic noise, vibration, and shock?

•

Will other electronics be placed in checkstand which could necessitate use of forced air to regulate the temperature?

•

Will the power circuit to supply the 7870 be

•

•

• dedicated to NCR equipment only and so labeled,

• equipped with an isolated, insulated ground,

• providing the required input to the Power Supply,

• equipped with a recessed, 15-amp circuit breaker convenient to the checker, and

• equipped with protection against voltage transients?

Is the checkstand • able to securely support the weight of the 7870 and

• properly ventilated?

Has the plan for the checkstand design considered • use of a diverter or an adjustable plate,

• clearance needed for service and customer viewing of display,

• location and size of hole for cable routing, and

• providing enough slack in cables so 7870 may be removed from checkstand for service without disconnection?

Page 45

Chapter 3: Site Preparation

The following sections contain the NCR 7870’s requirements. These specifications will allow you to evaluate the site for installation. The last step is to implement the necessary changes before beginning the installation process described in Chapter 4: Installation.

3-3

Page 46

3-4

Chapter 3: Site Preparation

About Site Preparation This chapter contains the information necessary for the preparation of a site conforming to NCR specifications. It is very important that the site complies with the requirements in this document because, once the equipment has been installed, deficiencies in site preparation or the problems caused by these deficiencies are much more difficult to detect or correct. Further, failure to comply with these requirements or to take proper steps to protect equipment against risks identified in this document may cause serious damage to the equipment and to the customer’s business. In addition to the need to comply with the requirements specified, electrical wiring and mechanical systems must also comply with all relevant codes, laws, and regulations. It is important that the site be prepared by a customer or a customer agent who is fully conversant with the special requirements of electronic equipment. The responsibility of ensuring that the site is prepared in compliance with this document remains with the customer. For information and guidance purposes only, a list is provided, in general terms, of these matters for which the customer is responsible. This list is not intended to be comprehensive, and in no way modifies, alters, or limits the responsibility of the customer for all aspects of adequate site preparation. NCR staff is available to answer questions relating to the contents of this document, but except where: a)

the customer has been notified that a full or partial consultancy service is available and/or that NCR is willing to undertake a preliminary or final site survey and b)

the customer shall have entered into a formal contract with NCR for provision of the same.

Page 47

Chapter 3: Site Preparation

3-5

No comment, suggestion, or advice offered or not offered about preparation of the site nor any inspection of the site whether before or after preparation is to be taken as approval of the location of the site and equipment or of its preparation, and NCR is not liable in respect of any comment, suggestion, or advice given by its staff or in respect of any failure to give advice. Finally, only the customer can know the full extent of damage which may be caused to his business by reason of failure of the equipment which is to be installed. For this reason, it is the customer’s responsibility to ascertain the extent of any such possible damage to his existing or planned business, and to effect full insurance in respect of it.

Page 48

3-6

Chapter 3: Site Preparation

Customer Responsibilities The customer must do or provide the following. •

When required by NCR, provide the NCR Customer Services Representative with appropriate drawings that indicate • location of equipment,

• site wiring (power and signal, paths, and lengths),

•

Location of other equipment capable of generating large amounts of electrical noise, electromagnetic interference, heat, and so on.

•

Provide floor coverings and environmental systems that prevent static electricity build-up and discharge.

•

Provide and install necessary power distribution boxes, conduits, grounds, lightening arrestors, and associated hardware.

•

Make sure clear space and environmental requirements of the unit are met.

•

Make all building alterations necessary to meet wiring and other site requirements.

•

Make sure all applicable codes, regulations, and laws (including, but not limited to, electrical, building, safety, and health) are met.

•

Provide and install all communication cables, wall jacks, special connectors, and associated hardware.

•

Provide and install auxiliary power or other equipment as required.

Page 49

Chapter 3: Site Preparation

Environmental Requirements Operating Range Condition

Range

Temperature

10° C – 40° C

(50° F – 104° F)

Temperature Change

10° C per hour

(18° F per hour)

Relative Humidity

5% to 95%, Non-Condensing

Barometric Pressure

79.5 x 103 Pa to 105 x 103 Pa

Ambient Light

200 Foot-candles max (2152 Lux) on both scanner windows

Acoustical Noise

55 dBa or less

Vibration and Shock

1 to 10 Hz with a double amplitude of 0.127 cm (0.05 in.) 10 to 300 Hz with a maximum of 0.25 gee

Extreme Operating Range Condition

Range

Temperature

-15° C to 45° C (5° F to 113° F) one hour max

Temperature Change

20° C per hour

Relative Humidity

5% to 95%, Non-Condensing

(36° F per hour)

3-7

Page 50

3-8

Chapter 3: Site Preparation

Storage Range Condition

Range

Temperature

-15° C to 50° C

(5° F to 120° F)

Temperature Change

20° C per hour

(36° F per hour)

Relative Humidity

5% to 95%, Non-Condensing

Transit Range Condition

Range

Temperature

-40° C to 60° C

(-40° F to 140 F)

Temperature Change

20° C per hour

(36° F per hour)

Relative Humidity

5% to 95%, Non-Condensing

Barometric Pressure

74 x 103 Pa to 105 x 103 Pa