The text of a manual · part 9 of 33
9154 Line Controller System Manual, pages 81 to 90
Pages 81 to 90 of 330
The original document is the PDF (7.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Intermec 9154
Page 81
Installing the 9154 Controller
Mounting Hole
Speak er
Piacement of Optional
Rubber Mounting Feet (4 Places)
| Mounting Hole a
Figure 4-3 Mounting Tempiate
© 1987 INTERMEC Corporation
Page 4-7
Page 82
INSTALLING HARDWARE
Connecting the Controller to Ground
CAUTION
The system must be grounded and the controller grounding stud must be connected to an earth ground. Failure to connect the unit to an earth ground could result In loss of system data Integrity and the possible physical deterioration of the controller due to ESD or lightning.
The controller grounding stud must be connected to an earth ground using an 14 gauge wire. Good earth grounds include building grounding electrode systems, metallic power service conduit, or a grounded metal structure. See Section 3, “Designing a 9154 System,” for more information on selecting a good earth ground. Figure 4-4 illustrates how to connect the ground conductor to the controller's grounding stud.
To attach the ground cable to the controller grounding stud follow these steps:
1. Remove the self-locking nut from the back of the controller. Check that a star washer is on the grounding stud.
Note: The self-locking nut requires a 7/16 inch wrench. The stud has 1/4-20 threads.
2. Attach a ring lug with a 1/4 inch diameter hole to the 14 gauge ground wire. 3. Place the ring lug over the grounding stud.
4. Screw the self-locking nut back onto the grounding stud and tighten securely.
When attached, the ring lug on the ground cable should be located between the star washer on the grounding stud and the star washer attached to the self-locking nut. A tight connection with the ring lug between two star washers helps ensure a good ground connection.
Page 4-8 © 1987 INTERMEC Corporation
Page 83
Installing the 9154 Controller
Controller a Grounding Stud L Star Ss 2) Washer SQ SS fal ‘ “< } Groundwire JS With Ring Lug (not included) Self-Locking Nut
Figure 4-4 Connecting to an Earth Ground
Power Sources
The same basic controller unit is adaptable to different line voltages and frequencies by changing the power supply. The controller does not directly plug into an AC power outlet, but operates on DC power received from an external INTERMEC- supplied power supply.
AC Power Requirements: Power for the controller power supply comes from a standard AC power outlet.
The controller power supply comes with the appropriate cord for the standard AC power outlet used with the voltage and frequency the power supply is designed for. For standard USA AC power outlets it comes shipped with a three-wire plug. To operate the controller from a two-conductor outlet, use a UL- or VDE-approved, three-conductor adapter and ground the pigtail for safety.
© 1987 INTERMEC Corporation Page 4-9
Page 84
INSTALLING HARDWARE
Ensure AC power to the controller's power supply is noise-free, consistent, and at the voltage and frequency specified on the power supply case.
INTERMEC will not accept responsibility for the results of poor quality AC power sources, such as those containing power spikes. Power spikes can interrupt controller operation. If the potential for power spikes, or inconsistent power exists, INTERMEC recommends that industry approved surge protectors be placed between the power supply and the AC power source.
Power Supply: The required input voltage and frequency of the power supply is one of the options specified by the customer when the unit is ordered. Before plugging in the power supply, check to ensure that it is the proper power supply for your environment. The voltage and frequency are marked on the power supply case.
Voltage Cycles
VAC: Hz: INTERMEC Part No.: 120 50-60 046791
100 50-60 046972
220 50-60 046973
240 50-60 046974
Connecting the Power Supply: To connect the power supply, follow these four steps. Figure 4-5 illustrates how to connect the power supply.
WARNING
Before connecting the power supply, ensure that the controller Power pushbutton Is in the off position. Fallure to do so could cause Injury due to electrical shock.
Page 4-10 © 1987 INTERMEC Corporation
Page 85
Installing the 9154 Controller
1. Connect the power supply 7-Pin output plug connector to the power connector on the controller's rear panel.
2. If necessary, insert an approved three-conductor adapter and/or a surge protector into the AC power outlet socket the power supply will be connected to.
3. Insert the plug on the power supply input cable into the AC power source socket.
4. Do notturn on the controller yet. You will be instructed to turn the controller on after you have installed the system hardware.
=» (@) => 00
INTERMEC Power Supply
000900G0C00006 00.000 6 Caz) ©) [oe ws89 o|
L/ » ‘©; UT
Q 7 pontrolier Figure 4-5 Connector Connecting the Power Supply
© 1987 INTERMEC Corporation Page 4-11
Page 86
INSTALLING HARDWARE
Disconnecting the Power Supply: To disconnect the power supply from the controller, perform the following steps.
1. Disconnect, disable with the Supervisory CRT, or turn off any attached polled devices.
2. Turn off the controller.
CAUTION
Before disconnecting the power supply from the controller, ensure the controller Power pushbutton Is in the off position. If the power supply is disconnected before the controller is turned off, the controller's firmware may not function correctly on power up.
3. Disconnect the power supply from the rear of the controller.
Page 4-12 © 1987 INTERMEC Corporation
Page 87
Installing the 9154 Controller
CONNECTING THE SUPERVISORY CRT TO THE 9154
Configuration
The controller can be configured to communicate with most CRTs. To do this, however, you may need to make minor adjustments to the communication parameters controlling the controller CRT interface. Section 5, “Configuring the Controller," explains how to configure the controller CRT interface using Automatic Baud Rate Detection. All CRTs must be set for full duplex operation. If the CRT has an auto scroll mode, it should be enabled. Instructions for connecting a CRT to the controller follow.
Controller to CRT Interface
The electrical interface between the controller and the Supervisory CRT is an RS-232 standard. The controller connector is a standard 9-Pin, “D" Style, sub-miniature socket located on the front of the unit.
A9-Pin to 25-Pin interface cable, such as INTERMEC Part No. 0417898 is required to connect the CRT. The wiring diagram for this connection is shown in Figure 4-6.
The controller's Supervisory CRT connector is configured as a DCE (Data Communications Equipment) interface. The pin assignments are:
Pin No.: Signal: Direction (from controller): 2 Transmitted Data Incoming 3 Received Data Outgoing 5 Clear to Send (biased true) Outgoing 7 Signal Ground (required)
© 1987 INTERMEC Corporation Page 4-13
Page 88
INSTALLING HARDWARE 2S(- YG3-GE72Z
Connecting the Controller to the CRT Figure 4-7 displays a typical controller to Supervisory CRT connection. To make the connection follow these steps:
1. Locate the CRT terminal close to the controller. Set the CRT to full duplex operation.
2. Obtain either INTERMEC Part No. #0417898 or build an equivalent cable wired as shown in Figure 4-6.
9-Pin 25-Pin Controller Supervisory CRT Connector Connector Pin# Pin # Transmitted Transmitted Data 2 Data
Received Received Clear - To - -To- sri [5] ea”
(Biased True) Signal Signal Ground 7 LZ) Ground
DCE DTE
Figure 4-6 Controller to RS-232 CRT Wiring Diagram
Page 4-14 © 1987 INTERMEC Corporation
Page 89
Connecting the Supervisory CRT to the 9154
3. Connect the 9-Pin plug end of the connection cable to the 9- Pin socket on the front of the controller.
4. Connect the 25-Pin plug end of the connection cable to the the 25-Pin socket on the Supervisory CRT.
Supervisory CRT ~~ Po 9-pin to 25-pin Cable (Part No. 041789S) ie Controller A CRT Connect ey > 3° wt (ssn Gi) WTERMEC “y ii Ea | 5, Tt =
Figure 4-7 Connecting the Supervisory CRT to the Controller
© 1987 INTERMEC Corporation Page 4-15
Page 90
INSTALLING HARDWARE
CONNECTING THE HOST COMPUTER TO THE 9154
The host to controller communication link is an important part of the controller system. If the link is unsatisfactory, the data transmitted to and from the host may be in error. To connect the host to the controller, select an interface type, and instal! the interface using the guidelines contained in this section.
Choosing an Appropriate Interface A variety of transmission methods can be used to connect the controller with the host. Several factors effect the choice of interface:
. Baud rate
° Distance to the host
* Quantity of electrical noise in the surrounding environment . Whether the cable is shielded
For most work environments, the interfaces listed in Table 4-1 are recommended. See Section 3, "Designing a 9154 System,” for detailed information about selecting a communications interface, particularly if the interface you select does not match the recommendations in Table 4-1.
Table 4-1 Preferred Host to Controller interfaces
Distance Preferred Interface:
250 feet maximum RS-232 (up to19200 baud) 4000 feet maximum RS-422/485
Longer than 4000 feet RS-232 with Modem
After selecting a host to controller interface appropriate to the work environment, install the interface using the instructions contained in the following sections.
Page 4-16 © 1987 INTERMEC Corporation