Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 3 of 5

AT-FS724L Fast Ethernet Switch Installation Guide, pages 21 to 30

Pages 21 to 30 of 46

The original document is the PDF (420 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Allied Telesis AT-FS724L

Page 21

AT-FS724L Fast Ethernet Switch Installation Guide

Reviewing Safety Guidelines Please review the following safety guidelines before you begin to install the switch. Warning Electrical Shock Hazard: To prevent electrical shock, do not remove the cover. There are no user-serviceable parts inside. The unit contains hazardous voltages and should only be opened by a trained and qualified technician. 5 Warning Lightning Danger: Do not work on equipment or cables during periods of lightning activity. 6 Caution Power Cord: The power cord is used as a disconnection device. to deenergize equipment, disconnect the power cord. 7 Caution Pluggable Equipment: The socket outlet should be installed near the equipment and should be easily accessible. 8 Caution Air Vents: The air vents must not be blocked on the unit and must have free access to the room ambient air for cooling. 9 Caution Operating Temperature: This product is designed for a maximum ambient temperature of 40 degrees C. 10 Caution All Countries: Install product in accordance with local and National Electrical Codes. 11

13

Page 22

Installation

Installing the Switch on a Table or Desktop If you are rackmounting an AT-FS724L switch, refer to “Rackmounting the Switch” on page 15. To install the switch on a table or desktop, perform the following procedure: 1. Remove all equipment from the packaging and store the packing material in a safe place. In the event a problem occurs and you need to return the unit, please use as much of the original shipping material as possible. 2. Attach the four protective feet to the bottom of the unit. See Figure 4.

2 POWER

4

6

8

10

12

14

16

18

20

22

24

2

4

6

8

10

12

14

20

18

16

19

17

15

22

24

LNK/ACT 100M LNK/ACT AUTO MDI/MDI-X

100M 1

3

5

7

9

11

13

15

17

19

21

23

24 Port Fast Ethernet Switch

AT-FS724L

1

3

5

7

9

11

13

21

23

Figure 4 Attaching the Rubber Feet 3. Place the switch on a flat, secure surface leaving ample space around the switch for ventilation. 4. Apply power to the switch by plugging the AC/DC power adapter into an AC power outlet, then plug the DC connector to the power receptacle located on the back of the switch. 5. Verify that the POWER LED is green. If the LED is OFF, refer to “Troubleshooting” on page 19. Note The switch performs a self-diagnostic test upon power up. This takes about 20 seconds to complete. 6. Connect the twisted pair cables to a twisted pair ports on the switch and on the end-nodes. 7. Power ON the end-nodes connected to the switch. 8. Check that the LINK/ACTIVITY LED for each port on the switch is green. If a LED is OFF, refer to “Troubleshooting” on page 19. The switch is now ready for use.

14

Page 23

AT-FS724L Fast Ethernet Switch Installation Guide

Rackmounting the Switch The AT-FS724L switch can be used on a desktop or installed in a rack. For desktop installation, refer to “Installing the Switch on a Table or Desktop” on page 14. To install an AT-FS724L in a rack, perform the following procedure: 1. If attached, remove the four protective feet from the bottom of the switch as shown in Figure 5.

Figure 5 Removing the Rubber Feet 2. Remove the data cables and power cord from the switch. 3. Attach the rackmounting brackets to each side of the switch using the screws provided. See Figure 6.

Figure 6 Attaching the Rackmounting Brackets to the Switch

15

Page 24

Installation

4. Secure the switch to the rack using 2 screws (not provided) for each side as shown in Figure 7.

Figure 7 Installing the Switch to the Rack 5. Apply power to the switch by plugging one end of the power cord to the power receptacle and the other end to a power outlet. Verify that the POWER LED is green. If the LED is OFF, refer to “Troubleshooting” on page 19. Note The switch performs a self-diagnostic test upon power up. This takes about 20 seconds to complete. 6. Connect the twisted pair cables to a twisted pair ports on the switch and on the end-nodes. 7. Power ON the end-nodes connected to the switch. 8. Check that the LINK/ACTIVITY LED for each port on the switch is green. If a LED is OFF, refer to “Troubleshooting” on page 19. The switch is now ready for use.

16

Page 25

AT-FS724L Fast Ethernet Switch Installation Guide

Warranty Registration When you finish installing the product, you should register you product by completing the enclosed warranty card and sending it in.

17

Page 26

This page is a scan with no text; see it in the PDF.

Page 27

Chapter 3

Troubleshooting

Follow the guidelines below to test and troubleshoot the installation in the event a problem occurs. If the POWER LED is OFF, do the following:

‰ For an external power supply, check to be sure that the power adapter is securely connected to a power outlet and that the power adapter cable is securely connected to the back of the switch.

‰ For an internal power supply, check to be sure that the power cord is securely connected to a power outlet and that the other end of the power cord is securely connected to the back of the switch.

‰ Verify that the power outlet has power by connecting another device to it.

‰ Try using another power adapter or power cord, depending on your model. If a LINK/ACTIVITY LED is OFF, do the following:

‰ Check that the end-node connected to the port is powered ON and is operating properly.

‰ Check that the twisted pair cable is securely connected to the twisted pair port on the switch and to the port on the remote end-node.

‰ Make sure that the twisted pair cable does not exceed 100 meters (328 feet) and that you are using Category 3 or better cable for 10Base-T operation or Category 5 or better cable for 100Base-TX operation.

‰ Verify that the end-node is operating at 10 Mbps or 100 Mbps. If you are still experiencing problems after testing and troubleshooting the installation, contact Allied Telesyn Technical Support for assistance. Refer to “Contacting Allied Telesyn” on page viii or visit our web site at www.alliedtelesyn.com for support information.

19

Page 28

This page is a scan with no text; see it in the PDF.

Page 29

Appendix A

Technical Specifications

Physical Dimensions:

WxDxH 11.6 in x 7.8 in x 1.72 in)

Weight:

2.5 kg (5.5 lbs)

Environmental Maximum Operating:

0° to 40° C (32° to 104° F)

Maximum Storage:

-25° to 70° C (-13° F to 158° F)

Relative Humidity Operating:

5% to 80% (non-condensing)

Relative Humidity Storage:

5% to 95% (non-condensing)

Operating and Storage Altitude:

Up to 3,048 meters (10,000 feet)

21

Page 30

Technical Specifications

Electrical Rating Internal Universal Power Supply: 100 - 240 V AC, 50/60 Hz, 0.5A input

Agency Compliance EMI/RFI:

FCC Class B, EN55022 Class B, VCCI Class B, CISPR Class B

Electrical Safety:

EN60950 (TUV), UL 60950 (cULus)

Immunity:

EN55024

22