The text of a manual · part 3 of 3
V1400X-IDL Intelligent Distribution Line Control, pages 19 to 25
Pages 19 to 25 of 25
The original document is the PDF (369 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Vicon V1400X
Page 19
Operation Verification Procedure Input Devices •
Verify that all external equipment is powered-on and functional.
1. Setup all Input Devices in accordance with their corresponding Instruction Manuals, listed in the Reference Section of this manual. The most important factors to setup are the addresses and baud rate. The addresses must be unique for each input and the baud rate must be the same for all inputs. 2. Toggle the DL/IDL switch, on the rear panel, to the IDL position. Power-on the IDL by plugging it in. All LEDs should blink once during the IDL’s power-on test. The POWER LED will illuminate solid. All Station LEDs will illuminate solid individually. The IDL will detect the baud rate while it monitors the CPU. When the baud rate has been detected (approximately 45 sec), it will blink the CPU LED to indicate the baud rate and then illuminate it solid. One blink indicates 4800 baud, two blinks indicates 9600 baud and three blinks indicates 19200 baud. After this, LEDs can be disabled based on line conditions. Note: The CPU baud rate MUST be the same as the individual Stations for proper operation. When a Station LED is disabled, the IDL has found that line to be corrupt and shut down that Station. If that line becomes valid, the IDL will illuminate that LED. When the CPU LED is disabled, the communication has failed with the CPU. However, the IDL will continue endlessly to attempt communication with the CPU. 3. Call up consecutive Monitors and Cameras or Domes to verify communication with the CPU. 4. Repeat Monitor and Camera call up on all Input Devices to verify communication with the CPU.
Output Devices •
Verify that all external equipment is powered-on and functional.
1. Setup all Output Devices in accordance with their corresponding Instruction Manuals, listed in the Reference Section of this manual. The most important factors to setup are the addresses and baud rate. The addresses must be unique for each output and the baud rate must be the same for all outputs. 2. Toggle the DL/IDL switch, on the rear panel, to the IDL position. Power-on the IDL by plugging it in. All LEDs should blink once during the IDL’s power-on test. The POWER LED will illuminate solid. All Station LEDs will illuminate solid individually. The IDL will detect the baud rate while it monitors the output devices. When the baud rate has been detected (approximately 45 sec), it will blink the CPU LED to indicate the baud rate and then illuminate it solid. One blink indicates 4800 baud, two blinks indicates 9600 baud and three blinks indicates 19200 baud. After this, LEDs can be disabled based on line conditions. Note: The baud rates of the output devices MUST be the same as the CPU for proper operation. When a Station LED is disabled, the IDL has found that line to be corrupt and shut down that Station. If that line becomes valid, the IDL will illuminate that LED. When the CPU LED is disabled, the communication has failed with the corresponding output device. However, the IDL will continue endlessly to attempt communication with the corresponding output device. 3. Setup one or more Input Devices in accordance with their corresponding Instruction Manuals, listed in the Reference Section of this manual. 4. Call up each Output Device from each Input Device to verify proper connection to the IDL.
CPU Control System Operation To properly control Cameras and Monitors on various CPU systems, it is necessary to setup monitor partitioning and camera seize control on the CPU. Refer to the appropriate CPU Instruction Manual for information on establishing monitor partitioning and camera seize control.
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Operation • 15
Page 20
Maintenance This unit does not require any scheduled maintenance. If a unit does not operate and replacement of the fuse, as described below, does not correct the problem, contact Vicon’s Service Department.
Fuse Replacement If the unit is plugged into a known good outlet, and does not display an illuminated Power LED, replace the Fuse. The Fuse is located in the Power Block at the rear of the unit, as shown in Figure 17.
1. Unplug the Line Cord from the outlet and the Power Block.
2. Remove the Power Block Fuse Cover and remove the Fuse from the Active Slot.
3. Replace the Fuse with one specified for the appropriate model, as stated in the Technical Information Section of this manual.
4. Replace the Fuse Cover, connect the Line Cord and confirm that the Power LED illuminates.
Figure 17 Rear Panel Power Block
16 • Maintenance
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Page 21
Shipping Instructions Use the following procedure when returning a unit to the factory: 1. Call or write Vicon for a Return Authorization (R.A.) at one of the locations listed below. Record the name of the Vicon employee who issued the R.A. Vicon Industries Inc. 89 Arkay Drive Hauppauge, NY 11788 Phone: 631-952-CCTV (2288); Toll-Free: 1-800-645-9116; Fax: 631-951-CCTV (2288) For service or returns from countries in Europe, contact: Vicon Industries (U.K.) Ltd Brunel Way Fareham, PO15 5TX United Kingdom Phone: 44/(0)1489/566300; Fax: 44/(0)1489/566322 2.
Attach a sheet of paper to the unit with the following information: a.
Name and address of the company returning the unit b.
Name of the Vicon employee who issued the R.A.
c.
R. A. number d.
Brief description of the installation e.
Complete description of the problem and circumstances under which it occurs f.
Unit’s original date of purchase, if still under warranty
3. Pack the unit carefully. Use the original shipping carton or its equivalent for maximum protection. 4. Mark the R.A. number on the outside of the carton on the shipping label.
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Shipping Instructions • 17
Page 22
Reference Cable Recommendations RS-422 Protocol For all RS-422 protocol connections terminated in open wires or onto D-shell type connector use a 2conductor (twisted pair) shielded copper wire to make the connections. Refer to Table 1, Shielded, Dual Twisted-Pair Cable Maximum Operating Distances. CABLE TYPE Belden 9406 Belden 9402 Belden 8723 Belden 8162 Belden 9729 Belden 9182
DISTANCE ft (m) max. NUMBER REQUIRED 1 5000 (1500) 1 5000 (1500) 1 8000 (2400) 1 15000 (4600) 1 15000 (4600) 2 25000 (7600)
For all RS-422 protocol connections terminated in RJ-45 type (8 conductor) cable, use a cable that does not exceed 6 ft (15 m). For wire runs longer than this, use RJ-45 Termination Boxes locally and longer runs with shielded twisted-pair-cables in accordance with Table 1.
Table 1 Shielded, Dual Twisted-Pair Cable Maximum Operating Distances
Manual References for Associated Equipment CPUs V1200X V1300X VPS328/V1422
V1200X Series Transmitter/CPU Microprocessor-Based Control System VPS328/V1422 Digital Control, Installation/Operation
X379 X553 X826
Input Devices V1300X-DVC/RVC V1400X-DVC
Intelligent Remote Control Panels System Console
X777 XX090
Output Devices V1200R-LM V1301R V1311RB V1319R V15UVS V7UVS V5UVS SUR2000
18 • Reference
Multiple Receiver Outdoor Receiver Universal Receiver Dual Station Receiver Omniscan Dome Surveyor Mini Dome Surveyor 99 Dome Surveyor2000 Mini-Dome
X512 X506 X871 X825 X806 X971 X978 XX031
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Page 23
Technical Information ELECTRICAL Input Voltage:
V1400X-IDL: V1400X-IDL-230:
Power Consumption:
9 Watts.
Heat Equivalent:
0.5 btu/min (0.13 cal/min).
120 V, 60 Hz. 230 V, 50 Hz.
Note: These figures represent the conversion of 100% of the electrical energy to heat. Actual percentage of the heat generated will be less and will vary from product to product. These figures are provided as an aid in determining the extent of cooling required for an installation. Line Cord:
Standard 3-conductor SV No. 18 AWG cable with grounding plug available in 120 and 230 VAC.
Fuse:
120 VAC: 5mm x 20mm, 0.25 A, slo-blo. 230 VAC: 5mm x 20mm, 0.125 A, slo-blo.
European Community (CE) Standards:
EN 50081-1 generic emissions. EN-50082-1 generic immunity.
CONTROLS & CONNECTORS (refer to Figure 18 for panel locations) Power (LED):
Red front panel LED illuminates when unit is powered-up.
Power (connector):
Rear panel 120 or 230 VAC grounded female connector.
CPU (LED):
Yellow front panel LED indicates CPU condition, intelligent mode only.
CPU (J11 connector):
6-pin removable Screw Terminal Block connector.
Station (LEDs):
Green front panel LEDs indicate Station conditions. Stations are ready for communication after initial power-on booting has occurred (approximately 45 sec).
Station (STAT J1 - J10):
6-pin removable Screw Terminal Block for each connector.
DL/IDL Switch:
Slide switch on rear panel used to toggle the intelligent mode on and off (DL = non-intelligent mode/ IDL intelligent mode). Unit must be reset (temporarily unplugged) for the mode change to take effect.
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Technical Information • 19
Page 24
OPERATIONAL General:
Unit is operated using external devices (1 CPU and up to 10 I/O Devices). When set to intelligent mode (IDL), if one or more Stations become corrupt (device locking, incorrect wiring or excessive noise), the unit will shut down these Stations and provide status indication on the front panel LEDs. In addition, the CPU line will be monitored for status and indication will be displayed accordingly with the front panel LED.
Control Format:
RS-422 protocol data, full duplex operation at 4800, 9600 or 19200 baud.
MECHANICAL Mounting:
Desk mount (bumpers provided) or Rack mount.
Dimensions:
Height: 1.7 in. (43 mm). Width: 19.0 in. (483 mm). Depth: 7.5 in. (191 mm).
Weight:
6.5 lb (2.9 kg).
Construction:
Steel chassis and cover.
Finish:
Black baked enamel chassis and cover.
ENVIRONMENTAL Operating Temperature Range:
32 to 122°F (0 to 50°C).
Operating Humidity Range:
Up to 90% relative, noncondensing.
Storage Temperature Range:
-40° to 150° F (-40° to 65° C).
Storage Humidity Range:
Up to 90% relative, noncondensing.
Figure 18 Front and Rear Panel Views
20 • Technical Information
XX017-01-00 Rev 702 V1400X-IDL Intelligent Distribution Line Control
Page 25
Vicon Industries Inc. Corporate Headquarters 89 Arkay Drive Hauppauge, New York 11788 631-952-CCTV (2288) 800-645-9116 Fax: 631-951-CCTV (2288) !Infofax: 800-287-1207
Vicon Europe Headquarters Brunel Way Fareham, PO15 5TX United Kingdom +44 (0) 1489 566300 Fax: +44 (0) 1489 566322
Brussels Office Planet II - Unit E Leuvensesteenweg 542 B-1930 Zaventem Belgium +32 (2) 712 8780 Fax: +32 (2) 712 8781
Far East Office Unit 5, 17/F, Metropole Square 8 On Yiu Street, Shatin New Territories, Hong Kong (852) 2145-7118 Fax: (852) 2145-7117
Internet Address: www.vicon-cctv.com