Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 16 of 56

Trimble Survey Controller User Guide: Roading, pages 135 to 144

Pages 135 to 144 of 504, from Trimble Survey Controller User Guide

The original document is the PDF (5.9 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Trimble TSCe

Page 135

Roading

6

The actual intersection position of the side-slope with the existing ground surface - the catch point - is determined iteratively (by repetition). The Trimble Survey Controller software calculates the intersection of a horizontal plane passing through the current position, and either the cut or fill side-slope, as shown in Figure 6.5, where xn is the Go Right/Left value.

x1

Figure 6.5 x2 x3

Locating a catch point

3.

Navigate to the point.

4.

Use the graphical display or the text display to navigate to the point. Do one of the following: –

If you are using a conventional instrument, see Using the Graphical Display During Stakeout, page 381.

–

If you are using GPS, use the arrow as a guide and start moving towards the point, holding the TSCe data collector in front of you. The arrow points in the direction of the point to be staked out. When you walk towards the point, the arrow points to the top of the screen. Note – The direction arrow only works correctly when you are moving. Always move forwards towards the point.

Trimble Survey Controller User Guide

111

Page 136

6

Roading

When you get closer to the point, the arrow disappears. Instead, a bull’s-eye symbol represents the point and a cross represents your position, as shown in the following screen:

F

The position of the bull’s-eye symbol shows the computed position of the catch point.

5.

to go into Fine mode. For more information, see Fine Tap and Coarse Modes, page 309. Note – Construction offsets are not automatically applied to a catch point. Navigate to the catch point and then go to Step 2. Select Add constr. offsets to Catch pt and navigate to the offset point.

6.

11 2

Locate and mark the point, then do one of the following:

9

–

Measure the point. For more information, see Measuring the As-Staked Position, page 113.

–

To stake out another point, tap out roads screen.

Trimble Survey Controller User Guide to return to the Stake

Page 137

Roading 6.4.5

6

Measuring the As-Staked Position m m s s

To measure the as-staked position, locate and mark the point, hold the range pole vertically over the point, and then do the following: 1.

2.

In the graphical display screen, tap following:

, then do one of the

–

In a GPS survey, the Stake out point screen appears. Enter a value for the point name and tap . The button appears when enough data has been collected. Tap it to store the point.

–

In a conventional survey, the store the point.

button appears. Tap it to

If the View deltas before storage check box in the Stakeout settings screen is selected, and you are staking out a non-side-slope point, screens similar to those shown below appear:

Trimble Survey Controller User Guide

113

Page 138

6

Roading

If you are staking out a side-slope point, screens similar to those shown below appear:

Note – The value in the S.dist to hinge + Constr off: field includes any construction offset values specified and reports the slope distance from the hinge to the as-staked position. The value is null (?) if there is no horizontal construction offset specified or the horizontal construction offset is applied horizontally. Note – The value in the Design elevation field and the H.Offset field for the design road is null (?) for catch points.

B

11 4

å

Tip – Tap to view the Stake template deltas screen. It shows the horizontal offset and vertical distance from the catch point to the end of each template element, up to and including the centerline. If the template includes a cut ditch, the report will include the hinge position at the toe of the cut slope. The reported values exclude any construction offset specified.

Trimble Survey Controller User Guide

Page 139

Roading

6

Figure 6.6 explains some of these fields.

A

A

F

F

J

H D

D

C

E J G

C

E

H B

B Figure 6.6

Typical cross-section of a road

Where: A = Distance to center line B = Horizontal distance to hinge point C = Vertical distance to hinge point D = Slope E = Slope distance to hinge point F = Construction horizontal offset G = Ditch offset H = Hinge point J s

= Catch point to store the point.

3.

Tap

4.

Stake out more points. For more information, see Staking out Points on the Road by Station and Offset, page 95. When there are no more points to stake out, tap to the Survey menu.

9 to return

Trimble Survey Controller User Guide

115

Page 140

6

Roading

6.5

Measuring Positions on the Road When you use the Trimble Survey Controller software to measure points, it can display your current position on the road.

6.5.1

Determining Current Position Relative to a Road To determine your current position relative to a road: 1.

From the main menu, Survey / Stakeout / Roads. The following screen appears:

2.

In the Road name field, select the road to be staked out.

V l k

Tip – To select a road, access the Road name field and tap view a list of available roads. Highlight the required road. . To edit the road, tap To review the selected road, tap the Key in Road screen.

11 6 to and use

3.

In the Stake field, select Position on road.

4.

Enter a value in the Antenna/Target height field and make sure that the Measured to field is set correctly.

5.

If there is a value in the V.Offset field, the Trimble Survey Controller software reports your position relative to the design, as adjusted by the specified vertical offset:

Trimble Survey Controller User Guide

Page 141

Roading

–

6

A negative value offsets the design vertically down, a positive value up.

x

Note – The V.Offset value specified here is not applied to a DTM surface.

6.

. The following screen shows your position relative to Tap the road. If you are using a conventional instrument, refer to the screen on the right:

Note – If you are using a conventional instrument, the road values only appear after you take a distance measurement. The top of the screen displays the road name. For information about the icons that appear in the top right of the screen, see Table 6.3, page 102. The right side of the screen displays values in the following fields: –

North–the northing coordinate of the current position

–

East–the easting coordinate of the current position

–

Station–the station value of the current position relative to the road

–

Offset (left/right)–the offset value of the current position relative to the road

–

V. dist–the vertical distance (cut/fill) of the current position to the road

Trimble Survey Controller User Guide

117

Page 142

6

Roading

In the graphical display, shown in Figure 6.7, the road is shown as an icon. It represents a portion of the centerline and shows the direction of increasing stationing. If your current position is more than 25 meters (about 75 feet) from the centerline, the arrow guides you to a position on the centerline. (The software calculates this position by projecting your current position at right angles to the centerline.) If your current position is off the road, that is, your current position is before the start station or beyond the end station of the road, the arrow guides you to the start of the road.

Direction of increasing station

+ Figure 6.7

7.

11 8

Your current position

Road icon in the graphical display screen

Do one of the following: –

Measure the point. For more information, see the next section.

–

Move to another position on the road and repeat the steps described above.

Trimble Survey Controller User Guide

Page 143

Roading 6.5.2

6

Measuring Current Position Relative to the Road m

To measure the current position relative to the road, do the following: 1.

In the graphical display screen, tap following: –

– 2.

s and then do one of the m a s

In a GPS survey, the Stake out point screen appears. Enter . The values for the point name and code and tap button appears. Tap it to store the point.

. The In a conventional survey, tap appears. Tap it to store the point.

button

If the View deltas before storage field in the Stakeout settings screen is set to Yes, a screen similar to the one shown below appears:

Note – The design elevation excludes any V.Offset specified. If your position is before the start station or after the end station, the Station field displays “Off road”, and the Offset and V.Dist fields display null (“?”). If your position is within the start and end station values but at a greater offset than either the left or right catch points, the Station and Offset fields display the relevant values but the V.Dist field displays null (“?”).

Trimble Survey Controller User Guide

119

Page 144

6

12 0

Roading

Trimble Survey Controller User Guide