Page 473

Roading

18

Table 18.4 explains the Select menu options for a side slope. Table 18.4

Select Menu Options

Option

Description

Catch point (Auto)

The Trimble Survey Controller software selects the side slope (cut or fill) to intersect with the ground. This is the default.

Catch point (Cut)

Fixes the side slope as a cut side slope.

Catch point (Fill)

Fixes the side slope as a fill side slope.

Add Constr. offsets to Catch Applies the horizontal and vertical construction pt offsets specified to the catch point. Navigate to the catch point before selecting this option. The position of the offset point depends on the catch point, so make sure that you stake out the catch point precisely. Hinge point

Stakes out the base of the side slope. This is the most direct way to select the hinge point if the template includes a ditch offset. Notes: Construction offsets are not applied to the hinge point when you use this method to select the hinge point. The default is Hinge.

*

Note – Construction offsets are not automatically applied to a catch point. Navigate to the catch point and then press . Select Add Constr. offsets to Catch pt and navigate to the offset point. There is no need to press construction offsets.

* when staking out a catch point with no

Trimble Survey Controller Reference Manual Volume 2

441

Page 474

18

Roading

The actual intersection position of the side slope with the existing ground surface - the catch point - is determined iteratively (by repetition). The Trimble Survey Controller software calculates the intersection of a horizontal plane passing through the current position, and either the cut or fill side slope. In Figure 18.14 xn is the Go Right/Left value.

x1 x2 x3

Figure 18.14 Locating a Catch Point

3.

Navigate to the point.

4.

Use the graphical display or the text display to navigate to the point. Do one of the following: –

If you are using a conventional instrument, see Using the Graphical Display During Stakeout, page 504.

–

If you are using GPS, use the arrow as a guide and start moving towards the point, holding the TSC1 data collector in front of you. The arrow points in the direction of the point to be staked out. Walk towards the point. When you are walking in the direction of the point, the arrow points to the top of the screen. Note – The direction arrow only works correctly once you are moving. Always move forwards towards the point.

44 2

Trimble Survey Controller Reference Manual Volume 2

Page 475

Roading

18

When you get closer to the point, the arrow disappears. Instead, a bull’s eye symbol represents the point and a cross represents your position. See Figure 18.15.

Figure 18.15 Stakeout Graphical Display – Side Slope Point

F

The position of the bull’s-eye symbol shows the computed position of the catch point. 5.

to go into Fine mode. For more information, see Press Fine and Coarse Modes, page 399. Note – Construction offsets are not automatically applied to a catch point. Navigate to the catch point and then go to Step 2. Select Add constr. offsets to Catch pt and navigate to the offset point.

6.

Locate and mark the point, then do one of the following: –

Measure the point. See Measuring the As-Staked Position, page 444.

–

=

Stake out another point. To do this, press screen.

to return to the Stakeout/Roads

Trimble Survey Controller Reference Manual Volume 2

443

Page 476

18 18.5.2

Roading

Measuring the As-Staked Position m

Locate and mark the point. Then hold the range pole vertically over the point and do the following: 1.

In the graphical display screen press following: –

– 2.

s

In a GPS survey, the Survey/Measure points screen appears. Enter a value for the point name and press The key appears when enough data has been collected. Press it to store the point. In a conventional survey, the store the point.

s m

If the View deltas before storage field in the Stakeout settings screen is set to Yes and you are staking out a non-side slope point, screens similar to those shown in Figure 18.16 appear.

Trimble Survey Controller Reference Manual Volume 2

.

key appears. Press it to

Figure 18.16 Stakeout deltas – non-side slope point

44 4

. Then do one of the

Page 477

Roading

18

If you are staking out a side slope point, screens similar to those shown in Figure 18.17 appear.

Figure 18.17 Stakeout deltas – side slope point

Note – The value in the S.dist to hinge + Constr off: field includes any construction offset values specified and reports the slope distance from the hinge to the as-staked position. The value is null (?) if there is no horizontal construction offset specified or the horizontal construction offset is applied horizontally. Note – The value in the Design elevation field and the H.Offset field for the design road is null (?) for catch points.

B

å

Tip – Press to view the Stake template deltas screen. It shows the horizontal offset and vertical distance from the catch point to the end of each template element, up to and including the centerline. If the template includes a cut ditch the report will include the hinge position at the toe of the cut slope. The reported values exclude any construction offset specified.

Trimble Survey Controller Reference Manual Volume 2

445

Page 478

18

Roading

Figure 18.18 explains some of these fields.

A

A

F

F

J

H D

D

C

E

E

H

J G

C

B

B Figure 18.18 Typical cross-section of a road

Where: A = Distance to center line B = Horizontal distance to hinge point C = Vertical distance to hinge point D = Slope E = Slope distance to hinge point F = Construction horizontal offset G = Ditch offset H = Hinge point J s

= Catch point to store the point.

3.

Press

4.

To stake out more points return to Staking Out Points on the Road by Station and Offset, page 425. When there are no more points to stake out, press to the Survey menu.

44 6

Trimble Survey Controller Reference Manual Volume 2

= to return

Page 479

Roading

18.6

18

Measuring Positions on the Road When you use the Trimble Survey Controller software to measure points, it can display your current position on the road.

18.6.1

Determining your Current Position Relative to a Road To determine your current position relative to a road: 1.

From the main menu, choose Survey. From the Select Survey Style list, choose a real-time Survey Style.

2.

Select Survey / Stakeout. The Stakeout menu appears.

3.

Select Roads. The screen shown in Figure 18.19 appears.

Figure 18.19 Survey/Stakeout/Road screen

4.

B l

In the Road name field, select the road to be staked out.

5.

Press

6.

In the Stake field, select Position on road.

V

( k

Tip – To select a road, highlight the Road name field and press . Press to view a list of available roads, and highlight the required road.

To review the selected road, press and use the Key in/Road screen.

\

.. To edit the road, press to enter the name in the Road name field.

Trimble Survey Controller Reference Manual Volume 2

447

Page 480

18

Roading

7.

Enter a value in the Antenna height field and make sure that the Meas. to field is set correctly.

8.

If there is a value in the V.Offset field, the Trimble Survey Controller software reports your position relative to the design, as adjusted by the specified vertical offset: –

A negative value offsets the design vertically down.

–

A positive value offsets the design vertically up.

x

Note – The V.Offset value specified here is not applied to a DTM surface. 9.

. Figure 18.20 shows the Position on Road Graphical Press Display Screen that appears. It shows your position relative to the road. If you are using a conventional instrument, refer to the screen on the right.

Figure 18.20 Position on road graphical display screens

Note – If you are using a conventional instrument, the road values only appear after you take a distance measurement. The top of the screen displays the road name. For information about the icons that appear in the top right of the screen, see Table 18.3. The right side of the screen displays values in the following fields:

44 8

–

North–the northing coordinate of the current position

–

East–the easting coordinate of the current position

Trimble Survey Controller Reference Manual Volume 2

Page 481

Roading

18

–

Station - the station value of the current position relative to the road

–

Offset (left/right) - the offset value of the current position relative to the road

–

V. dist - the vertical distance (cut/fill) of the current position to the road

In the graphical display, the road is shown as an icon. It represents a portion of the centerline and shows the direction of increasing stationing. If your current position is more than 25 m (about 75 feet) from the centerline, the arrow guides you to a position on the centerline. (The software calculates this position by projecting your current position at right angles to the centerline.) If your current position is off the road; that is, your current position is before the start station or beyond the end station of the road, the arrow guides you to the start of the road. See Figure 18.21. Direction of increasing station

+

Your current position

Figure 18.21 Road icon in the graphical display screen

10. Do one of the following: –

Measure the point. For more information, see the next section.

–

Move to another position on the road and repeat the steps described above.

Trimble Survey Controller Reference Manual Volume 2

449

Page 482

18 18.6.2

Roading

Measuring the Current Position Relative to the Road m

To measure the current position relative to the road, do the following: 1.

2.

In the graphical display screen, press following:

m s

. Then do one of the

–

In a GPS survey, the Survey/Measure points screen appears. Enter values for the point name and code and . The key appears. Press it to store the press point.

–

In a conventional survey, press appears. Press it to store the point.

z s . The key

If the View deltas before storage field in the Stakeout settings screen is set to Yes, a screen similar to the one shown in Figure 18.22 appears.

Figure 18.22 Survey screen

Note – The design elevation excludes any V.Offset specified. If your position is before the start station or after the end station, the Station field displays ‘Off road’, and the Offset and V.Dist fields display null (‘?’). If your position is within the start and end station values but at a greater offset than either the left or right catch points, the Station and Offset fields display the relevant values but the V.Dist field displays null (‘?’).

45 0