Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 53 of 83

Trimble Survey Controller Reference Manual: Roading, pages 463 to 472

Pages 463 to 472 of 744, from Trimble Survey Controller Reference Manual

The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Trimble TSC1

Page 463

B

^

Roading

18

Tip – Select an offset from the list or by using the softkey, and for all subsequent station values the offset value will update to reflect any widening or interpolation. Enter an offset value and for all subsequent station values the offset value will be maintained, even when the entered value corresponds to a value in the list. Consider Figure 18.6. Select offset 5 m at station 0 m and for subsequent stations the offset value will update to follow the solid line, moving from offset 5 m to offset 8 m. Enter 5 m for the offset and for subsequent stations the offset will follow the dashed line, maintaining offset 5 m.

0m

40m

100m

8m Figure 18.6

Offset selection

10. If there is a value in the Construction H.Offset field, the Construction H.Offset applied field specifies how it is applied. Do one of the following: –

To apply the offset horizontally, select Horizontal.

–

To apply the offset at the slope value of the previous template element, select Slope.

You cannot apply construction horizontal offsets at the slope value of the previous template element for points with zero offset.

Trimble Survey Controller Reference Manual Volume 2

431

Page 464

18

Roading

Figure 18.7 shows how the Horizontal and Slope options are used in the Construction H.Offset applied field.The construction V.Offset value in the diagram is 0.000. Stake Construction H.Offset applied field set to Slope

Point selected for stakeout

Construction H.Offset applied field set to Horizontal

Previous template element

Construction H.Offset

Figure 18.7

Options in the Construction H.Offset applied field

11. If there is a value in the Construction H.offset field, the Trimble Survey Controller software directs you to a point that is offset from the design point. A negative value offsets the point towards the centerline (in). A positive value offsets the point away from the centerline (out). Note – If you enter a value for the Construction H.Offset on the centerline (at offset 0.00 m), a negative value offset is to the left. 12. If there is a value in the Construction V.Offset field, the Trimble Survey Controller software directs you to a point that is offset vertically from the design point, as follows:

43 2

–

A negative value offsets the point vertically down.

–

A positive value offsets the point vertically up.

Trimble Survey Controller Reference Manual Volume 2

Page 465

Roading

18

Note – Construction offsets are not automatically applied to a side slope offset. For more information, see page 441. Construction offset values specified here are not applied to a DTM surface.

18.5.1

Navigating to a Point on the Road The navigation process that the Trimble Survey Controller software uses depends on whether you are staking out a non-side slope point or a side slope point. Note – Before navigating to the point in a GPS survey, make sure that the survey is initialized. For more information, see RTK Initialization Methods, page 321. Icons in the graphical display screen Table 18.3 lists the icons that appear in the top right of the graphical display screen when you stake out a point on a road. (The graphical display screen is shown in Figure 18.8 on page 434.) Table 18.3 Icon

Icons in the Graphical Display Screen Information about the point staked out The point is on the left side of the road and is in cut (the elevation of the design point is lower than the current position). The point is on the left side of the road and is in fill (the elevation of the design point is higher than the current position). The point is on the right side of the road and is in cut (the elevation of the design point is lower than the current position). The point is on the right side of the road and is in fill (the elevation of the design point is higher than the current position).

Trimble Survey Controller Reference Manual Volume 2

433

Page 466

18

Roading

Note – In addition, for side slope positions the slope value is displayed below the icon. For non-side slope positions the code (or offset value, if no code is assigned) is displayed below the icon. Navigating to a non-side slope point x

To navigate to a non-side slope point: 1.

. The stakeout graphical screen Select a point and press display appears, as shown in Figure 18.8. If using a conventional instrument, refer to the screen on the right.

Figure 18.8

Stakeout graphical display for non-side slope point – GPS or conventional survey

The station value for the point appears at the top of the screen. An icon to the right indicates: – on which side of the road the point lies

– whether the point is in cut or fill

– the code (or offset value, if no code is assigned) for the point For more information, see Icons in the graphical display screen, page 433.

43 4

Trimble Survey Controller Reference Manual Volume 2

Page 467

Roading

18

The left side of the screen shows the compass arrow, and the right side of the screen displays values in the following fields: –

Azimuth – the azimuth to the point In a conventional survey, this field is replaced by Go In (or Go Out).

–

Horizontal Distance – the horizontal distance to the point. This value is also shown at the bottom of the graphical display screen. In a conventional survey, this field is replaced by Go Left (or Go Right).

–

Vertical Distance (cut/fill) – the distance between the present position and the design position being staked out

–

Road: Go Forward (or Go Backward) – the distance from the current position to the point, relative to the road. Forward is towards the end station, backward is towards the start station.

–

Road: Go Left (or Go Right) – the distance from the current position to the point, relative to the road. If you are facing the end station, ‘Left’ is on your left.

Note – The forward/backward and right/left values are relative to the cross-section of the point being staked out (see Figure 18.9). They are not relative to the current direction of travel or to the current stationing and they do not represent delta stationing and offset values for points on curved sections of the road. Note – If you are using a conventional instrument, the road values only appear after you take a distance measurement.

Trimble Survey Controller Reference Manual Volume 2

435

Page 468

18

Roading

Figure 18.9 shows an example of the forwards direction and the right direction when staking out a point.

Direction of increasing stationing

Forwards

Right

Figure 18.9

2.

Forwards direction and right direction

Use the graphical display or the text display to navigate to the point. Do one of the following: –

If you are using a conventional instrument, see Using the Graphical Display During Stakeout, page 504.

–

If you are using GPS, use the arrow as a guide and start moving towards the point, holding the TSC1 data collector in front of you. The arrow points in the direction of the point to be staked out. Walk towards the point. When you are walking in the direction of the point, the arrow points to the top of the screen. Note – The direction arrow only works correctly once you are moving. Always move forward towards the point.

43 6

Trimble Survey Controller Reference Manual Volume 2

Page 469

Roading

18

When you get closer to the point, the arrow disappears. Instead, a bull’s-eye symbol represents the point and a cross represents your position. See Figure 18.10.

Figure 18.10 Stakeout graphical display for non-side slope point

Note – When you navigate to a non-side slope point with construction offsets, the bull’s-eye symbol represents the offset point.

F

3.

to go into Fine mode. For more information, see Press Fine and Coarse Modes, page 399.

4.

When the two symbols coincide, check the precisions and mark the point.

Trimble Survey Controller Reference Manual Volume 2

437

Page 470

18

Roading

Note – The symbol that shows the position of the point also shows the road–space coordinate frame. The longer line points in the direction of increasing station, the shorter line points in the direction of increasing offset (the offset increases from left to right). See Figure 18.11.

Direction of increasing stationing Direction of increasing offset (right side of road)

Figure 18.11 Point icon in the graphical display screen

5.

Do one of the following: –

Measure the point. For more information, see Measuring the As-Staked Position, page 444.

–

To do this, press screen.

43 8

=

Stake out another point. to return to the Stakeout/Roads

Trimble Survey Controller Reference Manual Volume 2

Page 471

Roading

Navigating to a side slope point To navigate to a side slope point: 1.

18 x

. The stakeout graphical Select a side slope point and press screen display appears, as shown in Figure 18.12. If using a conventional instrument, refer to the screen on the right.

Figure 18.12 Stakeout graphical display for side slope point – gps or conventional survey

The station value for the point appears at the top of the screen. An icon to the right indicates: – on which side of the road the point lies

– whether this is a cut slope or a fill slope

– the slope value of the side slope

For more information, see Icons in the graphical display screen, page 433. Note – For side slope offsets where the slope changes between templates, the Trimble Survey Controller software calculates the side slope for intermediate stations by interpolating the slope value. For more information, see When Side Slopes are Different, page 633.

Trimble Survey Controller Reference Manual Volume 2

439

Page 472

18

Roading

The screen shows a graphical display and text. The fields that appear are the same as the fields that appear in the display for a non-side slope point (see page 435). Note – Values in the ∆Backward (or ∆Forward) and ∆Left (or ∆Right) fields are relative to the cross-section of the point that is being staked out.They are not relative to the current stationing and do not represent delta stationing and offset values for points on curved sections of the road. For more information, see Figure 18.9 on page 436. The graphical display also shows a dashed line that connects the side slope catch position to the side slope hinge position.

*

Note – A ‘catch point’ is the point where the side slope intersects with the ground. 2.

to select a side slope option, as shown in Press Figure 18.13.

Figure 18.13 Select menu – side slope point

44 0

Trimble Survey Controller Reference Manual Volume 2