The text of a manual · part 52 of 83
Trimble Survey Controller Reference Manual: Roading, pages 453 to 462
Pages 453 to 462 of 744, from Trimble Survey Controller Reference Manual
The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSC1
Page 453
CHAPTER
18 18
Roading In this chapter: ■
Introduction
■
Uploading or keying in road information
■
Reviewing the road information
■
Viewing a road in current job map
■
Staking out points on the road by station and offset
■
Measuring positions on the road
Page 454
18
18.1
Roading
Introduction This chapter shows you how to stake out roads and determine your position relative to a road design. It explains how to review roading information and select a point to stake out on a road. It shows how to navigate to a non-side slope point and a side slope point, and measure an as-staked point.
C
18.2
Warning – Do not stake out points and then change the coordinate system or perform a calibration. If you do, these points will not be in terms of the new coordinate system. They will also be inconsistent with points staked out after the change.
Uploading or Keying In Road Information Before staking out a road or determining your position relative to a road, key in or upload a road definition. To key in a road definition see Key In Roads, page 543, andKey In Templates, page 556. To upload a road definition, use the RoadLink™ software (a module of the Trimble Geomatics Office™ software and the Trimble Survey Office™ software). For more information about how to transfer files see, Chapter 9, Data Transfer. Each road is uploaded as a job. To open a job, select Files / Job management. Note – Once the files are uploaded, you can copy several roads into a single job. For more information, see Copying Data Between Jobs, page 6-6. Each road uploaded using RoadLink contains the coordinate system for the road. Roads always have grid coordinates.
42 2
Trimble Survey Controller Reference Manual Volume 2
Page 455
Roading
18
Note – The Trimble Survey Controller software treats all road distances, including stationing and offset values, as grid distances. The value in the Distances field (accessed by selecting Configuration / Job / Cogo settings) has no effect on the road definition or the way road distances are displayed.
18.3
Reviewing the Road Information To review road information in the Trimble Survey Controller software: 1.
Open the job.
2.
From the main menu, select Files / Review current job.
The following section describes the roading records that appear.
18.3.1
Roading Records Information about a road appears in the following order: 1.
The name of the road. This record includes: a.
Horizontal alignment elements. These records appear in order of increasing stationing. There is a record for each alignment element.
b.
Vertical alignment elements. These records appear in order of increasing stationing. There is a record for each alignment element.
c.
Template records. Templates define the cross-sections used along the road. Template records show what templates are used at the various stations along the road. There is a record each time the template changes. These records appear in order of increasing stationing. Trimble Survey Controller Reference Manual Volume 2
423
Page 456
18
Roading d.
Superelevation and/or widening records. There is a record each time the superelevation and/or widening changes. These records appear in order of increasing stationing.
2.
The name of the template(s). This record includes the template elements that define the crosssection of the road, starting from the center line. Each record defines an element in the template.
Note – If a road has a horizontal and vertical alignment but no templates, all offset points display a null (?) value in the V.Dist field during stakeout. If a road definition is defined only as a horizontal alignment, you can only stake it out in two dimensions. The horizontal and vertical alignments of a road do not necessarily start and end at the same stationing. When they do not, you can only stake out points in three dimensions if their stations lie within the horizontal alignment.
42 4
Trimble Survey Controller Reference Manual Volume 2
Page 457
Roading
18.4
18
Viewing a Road in Current Job Map To view the center line of a road in the Current job map screen, select Files / Current job map. A screen similar to the one shown in Figure 18.1 appears.
Figure 18.1
18.5
Road in current job map screen
Staking Out Points on the Road by Station and Offset Before staking out a point on the road read General Procedure, page 396, and Stakeout Settings, page 397. To select a point on a road: 1.
From the main menu, choose Survey. From the Select Survey Style menu, choose a real-time Survey Style.
2.
Select Survey / Stakeout. The Stakeout menu appears.
Trimble Survey Controller Reference Manual Volume 2
425
Page 458
18
Roading
3.
Select Roads. The Survey / Stakeout / Road screen appears, as shown in Figure 18.2.
Figure 18.2
4.
B
Survey/Stakeout/Road screen l k
In the Road name field, select the road to be staked out.
5.
Press
V
(
Tip – To select a road, highlight the Road name field and press . Press to view a list of available roads, and highlight the required road. To review the selected road, press now. To edit the road, press . Use the Key in / Road screen that appears to edit the road.
\ to enter the name in the Road name field.
The Code field displays the code of the offset to be staked out. The Trimble Survey Controller software uses the code from the template definition for the selected offset. When the offset is 0.000 m, the code defaults to CL.
B
Tip – If you stake out a point and then measure it, you can edit the code in the Confirm staked deltas screen. Alternatively, store the point and then select Files / Review current job to edit the code. To change the default code for the template element, select either Key In / Templates or Files / Review current job.
6.
42 6
In the Stake field select Station and offset.
Trimble Survey Controller Reference Manual Volume 2
Page 459
Roading
7.
18
Enter a value in the Antenna height field and make sure that the Meas. to field is set correctly. Note – This is especially important when staking out a catch point. The Trimble Survey Controller software can accurately locate the point only if this setting is correct.
8.
Select the station to be staked out. Do one of the following: – l
Select it from a list.
(
To do this, highlight the Station field and press . Press to display a list of stations, as shown in Figure 18.3.
Figure 18.3
Select a station screen showing abbreviations used
The list contains the stations defined by the section interval, and the stations where the horizontal or vertical alignment changes. Table 18.1 lists the abbreviations that the Trimble Survey Controller software uses. Table 18.1
Stationing Abbreviations
Abbreviation
Meaning
RS
Road start
XS
Cross-section
TS
Tangent to spiral
SC
Spiral to curve
Trimble Survey Controller Reference Manual Volume 2
427
Page 460
18
Roading Table 18.1
Stationing Abbreviations (Continued)
Abbreviation
Meaning
CS
Curve to spiral
ST
Spiral to tangent
PC
Point of curvature (Tangent to curve)
PT
Point of tangent (Curve to tangent)
SS
Spiral to spiral
PI
Point of intersection
VCS
Vertical curve start
VCE
Vertical curve end
VPI
Vertical point of intersection
RE
Road end
–
Enter a value.
+
-
The value must be between the Start station and the End station for the road. – 9.
Select the offset to be staked out. Do one of the following: –
42 8 to select the next station in the list. Select Press to select the previous station in the list.
Select a specific offset from a list.
Trimble Survey Controller Reference Manual Volume 2
Page 461
Roading l
18
(
To do this, highlight the Offset field and press . Then press to display a list of offsets, as shown in Figure 18.4.
Figure 18.4
Select an offset screen
The list includes all offsets and their codes (if assigned). In Key in / Template, these codes are assigned as part of the template element. In the RoadLink software (a module of the Trimble Geomatics Office and Trimble Survey Office software), you assign a code in the template definition. –
Enter a value. Enter a negative value for an offset to the left of the center line, a positive value for an offset to the right. If you enter a value greater than the maximum offset in the template, a message appears. It warns that the offset is outside the range, and asks if you want to use the left (or right, depending on the value entered) side slope.
n another message appears. It warns that If you press point positions will be in two dimensions, and asks whether you want to continue. This option is useful if you need to stake out the two-dimensional position of a feature not defined in the template (the position of a lamppost, for example).
Trimble Survey Controller Reference Manual Volume 2
429
Page 462
18
^
Roading
–
Press and select an option from the Offset menu, as shown in Figure 18.5.
Figure 18.5
Offset menu
Table 18.2 describes these options.
43 0
Table 18.2
Offset Menu Options
Option
Description
Leftmost
Selects the leftmost template element
Next left
Decrements the offset (selects the previous record in the list of offsets)
Next right
Increments the offset (selects the next record in the list of offsets)
Rightmost
Selects the rightmost template element
Trimble Survey Controller Reference Manual Volume 2