The text of a manual · part 42 of 83
Trimble Survey Controller Reference Manual: Starting the Rover Receiver, pages 357 to 364
Pages 357 to 364 of 744, from Trimble Survey Controller Reference Manual
The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSC1
Page 357
Starting the Rover Receiver 12.6.4
12
Using the Initializer Bar There are two ways to initialize a Trimble 4600LS receiver using the Initializer Bar method. Method 1 (Slot method) 1.
Attach the roving antenna to the initializer bar as shown in Figure 12.5.
2.
With a pocket compass, measure the azimuth from the base antenna to the rover antenna. This value should be accurate to 20°. Also measure the vertical offset of the rover antenna. If the antennas at the base and rover receivers are identical, the vertical offset is zero.
3.
From the Survey menu, choose Initialization.
4.
Set the Method field to Init bar (slot) and press
5.
In the Azimuth field, enter the value measured with the pocket compass. Enter appropriate values in the Horizontal offset and Vertical offset fields.
\
.
Note – The horizontal offset is 0.25 m. This is indicated on the bar.
6.
x\ O
When the rover antenna is properly attached and aligned, press or .
The data collector starts to record data, and the static icon appears in the status line. 7.
When the receiver has initialized, the results are displayed and softkey appears. Press it to accept the initialization. the
Trimble Survey Controller Reference Manual Volume 2
325
Page 358
12
Starting the Rover Receiver
Figure 12.5 shows the initializer bar setup using Method 1 (the Slot method).
Radio antenna
4600LS
4600LS
Initializer bar
Figure 12.5
32 6
Initializer bar – method 1 (slot method)
Trimble Survey Controller Reference Manual Volume 2
Page 359
Starting the Rover Receiver
12
Method 2 (Notch method) If the rover is subsequently initialized during the survey, it is possible to leave the antenna on the range pole and lean/plumb it against the initializer bar in the notch provided (see Figure 12.6). The procedure is similar to Method 1 but you set the Method field to Init bar (notch), and enter the height of the rover antenna instead of the vertical offset. The horizontal offset is 0.35 m. Figure 12.6 shows the initializer bar setup using Method 2 (the Notch method). 4600LS
Radio antenna Range pole
4600LS
Initializer bar
Figure 12.6
Initializer bar – method 2 (notch method)
Note – With this method, the tip of the range pole must be level with the base mark.
Trimble Survey Controller Reference Manual Volume 2
327
Page 360
12
12.7
Starting the Rover Receiver
Recommended RTK Initialization Procedure This section describes the procedure that Trimble recommends for performing a check on a New Point or an OTF RTK initialization. Minimize the chance of surveying with a bad initialization by adopting good survey techniques. A bad initialization occurs when the integer ambiguities are not correctly resolved. The Trimble Survey Controller software automatically reinitializes when this is detected, but cannot do so if you end the survey too soon. As a precaution, always perform the RTK initialization described below. When initializing, always choose a site that has a clear view of the sky and is free of obstructions that could cause multipath. Note – Known Point is the quickest method of initialization when known points exist. To perform a New Point or OTF initialization: 1.
B
Initialize the survey using the New Point or OTF method of initialization.
Tip – When performing an OTF initialization, move around. This reduces the effect of multipath.
2.
When the system is initialized, establish a mark about 9 meters or 30 feet from where the initialization occurred.
3.
Conduct a static point measurement over the mark. Once this is done, discard the current initialization.
4.
If using an adjustable height range pole, change the height of the antenna by approximately 8 inches.
5.
Reoccupy the mark observed in Step 2, and reinitialize the survey using the Known Point method of initialization. Remember to enter the new antenna height details.
Follow this procedure to substantially minimize the occurrence of a bad initialization.
32 8
Trimble Survey Controller Reference Manual Volume 2
Page 361
Starting the Rover Receiver
12
Measuring a New point creates a Known point on which the first initialization is tested. Changing the antenna height moves the GPS antenna from the environment in which the test point was initially surveyed. Always enter the new antenna height before starting the Known Point initialization.
12.8
Postprocessed Initialization Methods In a postprocessed survey initialization must be gained to attain centimeter-level precisions. Use one of the following methods to initialize dual-frequency postprocessed (PP) kinematic surveys in the field: •
On-The-Fly (OTF)
•
Known Point
•
New Point
Note – The OTF receiver option is not necessary for postprocessed OTF initializations. Use one of the following methods to initialize single-frequency PP kinematic surveys in the field: •
Known Point
•
New Point
Always collect sufficient raw data when using these methods. Table 12.2 shows the time required to initialize a postprocessed kinematic survey using the various initialization methods. Table 12.2
Trimble PP Kinematic Initialization Times
Initialization method
4 SVs
5 SVs
6+ SVs
L1/L2 OTF initialization
N/A
15 min
8 min
L1/L2 New Point initialization
20 min
15 min
8 min
Trimble Survey Controller Reference Manual Volume 2
329
Page 362
12
Starting the Rover Receiver Table 12.2
Trimble PP Kinematic Initialization Times (Continued)
Initialization method
4 SVs
5 SVs
6+ SVs
L1 New Point initialization
30 min
25 min
20 min
Known Point initialization at least four epochs
Note – In a postprocessed survey, collect enough data during initialization so that the WAVE™ processor can successfully process it. Table 12.2 shows Trimble’s recommended times. After initialization, the survey mode changes from Float to Fixed. The mode remains Fixed if the receiver continuously tracks at least four satellites. If the mode changes to Float, reinitialize the survey. Note – If you do an On-The-Fly initialization in a postprocessed kinematic survey, it is possible to measure points before initialization is gained. The GPSurvey software can back-process the data later to give a fixed solution. If you do this but lose lock on the satellites while initializing, re-measure any one of the points that you surveyed before lock was lost.
I
\
To work without initializing the survey (in Float mode), start a survey and select Initialization. When the Initialization screen appears, press . Set the Method field to No initialization and press .
12.8.1
On-The-Fly (OTF) Initialization If you are using a dual-frequency receiver, the initialization process begins automatically when at least five L1/L2 satellites are being tracked.
12.8.2
Known Point Initialization In a postprocessed survey you can initialize on:
33 0
• a point measured previously in the current job
• a point that you will provide coordinates for later (before the data is postprocessed)
Trimble Survey Controller Reference Manual Volume 2
Page 363
Starting the Rover Receiver
12
For instructions on how to do a Known Point initialization see page 323.
12.8.3
New Point Initialization In a postprocessed survey, you can change the initialization times if necessary. The default times are Trimble’s recommended minimum times. For instructions on how to do a New Point initialization see page 324.
12.9
Swapping Bases During a Real-Time Rover Survey If you are using multiple bases on the same frequency, you can swap bases during the rover survey. For more information, see Operating Several Base Stations on One Radio Frequency, page 290. To swap bases, do the following: 1.
From the Survey menu, select Swap base receiver. The Select base station screen appears. It shows all the base stations operating on the frequency you are using. The list shows the station index numbers of each base and the reliability . of each. Highlight the base you want to use and press
\
Note – When you change to a different base, you need to perform an initialization. If the receiver has OTF capability, the initialization starts automatically.
Trimble Survey Controller Reference Manual Volume 2
331
Page 364
12
Starting the Rover Receiver
Ending a Rover Survey
12.10
When you have measured or staked out all points required, do the following: 1.
y
From the Survey menu, choose End survey.
y to confirm the instruction. The Trimble Survey Press Controller software asks if you want to power down the receiver. Press again to power down the receiver.
33 2
2.
Turn off the TSC1 data collector before disconnecting the equipment.
3.
Return to the base station and end the base survey (see Ending a Base Survey, page 304.)
Trimble Survey Controller Reference Manual Volume 2