CHAPTER
13 13
Calibration In this chapter: ■
Introduction
■
When to calibrate
■
Notes and recommendations
■
Performing a manual site calibration
■
Using auto calibrate
Page 366
13
13.1
Calibration
Introduction This chapter shows how to perform a calibration in the field, both manually and automatically. Before reading it, you should be familiar with Chapter 5, Coordinate Systems. There is also useful information about base station coordinates on page 280.
13.2
When to Calibrate For a GPS survey or a survey that combines GPS measurements and conventional measurements with local control points, always complete a calibration before staking out any points, or computing offset or intersection points. For a survey that uses conventional measurements only, no calibration is required.
13.3
Notes and Recommendations
33 4
•
You can perform a calibration using one of the real-time GPS Survey Styles in the Trimble Survey Controller software. Do a manual calibration, or let the Trimble Survey Controller software do it automatically. If all the points have been measured, there is no need to connect the TSC1 data collector to a receiver during a manual calibration.
•
Multiple calibrations can be performed in one job. The last calibration performed and applied is used to convert the coordinates of all previously surveyed points in the database.
•
You can use up to 20 points for a calibration. Trimble strongly recommends a minimum of four three-dimensional local grid coordinates (N, E, E) and four observed WGS-84 coordinates, with the local projection and datum transformation parameters (the coordinate system). This should provide adequate redundancy.
Trimble Survey Controller Reference Manual Volume 2
Page 367
Calibration
13
Note – You can use a combination of one-dimensional, two-dimensional, and three-dimensional local grid coordinates. If no projection and no datum transformation are defined, you must have at least one 2-dimensional grid point. If the coordinate system is not specified, the Trimble Survey Controller software calculates a Transverse Mercator projection and a three-parameter datum transformation. •
Use Trimble Geomatics Office, Data Transfer, Trimble Survey Office, GPSurvey, TRIMMAP™ software, or ASCII transfer to upload control points.
•
Be careful when naming points that are to be used in a calibration. First familiarize yourself with the database search rules on page 211.
•
The set of WGS-84 coordinates must be independent of the set of grid coordinates.
•
You select the grid coordinates. Select the vertical coordinates (Elevation), the horizontal coordinates (Northing and Easting values), or all of these together.
•
Place the calibration points around the perimeter of the site. Do not survey outside of the area enclosed by the calibration points, as the calibration is not valid beyond this perimeter.
•
The origin of the horizontal adjustment in a calibration is the centroid of the measured calibration points. The origin of the vertical adjustment is the first point in the calibration that has an elevation.
•
When reviewing a calibration point in the database, notice that the WGS-84 values are the measured coordinates. The grid values are derived from these, using the current calibration. The original keyed-in coordinates remain unchanged. (They are stored elsewhere in the database as a point with the Type field showing Keyed in coordinates and the Stored as field showing Grid.) Trimble Survey Controller Reference Manual Volume 2
335
Page 368
13
Calibration
•
When you are calibrating a no projection, no datum job, (where Ground coordinates are required after calibration) you must define the reference elevation (average site elevation). When the job is calibrated, the reference elevation is used to compute the scale factor for the projection, using the inverse of the ellipsoid correction. When Grid coordinates are specified, the scale factor in the projection is set to one after a site calibration.
•
13.4
When you are calibrating a Scale-only job, the scale factor specified in the Scale-only job is used as the scale factor in the projection after calibration.
Performing a Manual Site Calibration To calibrate a survey manually the general procedure is as follows: 1.
Key in, upload, or use a conventional instrument to measure the grid coordinates of the control (calibration) points.
2.
Check or set the calibration tolerances (see Site Calibration, page 137).
3.
Measure the control points using GPS.
4.
Name or select the pairs of points to be used for the calibration. A pair of points consists of the grid coordinates and the WGS-84 coordinates for the same point.
5.
Perform the calibration.
6.
Check residuals, and recalibrate if necessary.
7.
Apply the calibration.
Note – Before starting a manual calibration, read the Notes and Recommendations at the beginning of this chapter.
33 6
Trimble Survey Controller Reference Manual Volume 2
Page 369
Calibration
13
The following steps describe how to select the points for a calibration and then perform the calibration using the Trimble Survey Controller software. Do this once you have entered grid coordinates, checked the settings in the Survey Style, and measured the points using GPS. 1.
From the main menu, choose Survey. Select a real-time Survey Style.
2.
From the Survey menu, choose Site calibration. The Site calibration screen appears.
3.
Press . The Calibration point screen appears as shown in Figure 13.1.
A
Figure 13.1
4.
l
Calibration point screen
Enter the name of the grid point. To do this, highlight the Grid point field and press . Select a point that you have keyed in, uploaded, or measured using a conventional instrument. Do the same for the GPS point field. The two point names do not have to be the same, but they should correspond to the same physical point. Set the Use field as required. Choose whether to use the vertical coordinate of the grid point, the horizontal coordinates, or both horizontal and vertical coordinates.
Trimble Survey Controller Reference Manual Volume 2
337
Page 370
13
Calibration
5.
c
Press . The Site calibration screen appears, as shown in Figure 13.2.
Figure 13.2
Site calibration screen
W
The residuals for each point are not displayed until at least three 3D points are included in the calibration to provide redundancy. 6.
to see the horizontal and vertical shifts that the Press calibration has calculated. The Calibration results screen appears, as shown in Figure 13.3.
Figure 13.3
33 8
=
Calibration results screen
7.
To add more points, press screen.
to return to the Calibration
8.
Repeat Steps 3 through 6. Continue until all the points are added.
Trimble Survey Controller Reference Manual Volume 2
Page 371
Calibration
9.
13.4.1
Do one of the following:
@
13 to store the
–
If the residuals are acceptable, press calibration.
–
If the residuals are not acceptable, recalculate the calibration.
Recalculating a Calibration Recalculate a calibration if the residuals are not acceptable, or if you want to add or delete points. Recalculate using one of the following: – some of the points
– only the horizontal component of a point
– only the vertical component of a point
To recalculate a calibration: 1.
From the main menu, select Survey. Select a real-time Survey Style.
2.
From the Survey menu, choose Site calibration.
3.
Do one of the following:
4.
d A
–
To remove (exclude) a point, highlight the point name and . press
–
To add a point, press 4 on page 337.
–
To change which components are used for a point, . Change the Use highlight the point name and press field as required. (Choose whether to use the vertical coordinate of the grid point, the horizontal coordinates, or both horizontal and vertical coordinates.)
Press
@
. For more information, see Step
\ to apply the new calibration.
Trimble Survey Controller Reference Manual Volume 2
339
Page 372
13
Calibration
Note – Each calibration calculation is independent of the previous one. When a new calibration is applied, it overwrites any previously calculated calibration.
13.5
Using Auto Calibrate A calibration calculates the parameters needed to convert the GPS-measured coordinates into local grid coordinates. During an RTK survey, the Trimble Survey Controller software can do this automatically. When you use the Auto calibrate function, it automatically computes and stores a calibration every time a calibration point is measured. In general, to calibrate a survey automatically: 1.
Key in, upload, or use a conventional instrument to measure the grid coordinates of the local control points.
2.
Set the Auto calibrate field to Yes.
3.
Use GPS to measure the calibration points.
These three steps complete the automatic calibration. The following steps are optional: 4.
Inspect the calibration results.
5.
Change the results if they are unsatisfactory.
Note – Carry out the complete calibration before staking out any points, computing offset and/or intersection points, or computing a resection from GPS points.
34 0
Trimble Survey Controller Reference Manual Volume 2
Page 373
Calibration 13.5.1
13
Keying In Grid Coordinates To key in grid coordinates: From the main menu, select Key in / Points. The Key in/Point screen appears. Move the highlight to the Point name field and press .
2.
Type the point name. Press
3. 4.
13.5.2
(
1.
\
\
.
Type details or features of the point in the Code field. Press .
o
Set the Type field to Coordinates. Check that the coordinate fields are North, East, and Elevation. If they are not, press and change the Coordinate view setting to Grid. Key in the known grid coordinates and press .
\
5.
Set the Search class field to Control. (This ensures that the point is not overwritten by a measured point.) For more information on Search class rules, see Database Search Rules, page 211.
6.
Repeat Steps 2 and 3 for all grid coordinate points. Then press or to return to the Key in screen. Press again to return to the main menu.
=O
=
Uploading Grid Coordinates Upload coordinates using Trimble Geomatics Office, Data Transfer, Trimble Survey Office, GPSurvey, or TRIMMAP software, or ASCII transfer. For more details see Data Transfer Between the TSC1 and the Office Computer, page 156. Make sure that these coordinates are: • uploaded as grid coordinates (N, E, E), not as WGS-84 coordinates (L, L, H)
•
Control class points
Trimble Survey Controller Reference Manual Volume 2
341
Page 374
13 13.5.3
Calibration
Using a Conventional Instrument to Measure Grid Points Please see Station Setup, page 468.
13.5.4
Setting Auto Calibrate to Yes To set Auto calibrate to Yes:
13.5.5
E
1.
From the main menu, choose Survey. The Select Survey Style menu appears.
2.
Highlight your RTK Survey Style and press . The menu that appears has the same name as the RTK Survey Style that you added.
3.
Select Site calibration. The Site calibration screen appears.
4.
Set the Auto calibrate field to Yes. (To change the calibration to accept tolerances see Site Calibration, page 137.) Press the screen. This takes you back to the menu for the chosen Survey Style.
5.
or to return to the Select Survey Style menu. Press Press again to return to the main menu, or to access the Survey menu.
\
O = =
\
Using GPS to Measure Calibration Points Use GPS to survey the points. The Trimble Survey Controller software automatically matches the grid points to the WGS-84 values and then calculates, stores, and applies the calibration.
f
When one point has been calibrated or a projection and datum softkey appears. You can transformation have been defined, the use this to navigate to the next point. As you measure another calibration point, the new calibration is calculated, stored, and applied to the job.
34 2
Trimble Survey Controller Reference Manual Volume 2
Page 375
Calibration
13
To measure a calibration point:
B
1.
From the main menu, choose Survey.
2.
From the Select Survey Style menu, choose your RTK Survey Style.
3.
Select Measure points. Arrow down and change the Type field to Calibration point.
4.
. A list of Access the Grid point name field and press keyed in grid coordinates appears. Highlight the point to be measured and press . The point name is inserted into the Grid point name field.
k l
\
\
Tip – If you have not yet keyed in the grid coordinates for this point, press while the cursor is in the Point name field. The Key in/Point screen appears. Enter the coordinates and then press .
The GPS point name field is filled in by the Trimble Survey Controller software depending on the settings in the Calibration point name field in the Site calibration option in the Survey Style.
\
5.
Enter values for the Code and Antenna height fields. Press to accept the screen.
6.
When the antenna is centered and vertical over the control or . The data collector starts to record point, press data.
m\ s
Keep the antenna vertical and stationary while data is recorded.
s
7.
softkey When the preset required time has elapsed, the appears. Inspect the precisions. If they are satisfactory, press to store the point.
8.
The calculations are then done automatically and the results are stored. While this is happening, the following messages appear:
Please wait. Storing point Calculating calibration Storing calibration Trimble Survey Controller Reference Manual Volume 2
343
Page 376
13
Calibration
Note – When the Trimble Survey Controller software is performing an automatic calibration, the results of the calibration are not normally displayed. However, if a calibration exceeds the tolerances that have been set, the residuals are displayed. For more information, see the next section. 9.
f
Enter the next calibration point name in the Point name field and press . The graphical display screen appears, with the azimuth and distance to the next point displayed on the right. To use the arrow display, start moving with the TSC1 data collector held in front of you as normal. The arrow points in the direction of the next calibration point. Walk towards the point. About 10 feet (or three meters) from the point, the arrow disappears and the point is displayed. For more information, see Using the Graphical Display to Navigate, page 400. When the point is located, press
=
.
10. Go back to Step 4 and measure the next calibration point. Repeat the procedure until all the calibration points are measured.
13.5.6
If Calibration Tolerances Are Exceeded The calibration residuals are only displayed if the calibration tolerances are exceeded.
34 4
Trimble Survey Controller Reference Manual Volume 2
Page 377
Calibration
13
The residuals appear in the Site calibration screen, as shown in Figure 13.4.
Figure 13.4
Site calibration screen
Should this happen, consider removing the point with the most extreme residuals: •
If at least four points are left after removing that point, recalibrate using the remaining points.
•
If not enough points are left after removing that point, measure it again and recalibrate.
It may be necessary to remove (and measure again) more than one point.
\
To remove a point from the calibration calculations: .
1.
Highlight the point name and press
2.
Change the setting in the Use field to Off and press
@
\
.
The calibration is recalculated and the new residuals are displayed. 3.
Press to accept the calibration.
Trimble Survey Controller Reference Manual Volume 2
345
Page 378
13 13.5.7
Calibration
Inspecting the Results of an Automatic Calibration To view the results of an automatic calibration:
13.5.8
W
1.
From the Survey menu, choose Site calibration. The Site calibration screen appears.
2.
Press to see the Calibration results screen. For more information, see Figure 13.3 on page 338.
Changing the Results of an Automatic Calibration To change a calibration that has been calculated using the Auto calibrate function, select Site calibration from the Survey menu. Then proceed as described in Performing a Manual Site Calibration, page 336.
34 6