The text of a manual · part 12 of 83
Trimble Survey Controller Reference Manual: GPS Survey Preparations
Pages 93 to 100 of 744, from Trimble Survey Controller Reference Manual
The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSC1
Page 93
CHAPTER
4 4
GPS Survey Preparations In this chapter: ■
Introduction
■
Coordinate systems
■
Field reconnaissance
■
Choosing a GPS survey type
■
Planning field observations
■
Satellite availability
Page 94
4
GPS Survey Preparations
4.1
Introduction Before taking the equipment into the field, there are a number of things to consider.
4.2
Coordinate Systems GPS measurements are referenced to the 1984 World Geodetic System reference ellipsoid, known as WGS-84. For most survey tasks, however, results in terms of WGS-84 have little value. It is best to display and store results in terms of a local coordinate system. Before starting a survey, choose a coordinate system. Depending on the requirements of the survey, you can choose to give the results in the national coordinate system, a local coordinate grid system, or as local geodetic coordinates. When you have chosen a coordinate system, search your survey archives for any horizontal and vertical control points in that coordinate system that are in the area to be surveyed. You can use these to calibrate a GPS survey. For more information, see Chapter 5, Coordinate Systems.
4.3
Field Reconnaissance Visit the region to be surveyed before starting the observations. Record the location (azimuth and elevation) of any objects that may obstruct the path of the GPS satellite signals to the points to be measured. Be aware of objects that may reflect or distort the GPS signals, an effect known as ‘multipath’. Identify a suitable location for the base station. This should be a position that is free of multipath and that has a clear and uninterrupted view of the sky. Accurate WGS-84 coordinates should be available for the base station mark (see Base Station Coordinates, page 280).
64
Trimble Survey Controller Reference Manual Volume 1
Page 95
GPS Survey Preparations
4
For all surveys, make sure the longest baseline does not exceed the limit defined by the survey technique you are using. For real-time surveys, make sure all marks are within range of the base radio. If they are not, decide where to place radio repeaters to gain full site coverage. Alternatively, use a sequence of multiple locations for the base station or postprocessed infill survey techniques to survey in areas where the radio does not provide coverage.
4.4
Choosing a GPS Survey Type The Trimble Survey Controller software offers you a choice of kinematic, differential, or FastStatic survey techniques (see page 7). It lets you choose any one of nine different survey types based on these three techniques. Before starting a GPS survey, decide which survey type is best suited to the project: •
What level of precision is required? For centimeter-level precision, use kinematic or FastStatic techniques. If submeter precision is sufficient, differential methods are satisfactory.
•
Do you require real-time results? For real-time results, use a radio system and select the appropriate real-time technique (kinematic or differential, depending on the precision required). Stakeout and centimeter-level navigation are two activities that require real-time solutions.
•
Do you need to log raw data? With the postprocessing techniques (FastStatic, PP kinematic, PP infill, and PP differential), raw data must be logged at the base and at the rover for the duration of the survey.
Trimble Survey Controller Reference Manual Volume 1
65
Page 96
4
GPS Survey Preparations
To continue the real-time survey by using postprocessed techniques during periods of radio failure, use the RTK & infill or RT differential & infill survey types. These survey types log data at the base for the duration of the survey. Data is only logged at the rover when infill is started. Note – If your receiver supports the use of signals from the Wide Area Augmentation System (WAAS), you can use these signals to provide differentially-corrected positions in a real-time survey when the radio link is down. For ‘pure’ real-time methods (RTK and RT differential) it is not generally necessary to store raw data. However, some contracts may include a quality control clause that stipulates that raw data be collected for the entire survey period. If this is the case, create a new Survey Style: set the survey type to RTK & data logging or to RT differential & data logging, depending on the precision required. Raw data must be collected simultaneously at both the base and rover. It is necessary to consider the memory capacity of both the base and the rover receivers:
66
•
Trimble’s 4600LS receivers, GPS Total Station 4800 receivers, and GPS Total Station 4700 receivers all have built-in memory. You only need one TSC1 data collector.
•
To collect raw data using Trimble’s Site Surveyor 4400 receivers, you need two TSC1 data collectors - one at the rover and one at the base.
•
It is possible to buy a Trimble Series 4000 receiver with or without memory. What you use determines how many TSC1s are needed.
Trimble Survey Controller Reference Manual Volume 1
Page 97
GPS Survey Preparations
4
Consider these points, then use the flow chart in Figure 4.1 to select an appropriate survey type.
Real-time solutions?
No
Yes You need a radio
No
Log raw data? Yes You need data storage capacity and processing software
Yes
All the time?
No
When radio is down
Centimeter-level? Yes
No RT differential
No
RT diff & data logging
RT kinematic
Figure 4.1
Centimeter-level?
Centimeter-level? No
Yes
Yes
RT diff & infill
RTK & data logging
RTK & infill
Centimeter-level? No
Yes
PP differential PP kinematic or FastStatic
Choosing an appropriate survey type
Trimble Survey Controller Reference Manual Volume 1
67
Page 98
4
GPS Survey Preparations
4.5
Planning Field Observations Planning is important to a successful survey. Before conducting any field work, plan a field method that lets you comfortably achieve the goals of the survey. Consider how observations should be processed, and how results will be combined. Start the base receiver before the rover receiver. If different field parties set up the base and rover receivers, the rover party must be satisfied that the base has been started before they start to measure, because: • the radio corrections needed during a real-time survey are not available until the base is started
• for postprocessed surveys, the base and rover receivers must store data simultaneously
Schedule the day’s work before leaving the office, and have the base and rover parties communicate using walkie-talkie radios or mobile phones.
4.6
Satellite Availability To survey using GPS, the base and rover receivers must track a minimum of four common satellites. For On-The-Fly (OTF) initializations, five common satellites are required. Plan the survey using a product such as Trimble’s QuickPlan™ software. Specify the approximate latitude and longitude of the project site, the proposed survey date and time, the time zone, the elevation mask, and the location of any obstructions that will reduce the view of the satellites. Obtain a recent satellite Ephemeris file and place it in the appropriate software directory. If using QuickPlan, overwrite the Current.eph file in the ...Trimble Geomatics Office\Projects folder with the more recent Ephemeris file.
68
Trimble Survey Controller Reference Manual Volume 1
Page 99
GPS Survey Preparations
C
4
Warning – If you copy raw GPS data files from a receiver to the Trimble Survey Controller software, you cannot use the Ephemeris file in QuickPlan.
You can generate a graph that indicates the number of available satellites and PDOP information. Use this information to determine the best time to perform the survey. Trimble recommends that you conduct surveys during periods when the PDOP is less than 6. Figure 4.2 shows a sample graph generated by Trimble’s QuickPlan software. It shows satellite availability and PDOP values throughout the day.
Figure 4.2
Graph showing satellite availability and PDOP values
Trimble Survey Controller Reference Manual Volume 1
69
Page 100
4
GPS Survey Preparations
70
Trimble Survey Controller Reference Manual Volume 1