Trimble Survey Controller Reference Manual: Coordinate Systems, pages 101 to 108

Pages 101 to 108 of 744, from Trimble Survey Controller Reference Manual

The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Trimble TSC1

Page 101

CHAPTER

5 5

Coordinate Systems In this chapter: ■

Introduction

■

Local coordinate systems

■

Calibration

■

Using a datum grid file

■

Using a geoid model

■

Choosing a coordinate system for a GPS survey

■

Choosing a coordinate system for a conventional survey

Page 102

5

Coordinate Systems

5.1

Introduction Before starting a GPS survey, decide which coordinate system to use. This chapter discusses some things to consider when making this decision.

B

Tip – For information about the GPS coordinate system, WGS-84, see page 64.

If you intend to combine conventional observations with GPS measurements, read the whole of this chapter. To make only conventional observations see Choosing a Coordinate System for a Conventional Survey, page 85.

5.2

Local Coordinate Systems A local coordinate system simply transforms measurements from a curved surface (the earth) onto a flat surface (a map or plan). Four important elements constitute a local coordinate system: •

Local datum

•

Datum transformation

•

Map projection

•

Calibration (Horizontal and Vertical adjustments)

When you survey using GPS, consider each of these.

5.2.1

Local Datum Because an exact model of the earth’s surface cannot be created mathematically, localized ellipsoids (mathematical surfaces) have been derived to best represent specific areas. These ellipsoids are sometimes referred to as local datums. NAD83, GRS80, and AGD66 are examples of local datums.

72

Trimble Survey Controller Reference Manual Volume 1

Page 103

Coordinate Systems 5.2.2

5

Datum Transformation GPS is based on the WGS-84 ellipsoid. The WGS-84 ellipsoid has been sized and positioned to best represent the entire earth. To survey in a local coordinate system, the WGS-84 GPS positions must first be transformed onto the local ellipsoid using a datum transformation. Four types of datum transformation are commonly used: •

No transformation

•

Three-parameter

•

Seven-parameter

•

Datum grid

A three-parameter datum transformation assumes that the rotational axis of the local datum is parallel with the rotational axis of WGS-84. The three-parameter transformation involves three simple translations in X, Y, and Z. The three-parameter transformation that the Trimble Survey Controller software uses is a Molodensky transformation, so there may also be a change in ellipsoid radius and flattening. Note – Positions on a local datum are commonly called ‘local geodetic coordinates’. The Trimble Survey Controller software abbreviates this to ‘Local’. A seven-parameter datum transformation is the most complex transformation. It applies translations and rotations in X, Y, and Z as well as a scale factor. A datum grid transformation uses a gridded data set of standard datum shifts. By interpolation, it provides an estimated value for a datum transformation at any point on that grid. The accuracy of a datum grid depends on the accuracy of the gridded data set it uses. For more information, see Using a Datum Grid File, page 79.

Trimble Survey Controller Reference Manual Volume 1

73

Page 104

5

Coordinate Systems

5.2.3

Map Projection Local geodetic coordinates are transformed into local grid coordinates using a map projection (a mathematical model). Transverse Mercator, and Lambert are examples of common map projections. Note – Positions on a map projection are commonly called ‘local grid coordinates’. The Trimble Survey Controller software abbreviates this to ‘Grid’.

5.2.4

Horizontal and Vertical Adjustments If published datum transformation parameters are used, slight discrepancies can exist between local control and GPS-derived coordinates. These discrepancies can be reduced using minor adjustments. The Trimble Survey Controller software calculates these adjustments when you use the Site calibration function. They are called horizontal and vertical adjustments.

5.3

Calibration Calibration is the process of adjusting projected (grid) coordinates to fit the local control. Key in a calibration, or let the Trimble Survey Controller software calculate it. You should calculate and apply a calibration before: • staking out points

• computing offset or intersection points

The rest of this section describes how to perform a calibration using the Trimble Survey Controller software. To key in a calibration see Creating a Job, page 88.

74

Trimble Survey Controller Reference Manual Volume 1

Page 105

Coordinate Systems 5.3.1

5

Calibration Calculations Use the Trimble Survey Controller software system to perform a calibration in one of two ways. Each method results in the computation of different components, but the overall result is the same if enough reliable control points (coordinates in your local system) are used. The two methods are: •

B

If you use published datum transformation parameters and map projection details when creating a job, and if you provide enough control points, the Trimble Survey Controller software performs a calibration that computes horizontal and vertical adjustments. Horizontal control points allow scale error anomalies in the map projection to be removed. Vertical control allows local ellipsoid heights to be transformed into useful orthometric heights.

Tip – Always use published parameters if they exist.

•

If you do not know the map projection and datum transformation parameters when creating the job and defining the local coordinate system, specify No projection/no datum. Then specify whether Grid or Ground coordinates are required after a site calibration. When ground coordinates are required, you must specify the Reference elevation. In this case, the Trimble Survey Controller software performs a calibration that calculates a Transverse Mercator projection and a Molodensky three-parameter datum transformation using the supplied control points. The reference elevation is used to compute a scale factor for the projection so that ground coordinates are computed at that elevation.

For information about the formulas used by the Trimble Survey Controller software to calculate a calibration, see Appendix C, Calculations and Search Rules.

Trimble Survey Controller Reference Manual Volume 1

75

Page 106

5

Coordinate Systems

Table 5.1 shows the output of a calibration when various data is supplied.

5.3.2

Table 5.1

Calibration output

Projection

Datum transformation

Calibration output

Yes

Yes

Horizontal and vertical adjustment

Yes

No

Datum transformation, horizontal and vertical adjustment

No

Yes

Transverse Mercator projection, horizontal and vertical adjustment

No

No

Transverse Mercator projection, zero datum transformation, horizontal and vertical adjustment

Local Control for Calibration Trimble recommends that you observe and use a minimum of four local control points for the calibration calculation. For best results, local control points should be evenly distributed over the job area as well as extending beyond the perimeter of the site (assuming that the control is free of errors).

B 5.3.3

Tip – Apply the same rule of thumb as you would when placing control for photogrammetric jobs. Make sure that the local control points are evenly distributed to the extent of the job area.

Why Calibrations Are Needed If you calibrate a project and then survey in real time, the Trimble Survey Controller software gives real-time solutions in terms of the local coordinate system and control points.

76

Trimble Survey Controller Reference Manual Volume 1

Page 107

Coordinate Systems 5.3.4

5

Operations That Require Calibration

C

Warning – Perform a calibration at any time, but always complete the calibration before staking out any points, or computing offset or intersection points.

If no datum and no projection are defined, you can only stake out lines and points that have WGS-84 coordinates. Displayed bearings and distances are in terms of WGS-84. Specify a projection before staking out curves, roads, and DTMs and when computing intersections and offsets. The Trimble Survey Controller software does not assume that WGS-84 is the local ellipsoid, so you must also define a datum. Without a datum transformation, you can only start a real-time base survey with a WGS-84 point. For information on how to perform a calibration, see Chapter 13, Calibration. Figure 5.1 shows the order of calculations performed when a calibration is calculated.

Trimble Survey Controller Reference Manual Volume 1

77

Page 108

5

Coordinate Systems

Input GPS Measurements

WGS-84 LLH User-supplied Datum transformation Local ellipsoid L' L' H' User-supplied Map projection Unadjusted grid N E H' User-supplied Control (N E)control Calculate Horizontal adjustment (N E)control and N E

Adjusted grid N' E' H' User-supplied Control (h)control YES

Geoid Model? User-supplied Geoid model NO hgeoid Calculate Vertical adjustment (h)control and H'

Output grid coordinates (N' E' E)

Figure 5.1

78

Calibration calculation process

Trimble Survey Controller Reference Manual Volume 1

Calculate Vertical adjustment (h)control and hgeoid