Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 8 of 14

Trimble Survey Controller Field Guide: RTK Field Procedures, pages 49 to 58

Pages 49 to 58 of 114, from Trimble Survey Controller Field Guide

The original document is the PDF (2.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Trimble TSC1

Page 49

RTK Field Procedures 3.4.1

3

Starting the Base Survey If you have not yet created and configured a job, do so now. See Creating a New Job, page 26. Then do the following: 1.

From the main menu, select Survey. The Select Survey Style menu appears. Note – A Survey Style is a set of configurations that apply to one particular type of survey. Each Survey Style provides a template that you can use when you perform a survey of that type. A GPS Survey Style instructs the base and rover receivers to perform compatible types of measurements. It also defines the parameters needed for measuring and storing points.

2.

Y softkey. In the Style Highlight Trimble RTK and press the name field, type a name for the new Survey Style you are about to create (for example, Test RTK). If a PC card is inserted, you can choose to store the new Survey Style on the PC card or in the main memory. Press to add the new Style to the menu of Survey Styles. Press again to return to the Select Survey Style menu.

\\

3.

Highlight the name of the new Survey Style and press Survey menu appears.

4.

Select Start base receiver. Then do the following: a.

\

. The

Because this is the first time you have used this Survey Style, the Style wizard prompts you to select the type of antenna you are using. Select one from the list - Microcentered L1/L2 w Ground (with Ground plane), for . example - and press

\

C

Warning – Select the correct antenna type. The antenna selected here determines which antenna phase center model the Trimble Survey Controller software uses to process height information.

Trimble Survey Controller Field Guide

35

Page 50

3

RTK Field Procedures b.

\

The wizard prompts you to select a radio type. Select one from the list and press .

) )

The Survey/Start base screen appears. 5.

(

\ key. Enter the Highlight the Point name field and press the point name and press the softkey to access the Key in/Point screen. The current position is displayed. Press to accept and store it. as instructed above, the base Note – When you press receiver starts using an autonomous position generated by the receiver. This is the least accurate method of establishing the base station WGS-84 coordinates, but it does let you start surveying immediately.

)

If you have a receiver that tracks WAAS satellites, press the softkey to return a WAAS position generated by the receiver. A WAAS position is better than an autonomous position. 6.

C

Highlight the Antenna height field and enter the base station antenna height. Make sure the value in the Meas. to field is correct.

Warning – Measuring the height of the antenna is an important step in any survey. There will be serious consequences if it is not measured correctly.

7.

x

Make sure the radio antenna is connected to the radio then press the softkey. A message appears: Base started. Disconnect data collector from receiver.

8.

36

Disconnect the TSC1 data collector but do not turn off the receiver.

Trimble Survey Controller Field Guide

Page 51

RTK Field Procedures

3.5

3

Setting up the Rover Using the Internal Radio To set up the rover receiver for an RTK survey: 1.

Set up the GPS antenna on a range pole. The antenna must have a clear view of the sky.

2.

Connect the receiver hardware as shown in Figure 3.4 (or Figure 3.5, depending on the receiver type).

3.

Turn on the receiver and the TSC1 data collector. From the main menu, select Files, then select Job management. A list of to open jobs appears. Highlight the required job and press it. Press to return to the main menu.

4.

=

\

To start the rover survey see Starting the Rover Survey, page 40.

Trimble Survey Controller Field Guide

37

Page 52

3

RTK Field Procedures

Figure 3.4 shows how to connect the rover receiver for an RTK survey using a GPS Total Station 4800 receiver with an internal radio.

GPS Total Station 4800 receiver

TSC1

Battery

Figure 3.4

38

Rover receiver configuration using a GPS Total Station 4800 receiver – internal radio

Trimble Survey Controller Field Guide

Page 53

RTK Field Procedures

3

Figure 3.5 shows how to connect the rover receiver for an RTK survey using a GPS Total Station 4700 receiver and an internal radio.

Antenna

GPS Total Station 4700 receiver

TSC1

2

1

3

›

1

›

2

3

2

Power supply

Figure 3.5

Rover receiver configuration using a GPS Total Station 4700 receiver – internal radio

Trimble Survey Controller Field Guide

39

Page 54

3 3.5.1

RTK Field Procedures

Starting the Rover Survey To start the survey: 1.

From the main menu, select Survey. The Select Survey Style menu appears.

2.

Select your new RTK Survey Style and press information, see Step 2 on page 35.

3.

Select Start survey.

\

.For more

If this is the first time you have used this Survey Style, the Style wizard prompts you to select the type of antenna. From the list, select the one you are using - 4800 Internal or Micro-centered . L1/L2, for example - and press

\

\

The wizard then prompts you to select the type of radio in use. From the list, select the one you are using - Trimble internal, . for example - and press 4.

3.5.2

Initialize the survey as described below.

Initializing the Survey All RTK surveys must be initialized to obtain centimeter-level positioning. Table 3.1 summarizes different ways to initialize a survey using a dual-frequency receiver. Table 3.1

Initializing an RTK survey

Initialization method

Time required for initialization

Range

Known point

~15 s (5+ SVs) ~30 s (4 SVs)

<10 km

OTF

~60 s (5+ SVs)

Note – Initialization must be maintained throughout the survey by continuously tracking a minimum of four satellites. If initialization is lost at any time, reinitialize and then continue the survey.

40

Trimble Survey Controller Field Guide

Page 55

RTK Field Procedures

3

If the system has On-The-Fly (OTF) capability, initialization is automatic. Wait for the system to initialize (this can happen faster if you move around). When the status line shows RTK=Fixed, the survey is initialized and you can start to measure points. See Measuring a Point, page 42. For information about Trimble’s recommended RTK initialization procedure and details of how to check an OTF initialization, refer to the Trimble Survey Controller Reference Manual.

B

Tip – If there is a previously-measured point nearby and it is stored in the Trimble Survey Controller software database, it is possible to do a Known Point initialization. A Known Point initialization is quicker and more reliable.

Known Point initialization (No OTF) To perform a Known Point initialization: 1.

Position the rover antenna over a known point.

2.

From the Survey menu, select Initialization.

3.

Set the Method field to Known point and press

4.

Enter a value in the Point name field. This must be the name of a known point in the Trimble Survey Controller software database. Alternatively, access the Point name field and press softkey. Select the point from the list of known the points.

5.

Enter a value in the Antenna height field.

6.

When the antenna is centered and vertical over the point, press softkey or . the l m

\

.

\

The data collector starts to record data, and the static icon ( ) appears in the status line. Keep the antenna vertical and stationary while data is recorded.

Trimble Survey Controller Field Guide

41

Page 56

3

O yn

RTK Field Procedures

7.

When the survey is initialized, the it to accept the initialization.

8.

If the initialization fails, the results are displayed and you are or . asked if you want to retry. Press y softkey appears. Press

, make sure you are on the correct point If you press before initializing again. The survey is now initialized. Measure a point as described below.

3.5.3

Measuring a Point To measure a point: 1.

Position the antenna on a range pole over the point. Remember that results will be poor if the antenna’s view of the sky is obstructed (by buildings or trees, for example).

2.

From the main menu on the TSC1 data collector, select Survey.

3.

From the Select Survey Style menu, select your new RTK . For more information, see Step 2 Survey Style and press on page 35.

\

Note – If a survey is running, the Select Survey Style menu does not appear. If the current survey is not using the new RTK Survey Style, end it (see page 54) and return to Step 1.

42

4.

From the Survey menu, select Measure points.

5.

Set the Type field to Topo point. Enter values in the Point name, Code, and Antenna height fields. When entering the antenna height, make sure the value in the Meas. to field is correct.

6.

softkey and set Auto end point to No. This lets Press the you store the point manually.

o

Trimble Survey Controller Field Guide

Page 57

RTK Field Procedures

7.

m

3

\

When the antenna is centered and vertical over the point, wait until the status line shows RTK=Fixed. This indicates that the survey is initialized. Press the softkey or . The data collector starts to record data, and the static icon ( ) appears in the status line. Keep the antenna vertical and stationary while data is recorded.

8.

The Trimble Survey Controller software has preset times for recording a certain type of point. These times are related to the number of satellites tracked, the Dilution of Precision (DOP), and the precisions required. When the preset time has elapsed, the softkey appears. Inspect the precisions: – s

–

9.

3.6

If they are satisfactory, press the point.

y

= s softkey to store the

If they are not satisfactory, wait a while for the precisions to abort the measurement. to reduce. Otherwise press Press the softkey when the Abandon point? message appears.

Move to another point. Measure it. Keep doing this until you have measured the required points. End the survey (see page 54).

Auto Calibrate A calibration calculates the parameters needed to convert the GPS measured coordinates to local grid coordinates. Trimble recommends you use a minimum of four three-dimensional local grid coordinates (N, E, E) and four observed WGS-84 coordinates, combined with the local projection and datum transformation parameters (the coordinate system). This should provide adequate redundancy. If you do not specify a coordinate system, the Trimble Survey Controller software calculates a transverse mercator projection and a three-parameter datum transformation between the WGS-84 system and the grid system.

Trimble Survey Controller Field Guide

43

Page 58

3

RTK Field Procedures

When surveying in real time, you can use the Auto calibrate function. When you do this, the Trimble Survey Controller software automatically computes and stores a calibration every time a calibration point is measured. To use automatic calibration you need to:

C 3.6.1

• key in or upload the grid coordinates of the local control points

• set the Auto calibrate field in the Site calibration option to Yes

• use GPS to measure the calibration points

Warning – Perform a calibration at any time, but always complete the calibration before staking out any points, or computing some types of offset or intersection points.

Keying In the Grid Coordinates To key in the grid coordinates: 1.

From the main menu, select Key in / Points. The Key in/Point screen appears.

2.

Move the highlight to the Point name field and press the

3.

Type the point name and enter a code if required.

4.

Set the Method field to Keyed in coordinates.

( key.

o

Make sure the coordinate fields are North, East, and Elevation. softkey and change the If they are not, press the coordinate view to Grid. Key in the known grid coordinates, then press .

44

\

5.

Set the Control point field to Yes. This ensures that the point is not overwritten by a measured point of the same name.

6.

Press

7.

Repeat Step 3 through Step 6 for each of the grid coordinate to return to the Key in screen. points, then press

\ to store the point.

Trimble Survey Controller Field Guide

=