The text of a manual · part 13 of 14
Trimble Survey Controller Field Guide: In the Office
Pages 97 to 104 of 114, from Trimble Survey Controller Field Guide
The original document is the PDF (2.7 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSC1
Page 97
CHAPTER
In the Office
In this chapter:
mg Introduction m Recharging the TSC1 battery mg Data transfer
Page 98
6
In the Office
6.1
Introduction This chapter describes operations normally performed in the office. There is a section on charging batteries and a section on transferring files to and from the office computer.
B 6.2
Tip – For more information on any topic covered in this chapter, refer to the Trimble Survey Controller Reference Manual.
Recharging the TSC1 Battery To recharge the Lithium-ion battery of the TSC1 data collector, do one of the following: •
Connect the TSC1 to the AC adaptor (the power supply for the PowerLiTE™ battery charger).
•
Connect the TSC1 to an Office Support Module II™ (OSM II) charger.
•
Remove the battery and charge it in the (optional) battery charger.
•
Connect the TSC1 to a receiver that has an external power source, or to a camcorder battery. Change the Low voltage charging enabled setting to Yes.
The battery recharges fully in approximately three hours.
6.2.1
Using the AC Adaptor To recharge the TSC1 battery using the AC adaptor:
84
1.
Connect the TSC1 data collector to the AC adaptor using the TSC1 to DB9/power supply Y-cable (part number 32345).
2.
Insert the jack plug on the AC adaptor into the socket on the Y-cable, and the Lemo connector into the TSC1 data collector.
Trimble Survey Controller Field Guide
Page 99
In the Office
3.
6
Plug the AC adaptor into the main power.
Note – The AC adaptor can power the PowerLiTE battery charger while recharging the TSC1 battery.
6.2.2
Using the Office Support Module II (OSM II) Charger To recharge the TSC1 battery using the OSM II:
6.2.3
1.
Connect the TSC1 data collector to the OSM II charger using the TSC1 to 5-pin Lemo adaptor cable (part number 32959). Connect this cable to the TSC1 and to the 5-pin Lemo cable from the OSM II.
2.
Plug the OSM II charger into the main power.
Using the Battery Charger To recharge the TSC1 battery using the optional battery charger: 1.
Remove the battery from the TSC1 data collector.
2.
Connect the battery charger to the main power using the AC adaptor (part number 30413).
3.
Insert the TSC1 battery in the battery charger. The orange (Contact) status light indicates that a battery is correctly inserted. When the green (Charge) status light is on continuously, the battery is fully charged.
Trimble Survey Controller Field Guide
85
Page 100
6
In the Office
6.2.4
Using a Low Voltage Power Supply To recharge the TSC1 battery using a power source of less than 15 V: 1.
Connect the TSC1 data collector to a receiver that has an external power source, or directly to a camcorder battery.
2.
Make sure the TSC1 cannot turn itself off while the battery is being charged. To do this:
3.
?
a.
Select Configuration / Controller / Time/date.
b.
Access the Timeout field and press the softkey.
Select Configuration / Controller / Hardware and set the Low voltage charging enabled field to Yes. This field defaults back to No when the TSC1 data collector is turned off. A Charge icon appears in the status line until the battery is fully charged.
Note – Do not start a survey while charging the TSC1 battery in this way.
6.3
Data Transfer You can transfer various types of files between the TSC1 data collector and the office computer, including .dc files, feature and attribute libraries, DTMs, and language files. The data transfer process on the TSC1 data collector is controlled by the office software when you connect the TSC1 and select the appropriate options. Use one of the following software packages to transfer data to and from the TSC1 data collector: • • • • •
Trimble Geomatics Office Data Transfer Trimble Survey Office TRIMMAP GPSurvey
For more information about the data transfer process, refer to the documentation for the software you use. 86
Trimble Survey Controller Field Guide
Page 101
In the Office 6.3.1
6
Connecting the TSC1 Data Collector To transfer data between the TSC1 data collector and the office computer, connect the equipment as shown in Figure 6.1 (or Figure 6.2, depending on the equipment). TSC1
To the office computer
To the battery charger (optional) To main power
Figure 6.1
Download connection
Connect the TSC1 data collector to the office computer, the battery charger, and the AC adaptor using the TSC1 to DB9/power supply Y-cable (part number 32345).
Trimble Survey Controller Field Guide
87
Page 102
6
In the Office
Alternative connection If using an Office Support Module (OSM, part number 20669-40), connect the TSC1 data collector to the office computer using the cable attached to the OSM II charger. With some equipment, you may need to use the adaptor cable, part number 32959, to do this: 1.
Connect the TSC1 data collector to the OSM II using the cable attached to the OSM.
2.
Connect the OSM II to the office computer using the RS232 cable. Insert one end in the OSM II DATA I/O port, the other in the office computer.
Figure 6.2 shows how to connect the equipment using this method. To the office computer
TSC1
OSM II charger
To main power
Figure 6.2
88
Alternative download connection
Trimble Survey Controller Field Guide
Page 103
In the Office 6.3.2
6
Transferring the Data You can download files from the TSC1data collector to the office computer or upload files from the office computer to the TSC1: •
On the TSC1 data collector select Files / Import/Export. Then select Trimble PC communications. The following message appears: Data transfer. Waiting for PC connection.
The rest of the procedure is controlled by the office computer. To continue, refer to the documentation for the software you use. Note – There are no communication parameters to set up, as the Trimble Survey Controller software and the office software negotiate the maximum speed at which they can work together.
= key on the To abandon the data transfer at any time, press the TSC1 data collector or the [Esc] key on the office computer. When a .dc file is transferred to Trimble Geomatics Office, Trimble Survey Office, TRIMMAP, or GPSurvey software, any GPS data files associated with that file are also transferred. You cannot transfer these GPS data files separately. Note – If you use a geoid model in a Trimble Geomatics Office or Trimble Survey Office project and you upload the job into the Trimble Survey Controller software, remember to upload the geoid file (or the relevant part of the geoid file) as well.
Trimble Survey Controller Field Guide
89
Page 104
6
In the Office
90
Trimble Survey Controller Field Guide