200pH/CR pH, ORP, Conductivity & Resistivity Instrument Instruction Manual, pages 1 to 10

Pages 1 to 10 of 64

The original document is the PDF (443 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Thornton 200pH

Page 1 read from a scan by OCR; it may hold reading errors

Part No. 84383

200pH/CR pH, ORP, Conductivity & Resistivity Instrument

Instruction Manual

@thornton

Page 2

SAFETY INFORMATION

INSTALLATION: This instrument must be installed by trained instrumentation personnel in accordance with relevant local codes and instructions in this manual. Observe all instrument specifications and ratings.

SHOCK HAZARD: Make sure power to all wires is turned off before proceeding with installation or service of this instrument. High voltage may be present on the input power and relay wiring.

RELAY CONTROL ACTION: 200pH/CR relays will always de-energize on loss of power, equivalent to normal state, regardless of relay state setting for powered operation. Configure any control system using these relays with fail-safe logic accordingly.

PROCESS UPSETS: Because process and safety conditions may depend on consistent operation of this instrument, provide appropriate means to maintain operation during sensor cleaning, replacement or sensor or instrument calibration.

This manual includes specific safety information with the following designations and formats:

WARNING: OF POTENTIAL FOR PERSONAL INJURY.

CAUTION: of possible instrument damage or malfunction.

NOTE: of important operating information.

Page 3

TABLE OF CONTENTS CHAPTER 1: GETTING STARTED .............................................................1 Introduction............................................................................................................................... 1 Features ................................................................................................................................... 1 Overview of Operation............................................................................................................ 2 Installation & Setup Procedure .............................................................................................. 2

CHAPTER 2: INSTALLING THE 200PH/CR ...............................................3 Unpacking ................................................................................................................................ 3 Installation................................................................................................................................. 3 Electrical Connections ............................................................................................................ 3

CHAPTER 3: USING THE 200PH/CR ..........................................................7 Applying Power to the 200pH/CR ......................................................................................... 7 The Display.............................................................................................................................. 7 The Keypad.............................................................................................................................. 8 Using the Menus ...................................................................................................................... 9 Installing a Sensor .................................................................................................................10 Measurement Designations .................................................................................................10 Displaying Measurements....................................................................................................10 Alarm Indications ...................................................................................................................12

CHAPTER 4: MAKING MEASUREMENTS.............................................. 13 Measurement Process .........................................................................................................13 Measurement Types .............................................................................................................13 Selecting a Measurement Type...........................................................................................15 Cell Constants .......................................................................................................................15 Conductivity Temperature Compensation..........................................................................16 pH/ORP Temperature Compensation ................................................................................17 AC Power Frequency ...........................................................................................................18

CHAPTER 5: USING SETPOINTS ............................................................ 19 Overview.................................................................................................................................19 Setpoint Signal......................................................................................................................19 Setpoint Value .......................................................................................................................19 Setpoint State ........................................................................................................................19 Assigned Relay .....................................................................................................................19 Programming a Setpoint ......................................................................................................20 USP Setpoint.........................................................................................................................21

Page 4

CHAPTER 6: USING RELAYS ................................................................... 22 Description.............................................................................................................................22 Electrical Connections ..........................................................................................................22 Delay Time.............................................................................................................................22 Hysteresis ..............................................................................................................................22 Relay State.............................................................................................................................22 Programming a Relay...........................................................................................................22

CHAPTER 7: USING ANALOG OUTPUTS............................................... 24 Description.............................................................................................................................24 Electrical Connections ..........................................................................................................24 Programming the Analog Outputs .......................................................................................24 Analog Output Calibration....................................................................................................25

CHAPTER 8: METER CALIBRATION ...................................................... 27 Overview.................................................................................................................................27 Calibration Verification.........................................................................................................27 Calibration Procedure ..........................................................................................................28

CHAPTER 9: SENSOR CALIBRATION .................................................... 31 Conductivity/Resistivity Cell Constants...............................................................................31 Conductivity/Resistivity Sensor Calibration........................................................................31 pH/ORP Sensor Calibration.................................................................................................33 pH Sensor Diagnostics ........................................................................................................35

CHAPTER 10: SECURITY/LOCKOUT ..................................................... 36 Security Features ..................................................................................................................36 Changing the Password .......................................................................................................36 Enabling the Lockout ............................................................................................................36 Accessing a Locked Menu...................................................................................................37

CHAPTER 11: OTHER FUNCTIONS ........................................................ 38 Averaging ...............................................................................................................................38 System Reset ........................................................................................................................38 Setting the Temperature Source .........................................................................................39 Sending Data to a Printer or Computer..............................................................................39

CHAPTER 12: TROUBLESHOOTING ...................................................... 41 Off-Line Self-Diagnostics .....................................................................................................41 On-Line Diagnostics ............................................................................................................41 Troubleshooting .....................................................................................................................42 Recovery Procedure .............................................................................................................42

Page 5

CHAPTER 13: SERVICE ............................................................................ 43 Fuse Replacement................................................................................................................43 Reducing 200pH/CR Patch Cord Length ...........................................................................43 Recommended Spare Parts List.........................................................................................44 Accessories...........................................................................................................................44

CHAPTER 14: TECHNICAL ILLUSTRATIONS ....................................... 45 Menu Trees ............................................................................................................................46 Overall Dimensions ...............................................................................................................49 Panel Cutout ..........................................................................................................................50 Exploded Assembly ..............................................................................................................50 Pipe Mounting........................................................................................................................51 Sealed Rear Assembly.........................................................................................................51 Printed Circuit Board Layout................................................................................................52 Rear Panel Wiring and Patch Cords...................................................................................53 Calibrators .............................................................................................................................54 Meter Calibration Connections ............................................................................................54

SPECIFICATIONS ....................................................................................... 55 WARRANTY.................................................................................................. 57

Page 6

This page is a scan with no text; see it in the PDF.

Page 7

CHAPTER 1: GETTING STARTED INTRODUCTION

Display: 1 line x 16 character backlit LCD.

The 200pH/CR is an analytical and process control instrument for measuring solution properties. It can process two signals from each of two sensors for pH, ORP, two- and four-electrode conductivity or resistivity in most combinations. A 16-character liquid crystal display conveys measuring data and setup information. The display is backlit for viewing in all lighting conditions. The menu structure allows the operator to modify all operational parameters by using keys on the front panel. A menu-lockout feature, with password protection, is available to prevent the unauthorized use of the meter. The 200pH/CR can have up to four relays for process control.

Measurements: pH, ORP, resistivity, conductivity, °C, °F, total dissolved solids, %rejection, difference, ratio, %HCl, %NaOH, %H2SO4. Measurement Channels: 2. Signal Inputs per channel: 2 (total of 4 signals for measurement). Measurement Cycle Time: 1 second measurements processed per second).

(4

Programmable: all setup information is stored in a non-volatile memory. Setpoints (alarms): 4 independent programmable as high, low or USP limits.

alarms

NOTE: The 200pH/CR design allows two channels of pH, ORP and/or conductivity measurement in most applications identified in the compatibility table below. Two incompatible sensors may be used only if plastic tanks, piping, etc. isolate them electrically from each other. Where an incompatible sensor pair is required in the same process, use two separate instruments.

Relays: up to 4 with programmable delay time and hysteresis.

For pH and ORP, large differences in potential between two sensor locations may cause interference. Factors that could increase solution potential differences are long distances between sensors in a plastic piped systems or electrical currents running through piping as in electroplating, electro-deionization, etc. Where these or similar conditions exist, test the application and use two separate 200pH/CR instruments if needed.

Security: keypad lockout with password.

The 200pH/CR instrument is equipped with a communication interface that can be configured as either an RS422 or an RS232. This interface provides real-time data output and complete instrument configuration capabilities for central monitoring via personal computer or Programmable Logic Controller (PLC). An external isolator for the digital communications signal is required if measurements other than conductivity with 0.1/cm cell constants are being made. For coverage of communications, see Manual 84364.

Sensor Compatibility:

Outputs: 2 analog outputs (0/4-20mA). Communications: RS232/RS422 interface, bidirectional; external isolator recommended with measurements other than conductivity with 0.1/cm cell constants.

Calibration: complete instrument, output, and sensor calibration. Calibration can be NIST traceable. Watchdog Timer: with a power supply monitor, to prevent unexpected instrument lockup. Built-In Diagnostics: several self tests can be initiated at any time.

Sensors pH

ORP

0.1/cm

50/cm

4-E pH

•

•

•

•

•

ORP

•

•

•

•

•

0.1/cm

•

•

•

50/cm

•

•

4-E • • = compatible

•

FEATURES Chapter 1

Getting Started

1

Page 8

OVERVIEW OF OPERATION When power is applied to the 200pH/CR, the initialization process begins. The instrument will perform a number of self tests. Any problems detected during these tests will be reported by a displayed message.

3.

Required wiring: input power and sensor cables.

4.

Optional wiring: relays, analog outputs, and serial port.

5.

Set appropriate input line frequency to reduce measurement noise. See AC POWER FREQUENCY in Chapter 4.

6.

Instrument calibration is performed at the factory to specifications. Re-calibration is not necessary. If QA/QC practice requires it, meter calibration may be verified as outlined in Chapter 8.

7.

Connect sensors to the patch cords.

Next, all setup parameters (setpoints, states, relay conditions, etc.) are restored from a non-volatile memory. The meter will then begin the measurement process. A complete measurement cycle is performed once per second and consists of the following: 1.

Measure four signals and measurements.

compute four

2.

Check setpoints against the measurements.

3.

Control the relays.

4.

Update analog output signals.

5.

Transmit measurement communication port.

6.

Display data (if not displaying a menu).

data over the

CAUTION: Be certain that patch cord is wired specifically for the type of sensor to be connected or damage could result. 8.

Select the desired measurements for each sensor as shown in SELECTING A MEASUREMENT TYPE in Chapter 4.

9.

Enter sensor constants from the label of each cell as outlined in ENTERING/EDITING CELL CONSTANTS in Chapter 9. DO NOT PERFORM A SENSOR CALIBRATION except for pH.

At any time during this process the menus can be accessed by pressing one of the menu keys. The display of a menu will not affect the measurement process.

10. Optional: program the analog outputs as shown in Chapter 7. DO NOT PERFORM AN OUTPUT CALIBRATION.

INSTALLATION & SETUP PROCEDURE

12. Optional: program the relays as shown in Chapter 6.

The following guideline shows the steps necessary to install a 200pH/CR meter and begin operation. 1.

11. Optional: program the setpoints as shown in Chapter 5.

13. Optional: program other features such as averaging method, special temperature compensation, security/password, etc, as needed.

Follow the meter installation procedure for physically mounting the meter, as outlined in Chapter 2. The meter may be mounted in a panel, on a pipe, or on a wall. Optional: the rear cover is required for wall and pipe mounting. Drill holes as needed for conduit or cable grips, install the cover and wire the meter before wall or pipe mounting.

2.

2

Make all necessary electrical connections to the meter after panel mounting. The wiring procedure is outlined in Chapter 2.

Getting Started

Chapter 1

Page 9

CHAPTER 2: INSTALLING THE 200pH/CR UNPACKING

Wall Mounting

Each 200pH/CR is packed in an individual biodegradable carton. Retain the packaging in the event that the instrument must be returned to Thornton for service or calibration.

The 200pH/CR can be easily mounted to a wall when the rear cover is installed. The flanges on the ends of the cover contain holes for screws to fasten the assembly to the wall. A layout for drilling mounting holes is included in the wall mount kit.

This carton should contain: 1 - 200pH/CR Instrument

Pipe Mounting

1 - Set of panel mounting hardware with gasket

The 200pH/CR can be mounted to a pipe with the pipe mounting accessory kit. The assembly is shown in Figure 14.5.

1 - 84383 Instruction Manual 1 - 84384 Startup Instruction Sheet 1 - Certificate of Calibration

ELECTRICAL CONNECTIONS

INSTALLATION

All electrical connections are made at pluggable terminal blocks at the rear of the 200pH/CR case.

The 200pH/CR can be mounted in a panel, on a pipe or attached to a wall.

WARNING: MAKE SURE POWER TO ALL WIRES IS TURNED OFF BEFORE PRO-CEEDING WITH THE INSTALLATION. HIGH VOLTAGE MAY BE PRESENT ON THE INPUT POWER WIRES AND RELAY WIRES.

Panel Mounting Cutout and Installation The panel cutout should measure 7.56 inches wide by 3.780 inches high (192 mm X 96 mm). Drill four holes for the #10 mounting screws. See Figure 14.3 for panel cutout size and mounting screw hole spacing. When mounting multiple instruments on the same panel, note the front flange dimensions in Figure 14.2 in order to allow enough space between instruments. Panel cutouts should be clean and free of burrs and sharp edges. The proper dimensions allow an instrument to slide freely into the cutout. Install the panel gasket (supplied with instrument) on the instrument mounting flange. Slide the instrument into the cutout and secure it with the mounting screws.

CAUTION: A good power earth ground connection is required for safety and for proper operation of the instrument. To prevent electrostatic discharge (ESD) from damaging the instrument during installation, the installer must also be electrically grounded i.e., wear a conductive wrist strap connected to earth ground. Do not run power and relay wiring in the same conduit or parallel with sensor and output signal wiring to prevent interference.

Input Power and Relay Connections

CAUTION: Do not over tighten the screws as this may crack the case.

Terminal block TB1 contains connections for the input line power and relay contacts. Depending upon the model number, the 200pH/CR will have either 2 or 4 relays. Table 2.1 shows the wiring sequence.

If the rear cover is used in a panel mounted installation, the 200pH/CR unit must be installed in the panel opening before the rear cover is installed.

All relays have “dry contacts”; they are potentialfree and require external power to be wired in series with the load and instrument terminals.

Chapter 2

Installation

3

Page 10

Relays 3 and 4, if specified, are solid state AConly relays (triacs) and require a minimum current of 10 mA to switch reliably. With very small loads such as a neon bulb, test meter or PLC, a load resistor is required in parallel with the load, e.g. a 10K ohm, 2 watt resistor, for operation with 115 VAC.

WARNING: IF THE INPUT VOLTAGE JUMPERS ARE CHANGED YOU MUST LABEL THE UNIT WITH THE NEW VOLTAGE REQUIREMENT. ALSO, THE FUSE MUST BE CHANGED TO THE PROPER RATING TO AVOID RISK OF FIRE HAZARD Fuse requirements:

TB1 Label

Input Power & Relay Function

L N

115V/230 VAC Line 115V/230 VAC Neutral Earth Ground

NC1 C1 NO1

Relay1: Normally Closed Relay1: Common Relay1: Normally Open

NC2 C2 NO2

Relay 2: Normally Closed Relay 2: Common Relay 2: Normally Open

C3 NO3

Relay 3: Common Relay 3: Normally Open

NOTE: For all measurements except those using 0.1 or 10/cm conductivity sensors, the power supply must be isolated from earth ground.

C4 NO4

Relay 4: Common Relay 4: Normally Open

Remove any AC power connections from terminal block TB1.

For 115 VAC: 1/8 Amp, SB, 250 VAC For 230 VAC: 1/16 Amp, SB, 250 VAC NOTE: If the line power frequency is changed, select the correct setting (see AC POWER FREQUENCY in Chapter 4).

Setting Input Voltage for 24 VDC The 200pH/CR can be operated from a +24 VDC power supply instead of the typical 115 VAC or 230 VAC source.

Table 2.1: Input Power & Relay Connections

1.

WARNING: MISWIRING THE AC POWER MAY DAMAGE THE INSTRUMENT AND WILL VOID ALL WARRANTIES.

Move circuit board jumper W6 to the 24V position (left two pins) as shown in Figure 14.7.

2.

Connect + 24V DC power to the connection labeled PS+ on terminal block TB3. Connect the power supply ground to the connection labeled PS- on TB3.

Setting Input Voltage for 115 VAC or 230 VAC The input voltage for a 200pH/CR can be set for either 115 VAC or 230 VAC operation. The input voltage is preset at the factory and is indicated on the serial number label on the side of the unit. Jumpers on the printed circuit board can be changed to change the input voltage. See Figure 14.7. W4 jumper pins are located between the power transformer and the fuse. For 115 VAC operation jumper pins 1-2 and 3-4 must be used. For 230 VAC operation only a jumper on pins 2-3 must be installed. The jumpers can be accessed by removing two screws from the back panel and carefully lifting the panel off.

4

WARNING: AC POWER CONNECTIONS MUST BE REMOVED WHEN USING THE +24V POWER INPUT. NOTE: The +24 VDC input is not fused within the meter.

Wire Size The pluggable terminal blocks for all connections will accept wire sizes from 26 AWG (0.126 mm2) to 14 AWG (2.08 mm2), solid or stranded and up to 12 AWG (3.31 mm2) stranded only.

Installation

Chapter 2