Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 5 of 14

PTC-960SL-III User's Guide: Getting started

Pages 21 to 24 of 78, from PTC-960SL-III User's Guide

The original document is the PDF (445 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

Filed in the catalog under the Battery for Telxon PTC-960-SL Phase 3

Page 21

Chapter

5

Getting started Unpacking the PTC-960SL-III Any additional accessories are shipped separately.

Each shipping box contains • a PTC-960SL-III,

• a 1,300 mAh lithium-ion or 500 mAh nickelcadmium battery pack,

• a 12 VDC, 200 mA power module (if ordered),

• an antenna (if your PTC was ordered with a radio),

• a wrist strap,

• a Guide to Maintaining Nickel-Cadmium and Lithium-Ion Batteries,

• a PTC-960SL-III Getting Started Guide, and

• a PTC-960SL-III User’s Guide.

To unpack the PTC-960SL-III and its accessories, follow these steps: 1. Remove the PTC from the box. 2. Remove all packing material from the PTC. Save the packaging in case the PTC is ever stored or shipped to Symbol for service. 3. Check the contents of the package to make sure that you have received everything ordered. If anything is missing or damaged, notify your Symbol sales representative.

PTC-960SL-III User’s Guide

4. Check the PTC and accessories for shipping damage. Pay particular attention to the PTC case, display screen, and scanner lens.

11

Page 22

Chapter 3 Configuring TN-3270/5250

Connecting the antenna ! Do not turn on the PTC or attempt to transmit data unless the antenna is attached; otherwise, the radio may be damaged.

If your PTC-960SL-III contains a radio, screw the supplied antenna into the antenna connector on the top of the unit.

Installing the battery pack If your PTC was not shipped with the battery pack installed, follow the instructions in Chapter 10 to insert the battery pack.

Charging the battery pack Refer to Appendix C for information on ordering a charging accessory.

The PTC-960SL-III’s lithium-ion or nickel-cadmium battery pack may be recharged via a power module, a communication cradle, or a universal four-bay battery charger. Charge the PTC’s battery pack when the unit is first received and whenever the pack becomes low. The Batt LED glows and a low-battery message may display when the battery pack is running out of power.

Charging via the power module The following items are required to charge the battery pack:

To charge the battery pack outside of the U.S. or Canada, you need a power module designed for the country’s AC voltage supply (e.g., 220 volts).

•

A 12 VDC, 200 mA power module,

•

An electrical outlet within 6 ft (1.8 m) providing 110 volts AC in the U.S. or Canada.

Follow these steps to charge the battery pack. 1. Turn off the PTC and disconnect any attached accessories. 2. Connect the power module’s cable to the PTC’s micro DB-15 connector. 3. Plug the power module into the electrical outlet. The Chg LED glows.

12

PTC-960SL-III User’s Guide

Page 23

Turning on the PTC

A lithium-ion battery pack will take longer to charge if recharging is not performed at room temperature.

4. Charge the PTC’s battery pack for 8 hours (lithium-ion) or 5 to 6 hours (nickel-cadmium). 5. When charging is finished, first unplug the power module from the electrical outlet; then, disconnect it from the PTC.

Charging via the communication cradle To charge the PTC’s battery pack via the SC-960SL-III Single-Bay Communication Cradle, simply insert the PTC into the cradle, following the instructions shipped with the cradle. The PTC’s battery pack will be recharged automatically.

Charging via the universal battery charger The Universal Battery Charger can recharge up to four PTC-960SL-III lithium-ion or nickel-cadmium battery packs in 3 hours or less. Refer to the documentation shipped with the charger for specific instructions.

Turning on the PTC Press the ON/OFF key to turn on the PTC-960SL-III.

Checking the PTC Perform the following steps to check the operation of the PTC. 1. Make sure the PTC is turned on. 2. Look at the PTC’s display screen. What appears on the screen depends on the program that your organization uses. Repeat the steps in this section if your PTC is not operating properly. If the problem persists, refer to the section titled "Troubleshooting" starting on page 37 .

PTC-960SL-III User’s Guide

If the PTC is operating correctly, the user should not observe or hear any of the following: •

A low-battery warning,

•

A blank display screen, or

•

Any warning beeps. 13

Page 24

Chapter 3 Configuring TN-3270/5250

14

PTC-960SL-III User’s Guide