The text of a manual · part 3 of 4
Spectrum One Serial Access Bridge (SAB) II User's Guide: Chapter 2 Installation and Configuration
Pages 14 to 25 of 31, from Spectrum One Serial Access Bridge (SAB) II User's Guide
The original document is the PDF (634 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Symbol SAB-2070 Access Bridge II
Page 14
Chapter 2
Installation and Configuration Before installation take certain safety precautions: • Keep SAB and the SAB diskette away from strong magnetic fields and liquids. • Ground yourself before handling SAB or Spectrum One components. • Check cables for cracks or loose connectors. Replace them as necessary. • Designate a separate system to edit SSP.INI. You can use the host if the host is a DOSbased system.
Host Connectivity Requirements The serial link between the SAB and the host has the following characteristics: • Serial cable RS-232-C length is less than 50 feet. • Cable runs are routed away from electrical noise sources, such as electric motors and high current AC power cables. • To guarantee error-free data if using a short distance modem: • use a modem protocol • use a full-duplex connection • verify communication delays are virtually nonexistent. • Serial host connection has hardware buffering capability (16550 UART or better). • Serial line driver software can efficiently receive and transmit data without losing any characters.
2-1
Page 15
SAB II - User’s Guide
Installation Outline Follow the order of the procedures closely: 1. Conduct a site survey. 2. Edit SSP.INI to configure SAB and components. 3. Connect cradle, host, and primary transceiver. 4. Power up Spectrum One network and boot SAB with SAB software. 5. Connect additional transceivers to network. Refer to 3850 Transceiver Quick Reference Guide.
Site Survey Prior to hardware installation conduct a site survey to test radio reception, field intensity, and measure interference. Information gathered determines the optimum hardware placement and calculates the proper type, quantity and lengths of cables. The site survey determines the quietest radio channels within the spectrum allowed by the FCC. Channel numbers, frequencies, and the chipping seed are stored in the host SPEC1.CFG or SAB SSP.INI. Contact a Symbol service representative for details.
SAB Configuration To configure the host serial port to match various standard serial formats: • use an ASCII text editor on a separate system to edit SSP.INI • make configurations on the copy of the original SAB software diskette • capitalizing options is not required • spaces before and after the equal sign are optional • a carriage return (\013) and line feed (\010) character follows each entry. The default SSP.INI does not include viable entries for the ChipSeed, Channels, or NetBIOS application and host specifications. Edit these according to your network environment.
2-2
Page 16
Installation and Configuration
The default SSP.INI contains: [HostComm] ; Host-SAB serial connection communications parameters BaudRate = 9600; Baudrate in bits/second DataBits = 8 ; Number of data bits/character Parity = none; Type of parity detection StopBits = 1 ; Number of stop bits/character FlowCtrl = none; Type of flow control protocol SysDelay = 0 ; Send delay in seconds (ignored if FlowCtrl != rts) SysTimeout = 2 ; System timeout in seconds DSRWait = yes ; Wait for DSR if 'yes' [BARs] ; Bridge Access Routines to be used Admin = no FileServer = no [Spec1] ChipSeed Channels BaseLoad NCBBuf MaxTerms
; Spectrum One NCU parameters = 623401310 = 2,10,18,26,34,42 = no = 1024 = 40
[NetBIOS] ; NetBIOS host connection parameters Entry = TESTS,HOSTS,S,20 Entry = TESTD,HOSTD,D,20 [Log] Spectrum1 Host LogSize Logging
; Logging Control = yes = yes = 64 = no
Modify SSP.INI according to the following tables. Asterisks (*) indicate default settings.
2-3
Page 17
SAB II - User’s Guide Table 2-1. SAB-to-Host Data Link Configuration Directives Under [HostComm]
SysDelay
300, 600, 1200, 2400, 4800, *9600, 19200, or 38400 7 or *8 even, odd or *none *1 or 2 *none xon rts hp *0 to 10000
SysTimeout
0 to 99, *2
DSRWait
*yes or no
BaudRate
DataBits Parity StopBits FlowCtrl communication baud rate for link to host number of data bits data parity number of stop bits no flow control available XOn/XOff RTS/CTS HP-3000 (send packet on receipt of linefeed only) integer delay value in milliseconds from when a CTS is detected to when the SAB sends data. Applicable only if FlowCtrl = rts. integer time out value in seconds of the gap between two consecutive incoming characters. A packet with a gap larger than SysTimeout value is disregarded. allow SAB to wait for Data Set Ready (DSR) from the host during startup before becoming active. If the host drops its Data Terminal Ready (DTR) after establishing communication, the SAB reboots. The SAB reloads, raises its DSR, and waits for DTR from the host. The host can reset the SAB by dropping and raising its DSR.
Table 2-2. BAR Configuration Directives Under [BARs]
Admin FileServer
2-4 yes or *no yes or *no make administrative BARs available make file service BARs available
Page 18
Installation and Configuration Table 2-3. Spectrum One Network Directives Under [Spec1]
ChipSeed Channels
BaseLoad NCBBuf MaxTerms
10000 to inclusive decimal integer chipping seed. Randomly 999999999 generated. from 02 to 50 radio channel numbers, 2-digit values separated by commas. The first channel is the primary channel. Defaults from site survey. SSP.INI specifies up to six channels for transceiver-to-terminal communication. The first channel on the list is the primary channel. yes or *no distribute remote terminal assignments evenly among all transceivers in the network to improve performance 256, 512,or maximum size in bytes needed for NetBIOS NCB buffers *1024 1 to *40 maximum number of terminals to support Table 2-4. NetBIOS Configuration Directives Under [NetBIOS]
Entry specifies a NetBIOS entry. Multiple entries are specified by adding Entry lines. Each entry has four parameters separated by commas and with no spaces as follows: app,host,m,n where: app 16-character user-assigned host application identifier not used by the SAB. host 16-character name of host to which the SAB is connected. m S for session mode, D for datagram mode. n number of terminals. Range is from 1 to 40. Configuration directives listed under [Log] are for diagnostic or Spectrum One network maintenance. Do not modify the values. Contact a Symbol service representative for more information.
2-5
Page 19
SAB II - User’s Guide
Component Configuration The SAB software performs component configuration automatically. The SAB software allocates unique unit numbers for transceivers and terminals to communicate with the host. SSP sends unit numbers, the chipping sequence and frequencies to these devices. If an uninitialized terminal generates an error when activated, place the terminal in the cradle for unit number assignment. The terminal receives the chipping sequence and assigned frequencies.
CAUTION Before installing hardware components, verify SAB power switch is off.
2-6
Page 20
Installation and Configuration
Hardware Installation Refer to the label on the back of the front bezel to connect components. To remove front bezel: 1. Firmly pull bottom of front bezel to unsnap connecting joint from chassis. 2. Gently pull top of front bezel to unsnap connecting joint.
3. Continue connecting the cradle, host, and primary transceiver.
2-7
Page 21
SAB II - User’s Guide
Cradle Connection Install the cradle for program downloading capabilities from the SAB. 1. Attach DB-25 connector at one end of cradle null modem cable to CRADLE at rear of SAB.
Figure 2 - 1. Cradle Cable Wiring
2. Attach DB-25 connector at other end of cable to serial port on left side of cradle. The cable part numbers are: for Model 3860 (59846-00) and for Model 3866 (58946-01). Note: Different cradle models have varied connection schemes. To connect additional cradles, refer to the quick reference guide for the specific cradle model.
2-8
Page 22
Installation and Configuration
Host Connection 3. Attach the DB-9 connector on a Symbol null modem cable (59846-02) to HOST at the rear of the SAB.
Figure 2 - 2. SAB-to-Host Cable Wiring
4. Attach the DB-25 connector at the other end of the cable to the host serial port. If the host-to-SAB interface uses Request To Send (RTS) and Clear To Send (CTS) signals to control flow control, use a Symbol null-modem cable (61383-01) rather than the cable listed above. Set the FlowCtl parameter in SSP.INI to rts and the SysDelay parameter to at least 100.
Figure 2 - 3. SAB-to-Host Cable Wiring with RTS/CTS
When using RTS and CTS signals, modify the FlowCtrl in SSP.INI as follows: [HostComm] . . . FlowCtrl=rts
2-9
Page 23
SAB II - User’s Guide
Primary Transceiver Connection Transceivers NVM must be clear before installing them into the Spectrum One network. Refer to the 3850 Transceiver Quick Reference Guide. When the SAB initializes, it resets the topology and automatically configures transceivers with the proper frequency and chipping sequence. If the File Access BARs option is enabled in SSP.INI and SPEC1.CFG exists on the host, the network uses the host SPEC1.CFG frequency and chipping sequence information. Otherwise, the network uses the SSP.INI configuration information. A 50-foot cable (61047-00) can be ordered for demonstration and generic installation. The RS-422 cable has a female DB-25 connector for SAB connection and a male DB-25 connector for transceiver connection.
Figure 2 - 4. Transceiver Cable Wiring
1. Attach DB-25 connector at one end of RS-422 cable to TRANSCEIVER at rear of SAB. Attach DB-25 at other end of cable to primary transceiver serial port. 2. Connect power cord to transceiver external power supply and plug power cord into AC outlet. 3. Terminate COAX with 50-ohm terminator. 4. Attach antenna to ANTENNA connection.
2-10
Page 24
Installation and Configuration
Power Up Before powering up, replace the front bezel. 1. Plug power cable into power connector at rear of the SAB. Plug other end of to the wall receptacle. Verify all power and serial connections. 2. If using remote administration functions, connect the modem to the dedicated telephone outlet with a phone line. 3. Insert the modified SAB diskette into the floppy drive. 4. Power on system to load and activate SAB. Primary transceiver configures automatically. SAB initialization provides unattended configuration and acquires configuration data. SSP.INI on the SAB diskette and SPEC1.CFG on the host are DOS files. 5. Power on cradle. Note: The powered up SAB will not initialize unless the host application is running if DSRWait is enabled.
Audible Status Indicators System beeps from the SAB internal speaker indicate system status. Single beep cradle is ready
Repeating beep every 3 seconds
SAB is waiting for DSR
2-11
Page 25
SAB II - User’s Guide
PAGE INTENTIONALLY BLANK
2-12