Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact
Page 1 of PDT 7200 Series Product Reference Guide for Windows CE

Manual · Symbol

PDT 7200 Series Product Reference Guide for Windows CE

Manual139 pagesPDF 1.4 MB

Product reference guide for the Symbol PDT 7200 Series Windows CE terminals: setup, cradle, scanning, configuration and Spectrum24.

Download the PDF1.4 MB

Names · 1 model

The models it names

Filed with · 3 models

Also filed with these models on the old site

Summary

What is in it

The system administrator's reference for the Symbol PDT 7200 Series, a Windows CE portable terminal with a touch screen and built-in bar code scanner, also sold with Spectrum24 wireless LAN. It covers setting up the terminal, installing the SDK on a development PC, Spectrum24 network configuration, the cradle and batteries, operating and scanning, building and sending hex images with TCM and IPL, ActiveSync communications, maintenance and troubleshooting, specifications and the demo program.

Its parts

  1. About This Guide
  2. Getting Started
  3. Software Installation on the Development PC
  4. Spectrum24 Network Configuration
  5. Cradle Setup and Operation
  6. Operating the Terminal
  7. Configuring the Terminal
  8. Communications
  9. Maintenance and Troubleshooting

From the manual

Key facts from this manual

Some pages are scans or cannot be read; this says only what the readable text supports. Each line names its page in the PDF.

Symbol's Product Reference Guide (72-42246-01, Revision A, August 2000) for the PDT 7200 Series handheld terminals running Windows CE. It names no individual models within the series. It walks through first setup, the CRD 7200 cradle and Li-Ion battery, scanning, ActiveSync, troubleshooting and the environmental specifications.

Read for this summary: pages 1 to 3, 12, 18 to 24, 48 to 56, 60 to 64, 96 to 97 and 102 to 109 of 139.

What it is
Windows CE portable terminal with touch screen and bar code scanner, processing power of a 486 PC p. 20
Display
1/4 VGA, 240 x 320 pixels, touch screen with virtual keypad p. 21
Scan modules
1D standard range, 1D long range, or PDF417 2D (with 2D scan engine) p. 62
Scan distance
Most combinations work within 4 to 10 inches p. 63
Radio
Spectrum24 RF wireless LAN on some models: a Type II PC card with an internal antenna p. 20, 23
Ports
IrDA port; COM1 port (if installed); speaker and microphone p. 21
Battery
Rechargeable Lithium-Ion (Li-Ion) battery pack p. 22
Battery life
8 hours in typical use; varies with conditions and options p. 53
Charge time
2 hours in the terminal in the cradle; about 4 hours in the spare battery slot p. 50, 52
Cradle
CRD 7200 single-slot cradle: charges the terminal and a spare battery, RS-232 port to a host via IrDA p. 48, 52
Cables
RS-232 printer/host cable p/n 25-37380-01 (3 ft, null modem); 9-pin/9-pin null modem cable p/n 61383-00-00; 25-pin to 9-pin adapter p/n 50-12100-620 p. 22
Operating temperature
-20° C to 50° C (-4° F to 122° F) p. 106
Charging temperature
5°C to 45°C p. 51
Software
Windows CE; Visual C++ with CE Toolkit; Symbol Terminal Configuration Manager (TCM) loads hex images p. 20

What this manual walks you through

  • Unpacking the terminal and identifying its parts p. 20, 21
  • Calibrating the touch screen p. 24
  • Connecting cradle power and the RS-232 cable to a host p. 48, 49
  • Charging the terminal battery and a spare battery p. 50, 51, 52
  • Reading the cradle LEDs and self-test results p. 52, 53
  • Installing, removing and re-initializing the battery p. 54, 55, 56
  • Warm and cold booting, suspending and resuming p. 60, 61
  • Scanning with the dual-position trigger p. 63, 64
  • Running ActiveSync through the cradle or a serial cable p. 96, 97
  • Troubleshooting terminal and cradle problems p. 103, 104, 105

Good to know

  • Use only the Symbol Li-Ion battery in the PDT 7200. p. 54
  • Supercaps keep RAM contents for at most 5 minutes while the main battery is changed. p. 54
  • A battery pack left fully discharged for about a week must be re-initialized in the terminal in the cradle. p. 56
  • Do not expose the battery to more than 140°F (60°C), or take it apart, burn it or short it. p. 55
  • The CRD 7200 cradle needs its own serial port on the computer; it cannot share one with a modem. p. 96

Questions this manual answers

What battery does the PDT 7200 use?

A Lithium-Ion battery pack, which runs about 8 hours in typical use. p. 53

How long does a PDT 7200 battery take to charge?

2 hours in the terminal in the cradle for a fully discharged pack, or about 4 hours in the cradle's spare battery slot. p. 50, 52

How do I cold boot the PDT 7200?

Press and hold the on-screen icon shown in the manual for 16 seconds; holding it 6 to under 16 seconds gives a warm boot. p. 60

Which cable connects the PDT 7200 cradle to a PC?

The RS-232 9-pin/9-pin null modem cable p/n 61383-00-00, with a 25-pin to 9-pin adapter p/n 50-12100-620. p. 22

What is the PDT 7200 operating temperature range?

-20° C to 50° C (-4° F to 122° F). p. 106

Contents

Chapters and sections

Each line opens the PDF at its page.

  1. About This Guide10
    1. Introduction10
    2. Chapter Descriptions10
    3. Notational Conventions11
    4. Related Publications12
    5. Service Information12
    6. Warranty15
  2. Chapter 1 Getting Started18
    1. Introduction20
    2. Unpacking the Terminal20
    3. Parts of the Terminal21
    4. Accessories/Peripherals22
    5. Before You Use the Terminal23
    6. Starting the PDT 720023
  3. Chapter 2 Software Installation on the Development PC26
    1. Introduction28
    2. Symbol Windows® CE SDK29
    3. Installing the SDK on the Development PC29
  4. Chapter 3 Spectrum24 Network Configuration32
    1. Introduction34
    2. View Configuration35
    3. Spectrum24 System Configuration37
    4. Signal Strength39
    5. Ping Test40
    6. S24 Network Settings44
  5. Chapter 4 Cradle Setup and Operation46
    1. Introduction48
    2. Setting Up the Cradle48
    3. Using the Cradle50
    4. Cradle LED Indications52
    5. Cradle Self Test53
    6. Batteries53
  6. Chapter 5 Operating the Terminal58
    1. Introduction60
    2. Powering the PDT 720060
39 more lines, from page 60 on
  1. Booting the Terminal60
    1. Suspending and Resuming Operation60
    2. Using the Touchscreen62
    3. Adjusting the Display and Backlight62
    4. Scanning62
  2. Chapter 6 Configuring the Terminal70
    1. Introduction72
    2. Flash Partitions72
    3. Starting Terminal Configuration Manager74
    4. Defining Script Properties76
    5. Creating the Script for the Hex Image78
    6. Building the Image80
    7. Creating a Splash Screen82
    8. Sending the Hex Image82
    9. Initial Program Loader (IPL)84
  3. Chapter 7 Communications94
    1. Introduction96
    2. Performing ActiveSync using the Cradle96
    3. Performing ActiveSync using the Optional Serial Cable97
  4. Chapter 8 Maintenance and Troubleshooting100
    1. Cleaning the Terminal102
    2. Storage102
    3. Troubleshooting103
  5. Appendix A Specifications106
    1. Environment106
    2. Decode Zones107
    3. Pin-Outs109
  6. Appendix B Demo Program110
    1. Introduction110
    2. File Browser111
    3. Control Panel113
    4. Scan Sample125
    5. PC Link128
    6. Symbol Applications Menu128
    7. About BLT132
    8. Virtual Keyboard132

From the PDF’s own bookmarks.

The whole text · 16 parts

Read the manual here as text

Its text as extracted from the PDF, unedited, in parts; each page opens the PDF at that page.

  1. Pages 1 to 91-9
  2. About This Guide10-17
  3. Chapter 1 Getting Started18-25
  4. Chapter 2 Software Installation on the Development PC26-31
  5. Chapter 3 Spectrum24 Network Configuration32-45
  6. Chapter 4 Cradle Setup and Operation46-57
  7. Chapter 5 Operating the Terminal58-69
  8. Chapter 6 Configuring the Terminal, pages 70 to 7770-77
  9. Chapter 6 Configuring the Terminal, pages 78 to 8578-85
  10. Chapter 6 Configuring the Terminal, pages 86 to 9386-93
  11. Chapter 7 Communications94-99
  12. Chapter 8 Maintenance and Troubleshooting100-105
  13. Appendix A Specifications106-109
  14. Appendix B Demo Program, pages 110 to 119110-119
  15. Appendix B Demo Program, pages 120 to 129120-129
  16. Appendix B Demo Program, pages 130 to 139130-139

The file

Revision and size

Revision72-42246-01 Revision A, August 2000
PublisherSymbol Technologies, Inc.
Pages139
PDF1.4 MB
TextText from the PDF itself; page 8 is a scan, read by OCR, which may hold reading errors.

The first pages · 3 of 139

Look before you download

Each page opens the PDF at that page.

Page 1
Page 1of 139
Page 2
Page 2of 139
Page 3
Page 3of 139