Browse
(440) 299-7778
Menu
(440) 299-7778
One-year parts and labor warranty30-day money-back guaranteeEnglishEspañolContact

The text of a manual · part 5 of 23

MiniScan MS-804FZY and MS-904HS Integration Guide: Chapter 2 Installation, pages 23 to 30

Pages 23 to 30 of 184, from MiniScan MS-804FZY and MS-904HS Integration Guide

The original document is the PDF (2.6 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.

For the Symbol MS-804FZY and Symbol MS-904HS

Page 23

Chapter 2 Installation Overview This chapter provides information on unpacking, mounting, and installing the MiniScan, and includes physical and electrical considerations.

Unpacking Remove the MiniScan from its packing and inspect for damage. If the scanner is damaged, call the Symbol Support Center at the telephone number listed on page xi. KEEP THE PACKING. It is the approved shipping container and should be used if the equipment needs to be returned for servicing.

2-1

Page 24

MS-804FZY and MS-904HS Integration Guide

Mounting There are two mounting holes on the bottom of the chassis. Figure 2-1 provides mounting dimensions for the MiniScan scanner housing. For a mounting template, see Mounting Template on page 9-1. Note: Use only non-magnetic M3x.5 screws with a maximum length of 3.6M for mounting the MiniScan scanner chassis.

2x M3 - 3.6 mm lg. max. Mounting Screw Holes

2x - 0.080 [2.0] Alignment Holes

Note: Dimensions are in inches [mm]. Figure 2-1. MS-804FZY/MS-904HS

2-2

Page 25

Installation

Connecting MiniScan To connect the MiniScan to the host, connect the scanner cables in the order shown in Figure 2-2. To Host 3

5

4

Beeper (Optional)

1

Trigger or Photo Sensor (Optional)

Trigger Jack (Optional) See Figure 2-3 2

Figure 2-2. Typical Connection Diagram

2-3

Page 26

MS-804FZY and MS-904HS Integration Guide

Male jack shown for reference

Insertion Direction

1

1 2 3

2 3 Note: Due to many variations of jack and socket styles, identify terminals as shown before soldering leads.

11 -- Ground Ground(Sleeve) (Sleeve) 22 -- Battery Vcc (Middle Contact) (Middle Contact) 33 -- Trigger Trigger(Tip) (Tip)

Figure 2-3. Trigger Jack Connector Pins

2-4

Page 27

Installation

Mechanical Drawing MS-804FZY

Notes: Unless otherwise specified: • •

Dimensions are in inches, dimensions in [ ] are mm. User mounting tolerances are not included.

Figure 2-4. MS-804FZY Mechanical Drawing

2-5

Page 28

MS-804FZY and MS-904HS Integration Guide

Notes: Unless otherwise specified: • •

Dimensions are in inches, dimensions in [ ] are mm. User mounting tolerances are not included.

Figure 2-5. MS-804FZY Mechanical Drawing

2-6

Page 29

Installation

MS-904HS

Notes: Unless otherwise specified: • •

Dimensions are in inches, dimensions in [ ] are mm. User mounting tolerances are not included.

Figure 2-6. MS-904HS Mechanical Drawing

2-7

Page 30

MS-804FZY and MS-904HS Integration Guide

Notes: Unless otherwise specified: • •

Dimensions are in inches, dimensions in [ ] are mm. User mounting tolerances are not included.

Figure 2-7. MS-904HS Mechanical Drawing

2-8