The text of a manual · part 6 of 8
Technical Description: Proximity Laser Scanner PLS, pages 51 to 60
Pages 51 to 60 of 78
The original document is the PDF (2.3 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Sick PLS101
Page 51
9.6 Monitor protective field You have the option of monitoring the contour lines and the defined protective field in operation by means of a connected PC.
• •
From the menu select Monitoring Range – Monitor. Or click on the “Monitor Monitoring Range” button on the toolbar.
You see the protective field and the space contour on-screen. A colour code for displaying the protective and warning fields is shown in the status bar at the bottom of the screen.
Save space contour You can receive and save the defined space contour of a sensor. In this way, when error shutdowns occur, you can check at which point the protective field was infringed.
•
From the menu select PLS – Extras – Readings – Save Readings.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
51
08.07.2004, 15:55
51
Page 52
9.7 Check settings You can call up an overview at any time showing all the configuration and monitoring range settings. You can also print out the overview. Note: This preview does not show you the actual configu-ration active in the PLS, but only the settings you are currently editing on the PC. How to receive the active configuration from the PLS and print it is described in the next section.
•
From the menu select File – Preview.
Several pages now appear listing all the configuration settings in texts and diagrams. You can check over your settings any time here.
Change size of screen view: You can zoom the screen view in or out in two stages.
• •
Click on the “Zoom In” or “Zoom Out” button. The view is zoomed in or out by one stage a at time. Or click on the place you want to zoom into. The view is zoomed in or out one stage at a time at the selected point.
Print preview:
•
52
Click on the “Print” button.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
52
08.07.2004, 15:55
Page 53
9.8 Receive and store configuration Receive configuration from PLS You can receive and print the configuration data stored in the PLS.
•
From the menu select PLS – Configuration – Configuration Log.
The PC receives the current configuration from the PLS. The screen displays an overview of all the configuration settings stored in the PLS.
Change size of screen view: You can zoom the screen view in or out in two stages.
• •
Click on the “Zoom In” or “Zoom Out” button. The view is zoomed in or out at one stage at a time. Or click on the place you want to zoom into. The view is zoomed in or out one stage at a time at the selected point.
Print log:
•
Click on the “Print” button.
Store configuration You can save all configuration and monitoring range settings to the hard disk or to a floppy disk.
•
From the menu select File – Save As to save the settings.
You can call up the stored file again later to change the settings or transmit them to the PLS.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
53
08.07.2004, 15:55
53
Page 54
9.9 Change password To be able to send configuration and monitoring areas to the PLS, you must log on as an “Authorised Client”. This requires a password (default: “SICK_PLS”). To protect your PLS system against manipulation, you should change the default password and keep it in a safe location accessible only to authorised persons. To change the password, proceed as follows:
• • •
From the menu select PLS – User Category, or click an the “Logon/Logoff User Category” button on the toolbar. Log on as an “Authorised Client”, using the old password (e.g. “SICK_PLS”). Select PLS – Password – Change for Authorised Client.
This dialog window appears.
• •
Type in the new password twice - once in each box. Onscreen it is shown only as a series of asterisks. Confirm with “OK”.
The new password is stored in the PLS.
• •
Logoff. Make a note of the new password and keep it in a safe location accessible only to authorised persons.
Note: The new password takes immediate effect. But please be sure to always log off before leaving your workstation! Only if you do so can the password protect your PLS system against manipulation.
54
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
54
08.07.2004, 15:55
Page 55
9.10 Change screen view You can enlarge, reduce or move the fields on-screen to make them look as you want. You can also choose between a circular and a rectangular background. Enlarge or reduce view
•
Click on the “Zoom In” button on the toolbar.
The zoomed segment is zoomed one stage further with every click of the mouse.
•
Or click on the “Zoom Out” button on the toolbar.
The zoomed segment is zoomed out one stage further with every click of the mouse.
Move view
• •
Click on the “Move” button on the toolbar. The cursor changes shape into a four-pointed arrow. Hold the mouse button pressed down and move the screen segment to where you want it.
… or:
•
Move the view using the scroll bars at the right and bottom of the screen.
Centre view
•
Click on the “Centre” button on the toolbar. The zero point is now back in the centre of the screen.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
55
08.07.2004, 15:55
55
Page 56
Change grid pattern You can switch between rectangular and circular grid patterns.
• • • • • • •
From the menu select View – Options. In the dialog window select the “View” tab. Check the checkbox for a rectangular or circular grid pattern. Set the desired grid width. Set your desired maximum visible area. Check the checkbox for metric or imperial units. Check the checkboxes to display the grid pattern, labels and visible area on-screen.
Restore defaults: Click on the “Default” button. All values are reset to their default settings.
•
Confirm setting: Click on “OK”.
•
Set displayed readings You can set how many space contour readings are to be displayed when monitoring and editing the fields. Note: The more readings you display, the more accurate the display will be, but it will also be slower.
• • • •
56
From the menu select View – Options. Select the “Readings” tab. Select how many space contour readings you want to evaluate. Enter the time intervals at which new readings are to be requested during editing.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
56
08.07.2004, 15:55
Page 57
9.11 Interrogate fault memory (system diagnosis) If your PLS is not functioning as you would like it, you can interrogate the fault memory of the PLS in a number of different steps to localise possible faults. The fault table in Chapter 11.3 will tell you what to do then to rectify the fault. General note: The PLS fault memory is only temporary. This means that it is erased when the power is disconnected. If the fault has been rectified before restarting the PLS, the fault memory no longer contains the corresponding entry. Such a fault entry is only made if the self-start fails again after the restart. In order to ensure that faults which have just occurred are identified correctly, the fault memory must be interrogated before the power supply is disconnected.
Initial fault diagnosis As the first step you can carry out a simple diagnosis to localise faults.
•
From the menu select PLS – Diagnosis.
This dialog window appears.
•
Click on “Run”.
The diagnosis is carried out and the window displays information on the current status of your PLS system. The fault codes are given in the bottom section of the list display. To find out what the fault codes mean, and whether you can rectify the fault yourself, refer to the fault table in Section 11.3. If necessary, you can also carry out a second diagnosis to get more detailed information. This is described below.
Interrogate PLS fault memory
•
From the menu select PLS – SICK-Diagnosis.
This dialog window appears.
•
Make sure zero is entered as the device address and “PLS” as the device type, and confirm with “OK”.
The “Run Diagnosis” dialog window appears. In it you will find various telegrams with which you can execute additional commands and functions.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
57
08.07.2004, 15:55
57
Page 58
• •
In the list of available telegrams select the “Read fault memory” telegram and click on “Add”. Select the “Read sensor status” telegram and click on “Add”.
The two telegrams are now entered one under the other in the list of telegrams for diagnosis.
•
Click on “Run”.
The fault memory of the PLS and the sensor status are read, and the result log is displayed in the box at the bottom of the screen. You can find out what the listed fault code means from the fault table in Section 11.3.
You can add supplementary information to the result log, print it, or save it as a file. Enter supplementary information: Click on “Input” and enter the text you want. Your text is then appended to the result log.
•
Print result log: Click on “Print”.
•
Save result log as file: Click on “Save” and enter a file name and destination directory/folder.
•
Note: When you have rectified the fault, reset the PLS: select PLS – Initialise. Or execute the “Reset and initialisation” telegram in the SICK Diagnosis. The PLS system is then restarted.
58
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
58
08.07.2004, 15:55
Page 59
10 Checks 10.1 Check PLS
3. Daily checks of the protective devices by authorised and instructed persons.
These checks are necessary to control that the protective devices are functioning correctly and that they are integrated in the machine / plant control systems, as well as to detect any possible alterations or malfunctions.
This is how you check your PLS system correctly:
The following points must be observed to ensure that the devices are deployed correctly.
2. Check the mechanical installation and ensure that lock screws are tight, and that the PLS is correctly aligned.
The devices must be mounted and electrically connected by skilled personnel. Skilled personnel are to be understood as persons who possess sufficient knowledge about the fields of the power-driven machinery (based on their specialist training and professional experience). Furthermore, they must be familiar with the applicable national industrial safety regulations, accident prevention regulations, guidelines and generally recognised technical rulings and requirements (e.g. DIN standards, stipulations laid down by the German electricians’ association, technical regulations of other EU countries) to such an extent, that they can adjudge the power-driven machinery to be in a condition where it can be safely operated. Such persons are generally employees of the manufacturers of non-contact protective devices, or persons who have been trained by manufacturers of non-contact protective devices, or who are primarily occupied with checking non-contact protective devices and who act on the instructions of non-contact protective device operators.
3. Check the PLS for visible changes such as damage, manipulation, etc.
1. Checking of the protective devices installed on the machine before commissioning by skilled personnel: – Checks carried out before commissioning serve the purpose of confirming that the machinery complies with national/international regulations, as well as with safety requirements stipulated by machine or machine operator guidelines (EU Declaration of Conformity). – Checking of the effectiveness of the protective devices installed on the machinery in all the possible operating modes in accordance with the accompanying check list. – The operating personnel of the machinery fitted with the protective devices must be instructed in their use by skilled personnel employed by the machine operator before they start to work with the machinery. Instruction is the responsibility of the machine operator.
1. Checks must be performed every time the operating mode is changed.
4. Switch on the machine / plant. 5. Observe the PLS LEDs (red, green, yellow). 6. In the event that at least one of the LEDs is not permanently on when the machine / plant is activated, it must be assumed that there is a fault in the machine / plant. In this case, the machine must be shut down immediately and checked by a skilled operator. 7. Intentionally infringe in the protective field while the machine is operating in order to check the function of the entire plant. The LEDs must now change colour from green to red and the hazardous movement must stop immediately. Repeat this check at various positions in the danger zone. If a functional deviation is detected, the machine / plant must be shut down immediately and checked by a skilled operator. 8. On stationary applications, check whether the danger zone marked out on the floor corresponds to the shape of the protective field stored in the PLS, and whether possible gaps are safeguarded by other protective measures. In the case of mobile applications, check whether the vehicle does actually stop moving within the protective field limits set in the PLS, and displayed on the notice plates or detailed in the configuration log. If a functional deviation is detected, the machine / plant must be shut down immediately and checked by a skilled operator.
You check your PLS system by proceeding in accordance with the check list printed in the Technical Description. 2. Regular checks of the protective devices by skilled personnel: – Checks in accordance with the nationally applicable regulations at the stipulated intervals. These checks serve the purpose of revealing alterations made to, or manipulation of, the protective devices with regards to commissioning. – The checks must always be performed when significant alterations are made to the machinery or protective devices, as well as after refitting or maintenance work necessary following damage to the housing, front screen, connection cable, etc. You check your PLS system by proceeding in accordance with the check list printed in the Technical Description.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
59
08.07.2004, 15:55
59
Page 60
10.2 Checklist Check list for the manufacturer / outfitter for installing noncontact protective devices. Details about the points listed below must be present at least during initial commissioning – they are, however, dependent on the respective application, the specifications of which are to be controlled by the manufacturer / outfitter.
10. Are the required safety measures against electrical shock effective (protection class)? Yes ❏ No ❏
This check list should be stored in a safe place or kept together with the machine documentation so that it can be used for reference during repeated checks.
11. Is the command unit for resetting the non-contact protective devices or restarting the machine present and correctly installed? Yes ❏ No ❏
1. Did the safety regulations in accordance with the regulations / standards applicable to the machine serve as a basis for its design? Yes ❏ No ❏
12. Are the non-contact protective device outputs (OSSDs) integrated in accordance with the stipulated control category, and do they comply with the circuit diagrams? Yes ❏ No ❏
2. Are the guidelines and standards listed in the Declaration of Conformity? Yes ❏ No ❏ 3. Does the protective system comply with the required safety specifications? Yes ❏ No ❏ 4. Is access to the hazardous area / hazard position only possible through the protective field of the non-contact protective devices ? Yes ❏ No ❏ 5. Have measures been taken to prevent and monitor unauthorised presence in the hazardous area when safeguarding hazardous areas / hazard positions (mechanical point-of-operation guarding), and have these been secured against removal? Yes ❏ No ❏ 6. Have additional protective measures, which are intended to prevent reaching into, underneath and around the protective field, been installed and secured against manipulation? Yes ❏ No ❏
60
9. Are the non-contact protective devices correctly mounted and, following adjustment, secured against displacement? No ❏ Yes ❏
13. Has the protective function been checked in accordance with the check instructions in this documentation? Yes ❏ No ❏ 14. Are the given protective functions effective at every setting of the operating mode selector switch? Yes ❏ No ❏ 15. Are the switching elements activated by the non-contact protective devices (e.g. contactors, valves) monitored? No ❏ Yes ❏ 16. Are the non-contact protective devices effective throughout the entire dangerous status? Yes ❏ No ❏ 17. Is the corresponding status halted when the non-contact protective devices are switched on or off, the operating modes are changed over, or when switching over to another protective system? Yes ❏ No ❏
7. Has the maximum machine shutdown or stopping time been measured, and entered and documented (on the machine and / or in the machine documentation)? Yes ❏ No ❏
18. Is the notice plate for daily checks clearly visible to the operator? Yes ❏ No ❏
8. Are the non-contact protective devices situated at the stipulated safety distance from the next nearest hazard position? Yes ❏ No ❏
This check list does not replace the initial commissioning or regular checks by skilled personnel.
8 008 316/O801/07-07-04 Technical Description • PLS © SICK AG • Industrial Safety Systems • Germany • All rights reserved
PLS_TB_GB_06_05_02_M844.pmd
60
08.07.2004, 15:55