The text of a manual · part 7 of 56
Trimble Survey Controller User Guide: Coordinate Systems, pages 47 to 55
Pages 47 to 55 of 504, from Trimble Survey Controller User Guide
The original document is the PDF (5.9 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSCe
Page 47
CHAPTER
2 2
Coordinate Systems In this chapter: ■
Introduction
■
GPS coordinate system
■
Local coordinate systems
■
Calibration
■
Using a datum grid file
■
Using a geoid model
■
Working with ground coordinates
■
Choosing a coordinate system for a GPS survey
■
Choosing a coordinate system for a conventional survey
Page 48
2
Coordinate Systems
2.1
Introduction Before starting a GPS survey, decide which coordinate system to use. This chapter discusses some things to consider when making this decision. If you intend to combine conventional observations with GPS measurements, read the whole of this chapter. To make only conventional observations, see Choosing a Coordinate System for a Conventional Survey, page 39.
2.2
GPS Coordinate System GPS measurements are referenced to the 1984 World Geodetic System reference ellipsoid, known as WGS-84. However, for most survey tasks, results in terms of WGS-84 have little value. It is better to display and store results in terms of a local coordinate system. Before you start a survey, choose a coordinate system. Depending on the requirements of the survey, you can choose to give the results in the national coordinate system, a local coordinate grid system, or as local geodetic coordinates. When you have chosen a coordinate system, search your survey archives for any horizontal and vertical control points in that coordinate system that are in the area to be surveyed. You can use these to calibrate a GPS survey. For more information, see Calibration, page 271.
24
Trimble Survey Controller User Guide
Page 49
Coordinate Systems
2.3
2
Local Coordinate Systems A local coordinate system simply transforms measurements from a curved surface (the earth) onto a flat surface (a map or plan). Four important elements constitute a local coordinate system: • local datum
• datum transformation
• map projection
• calibration (horizontal and vertical adjustments)
When you survey using GPS, consider each of these.
2.3.1
Local Datum Because an exact model of the earth’s surface cannot be created mathematically, localized ellipsoids (mathematical surfaces) have been derived to best represent specific areas. These ellipsoids are sometimes referred to as local datums. NAD83, GRS80, and AGD66 are examples of local datums.
2.3.2
Datum Transformation GPS is based on the WGS-84 ellipsoid, which is sized and positioned to best represent the entire earth. To survey in a local coordinate system, the WGS-84 GPS positions must first be transformed onto the local ellipsoid using a datum transformation. Three types of datum transformation are commonly used. Alternatively, you can choose not to use a transformation at all.
Trimble Survey Controller User Guide
25
Page 50
2
Coordinate Systems
The datum transformations are as follows: • three-parameter – This assumes that the rotational axis of the local datum is parallel with the rotational axis of WGS-84. The three-parameter transformation involves three simple translations in X, Y, and Z. The three-parameter transformation that the Trimble Survey Controller software uses is a Molodensky transformation, so there may also be a change in ellipsoid radius and flattening. Note – Positions on a local datum are commonly called “local geodetic coordinates”. The Trimble Survey Controller software abbreviates this to “Local”.
2.3.3
• seven-parameter – This is the most complex transformation. It applies translations and rotations in X, Y, and Z as well as a scale factor.
• datum grid – This uses a gridded data set of standard datum shifts. By interpolation, it provides an estimated value for a datum transformation at any point on that grid. The accuracy of a datum grid depends on the accuracy of the gridded data set it uses. For more information, see Using a Datum Grid File, page 32.
Map Projection Local geodetic coordinates are transformed into local grid coordinates using a map projection (a mathematical model). Transverse Mercator and Lambert are examples of common map projections. Note – Positions on a map projection are commonly called “local grid coordinates”. The Trimble Survey Controller software abbreviates this to “Grid”.
26
Trimble Survey Controller User Guide
Page 51
Coordinate Systems 2.3.4
2
Horizontal and Vertical Adjustments If published datum transformation parameters are used, slight discrepancies can exist between local control and GPS-derived coordinates. These discrepancies can be reduced using minor adjustments. The Trimble Survey Controller software calculates these adjustments when you use the Site calibration function. They are called horizontal and vertical adjustments.
2.4
Calibration Calibration is the process of adjusting projected (grid) coordinates to fit the local control. You can key in a calibration, or let the Trimble Survey Controller software calculate it. You should calculate and apply a calibration before: • staking out points
• computing offset or intersection points
The rest of this section describes how to perform a calibration using the Trimble Survey Controller software. To key in a calibration, see Creating a Job, page 42.
Trimble Survey Controller User Guide
27
Page 52
2 2.4.1
Coordinate Systems
Calibration Calculations Use the Trimble Survey Controller software system to perform a calibration in one of two ways. Each method results in the computation of different components, but the overall result is the same if enough reliable control points (coordinates in your local system) are used. The two methods are: •
B
If you use published datum transformation parameters and map projection details when creating a job, and if you provide enough control points, the Trimble Survey Controller software performs a calibration that computes horizontal and vertical adjustments. Horizontal control points allow scale error anomalies in the map projection to be removed. Vertical control allows local ellipsoid heights to be transformed into useful orthometric heights.
Tip – Always use published parameters if they exist.
•
If you do not know the map projection and datum transformation parameters when creating the job and defining the local coordinate system, specify No projection/no datum. Then specify whether grid or ground coordinates are required after a site calibration. When ground coordinates are required, you must specify the project height. In this case, the Trimble Survey Controller software performs a calibration that calculates a Transverse Mercator projection and a Molodensky three-parameter datum transformation using the supplied control points. The project height is used to compute a ground scale factor for the projection so that ground coordinates are computed at that height.
28
Trimble Survey Controller User Guide
Page 53
Coordinate Systems
2
Table 2.1 shows the output of a calibration when various data is supplied.
2.4.2
Table 2.1
Calibration output
Projection
Datum transformation
Calibration output
Yes
Yes
Horizontal and vertical adjustment
Yes
No
Datum transformation, horizontal and vertical adjustment
No
Yes
Transverse Mercator projection, horizontal and vertical adjustment
No
No
Transverse Mercator projection, zero datum transformation, horizontal and vertical adjustment
Local Control for Calibration Trimble recommends that you observe and use a minimum of four local control points for the calibration calculation. For best results, local control points should be evenly distributed over the job area as well as extending beyond the perimeter of the site (assuming that the control is free of errors).
B 2.4.3
Tip – Apply the same principles as you would when placing control for photogrammetric jobs. Make sure that the local control points are evenly distributed to the extent of the job area.
Why Calibrations Are Needed If you calibrate a project and then survey in real time, the Trimble Survey Controller software gives real-time solutions in terms of the local coordinate system and control points.
Trimble Survey Controller User Guide
29
Page 54
2 2.4.4
Coordinate Systems
Operations That Require Calibration Note – Perform a calibration at any time, but always complete the calibration before staking out any points, or computing offset or intersection points. If no datum and no projection are defined, you can only stake out lines and points that have WGS-84 coordinates. Displayed bearings and distances are in terms of WGS-84. Specify a projection before staking out arcs, roads, and DTMs. The Trimble Survey Controller software does not assume that WGS-84 is the local ellipsoid, so you must also define a datum. Without a datum transformation, you can only start a real-time base survey with a WGS-84 point. For information on how to perform a calibration, see Calibration, page 271. Figure 2.1 shows the order of calculations performed when a calibration is calculated.
30
Trimble Survey Controller User Guide
Page 55
Coordinate Systems
Input GPS Measurements
2
WGS-84 LLH User-supplied Datum transformation Local ellipsoid (intermediate) L' L' H' User-supplied Map projection Unadjusted grid N E H' User-supplied Control (N E)control Calculate Horizontal adjustment (N E)control and N E User-supplied map projection Adjusted grid N' E' H'
Output Local ellipsoid L'L'H'
User-supplied Control (h)control YES
Geoid Model? User-supplied Geoid model NO hgeoid Calculate Vertical adjustment (h)control and H'
Calculate Vertical adjustment (h)control and hgeoid
Output grid coordinates (N' E' E)
Figure 2.1
Calibration calculation process
Trimble Survey Controller User Guide
31