The text of a manual · part 1 of 7
INTEGRA 9100 Operator's Manual, pages 1 to 10
Pages 1 to 10 of 70
The original document is the PDF (2.6 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Label Vision LNT-92A
Page 1
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
INTEGRA 9100 Operator’s Manual Version 4.28
Label Vision Systems, Inc. 101 Auburn Court Peachtree City, GA 30269 770-487-6414 770-487-0860 (fax) info@lvs-inc.com -1 -
Page 2
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
Computer, Touch Screen Monitor, and Light Tower Interface Unit and Read Head.
-2 -
Page 3
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
TABLE OF CONTENTS Introduction: Unpacking Safety Precautions
5 6 7
Setup and Installation Power requirements Mounting locations Computer location Monitor location Light Tower location Read Head location Mounting poles and brackets Photo-eye location and types Encoder location (when purchased)
8 8 8 8 8 8 9 10 12 13
Software Complete Rebuild Upgrade only
14 14
Preventive Maintenance
15
Spare Parts
16
Operations General Description of Operations Screen Functions Welcome Screen Job Screen Setting Default Parameters Password Protection Live Output Check digit The Description Box Read head detection or lanes to use Range checking (Duplicate checking) Setup Screen Video monitor Multilane selection Trigger Calibration Label box
17 18 19 19 20 20 20 20 21 21 24 24 24 25 25 27 -3 -
Page 4
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
ISO/IEC Parameters
28
Alarm Screen Output Matrix Available error conditions explained Output signal timing Operate Screen Real-time histograms Additional information Reports Screen Viewing or printing a “run” Reports
29 29 30 34 35 36 36 37 37 39
Applications and Guidelines How fast can I go? What size bar code can I grade? Web direction? Bounce? Does the web have to be flat? How will the label stock affect the overall bar code grade? The final overall grade. What does it tell you? Why does the INTEGRA-9100 grade Spots and Voids differently? The INTEGRA-9100 uses a white light source. How can it verify correctly?
40 41 42 43 43 43 43 44 45
Bar Code Verifier Conformance Specifications
46
Diagrams Three and Eight Lane System. Cable Drawings Light Tower Interface Unit
57 58-73 64
Board Input/Output Pins
Camera Configuration Worksheet
75-76
Glossary of Terms
65-66
Multi-lane Read Head. Points of Measurement
67
Certificate of Compliance
69
-4 -
Page 5
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
INTRODUCTION The INTEGRA-9100 is a vision based “on- line” bar code verification system. There are 4 main parts to the system: The Computer, Read Head, Light Tower Interface Unit, and Photo-eye. These components combine to verify the quality of up to 240 different bar code labels per second, at any speed, and in any orientation. Every .006 inch of bar height is analyzed for quality. From this data, an overall grade point average is established for each label and the results are sent to a reporting program. The individual overall grade point average reported by the system will correlate to the ISO/IEC 15416:2000(E) standards within +/- 0,2 . The Read Head is correlated to the standards by using the included Contrast Calibration Label. This calibration label was created by a company called Axicon, Inc. located in Bicester, England. A letter of authentisity is supplied with each Contrast Calibration Label. At the end of this manual is a chapter called “Static and Dynamic Certification”. This chapter will explain the processes for correlation to the standards. The system is also designed to check for mis- matches, sequential checking, check-sum verification, bar growth / shrinkage, real world blemishes, and no-duplicates checking.
INTEGRA-9100 Operate Screen
-5 -
Page 6
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
UNPACKING Each system is shipped as 8 main sub-assemblies: Computer, Monitor, Light Tower, Read Head, Registration Trigger kit, Cables, Mounting poles, and Manual. Unpack all packaging carefully and verify that all sections have been received. If there is something missing, call LVS at 1-800-432-9430 as soon as possible. The following is a list of all items shipped with a system:
1. Computer: Since the INTEGRA-9100 is a computer based system, the type and make of the computer will change as necessary to reflect the variances in customer requirements, availability, technological advances, and cost effectiveness. 2. Monitor: Similar to the computer, the type and make of the monitor will change as necessary to reflect variances in customer requirements, availability, technology, and cost effectiveness. 3. Light Tower: The Light Tower Interface Unit not only incorporates 4 colors of warning lights, but also houses the STOP MOTION relay. It can be identified by looking for a set of 4 lights that are connected via a pole to a small black interface box. It is 26.5” tall. 4. Read Head: There are two types of Read Heads: Single- lane and Multi- lane Read Heads. Most Read Head are specifically designed for each customer. Typically, the Multi- lane Read Heads come in 4 different widths: 12”, 16”, 18”, and 20”. They are 10 inches deep and 14 inches high. The Single- lane Read Head has a foot-print of 5” by 5” by 12” 5.
Mounting Poles with Brackets: Each system is sent with a universal mounting bracket. The Multi- lane kit will include the following: 2 mounting plates, 4 x 10” poles, 2 x 6’ poles, 4 x T brackets, 4 x right angle brackets, 8 x screws, and 12 set screws.
6. Registration Trigger Kit: The INTEGRA-9100 is designed to check 100% of the label stock. In order to accomplish this, an electronic signal called a Registration Trigger must be generated. There are two ways to generate this signal: By using an encoder or using a photo-eye. The kit that will come with your system will be one of these two. The brackets needed to mount the photo-eye or encoder is customer specific. 7. Cables: All cables will come packaged together. They are all clearly marked so that the installer will know where they go.
-6 -
Page 7
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
8. Manual: Included in the manual is a Contrast Calibratio n Label, backup software, and a Certificate of Compliance used to certify the systems verification process.
SAFETY PRECAUTIONS All components used to create this vision system are UL and CE approved. All circuits were designed to incorporate maximum safety. However, any equipment using electrical voltages may cause personal injury if improperly handled.
DO NOT ATTEMPT TO WORK ON THIS SYSTEM WITH THE MAIN POWER LINES CONNECTED. The Computer, Monitor, Read Head, and Light Tower incorporate internal fuses designed to protect against catastrophic failures. They are not accessible to any unauthorized personnel. In the event that a system appears to have lost its power, check to make sure the main AC power is on. Check to make sure all cables are plugged in. If the problem still exists, call the LVS factory at 1-800-432-9430.
-7 -
Page 8
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
SETUP and INSTALLATION POWER REQUIREMENTS
3 Standard AC outlets 100 to 130 VAC Combined Watts = 500 Used for the Computer, Read Head, and Strobe. 2 Standard AC to DC Converters. 12 VDC at 1000ma. Physical size is: width = 2.5”, length = 4”, height = 2.5” (13 watts each) Used for the Light Tower Interface Unit and Touch Screen Monitor.
MOUNTING LOCATION
Computer location: The computer must be located in a position that is away from any AC or DC motors or solenoids. Failure to do so may result in unwanted noise being emitted into the computer system. It is recommended that the computer system be located at least 3 feet away from these types of sources. The computer must also be placed in a position that is accessible to the operator.
Monitor location: Similar to the computer, a monitor should be located in a position which is away from any AC or DC motors or solenoids. Since this is a touch screen monitor, it needs to be mounted in such a way that the operator can see it while adjust the read head. If the operator cannot see the monitor while adjusting the read head, they will not be able to adjust the read head correctly.
Light Tower placement: The Light Tower Interface Unit must be positioned in a way that the operator can see the four warning lights when they turn “on”.
-8 -
Page 9
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
Read Head placement: The location of the read head is the most critical part of the installation. It is best to mount it as close to the “finished roll” as possible. There is another feature that can be purchased with the system that is designed to automatically “park” any errors at a specific location on the rewinder. (Usually at the splicing table.) When this feature is purchased, the read head must be placed before the splicing table so that the machine has time to stop when an error occurs. Label Orientation is how the industry describes the relationship of the bar code “bars” with the scanner or reader. There are two ways of orientation: LADDER and PICKETFENCE. The INTEGRA-9100 does not care which orientation is required providing the labels enter the camera’s field of view so that the “bars” of the bar code symbol are straight up and down as observed on the monitor.
These pictures show a typical installation of a Multi-lane Read Head. The picture to the right shows the Read Head cover opened exposing the 4 video cameras mounted on its slide. MULTI-LANE READ HEADS. LVS0200 SERIES Each video camera located within the Read Head is mounted on a slide. The slide is designed to allow the operator to change the cameras orientation so that the bars of the label are vertical within the monitor’s field of view. Avoid placing the Read Head near a high vibration area. If the Read Head is placed where the label stock can flutter, the system will not grade the labels with any consistency. A roller or support plate may need to be installed to reduce the flutter.
-9 -
Page 10
INTEGRA 9100 / 9100Q VERSION 4.28
INSTALLATION
Read Head Placement continued Basically, by adjusting the mounting pole brackets, the lowest portion of the Read Head should be placed 1” away from the bar code label surface. Specular Reflection coming from the surface of a label can blind bar code scanners. This system was designed to eliminate most specular reflection with the Read Head parallel to the label surface. If an irregular surface needs to be scanned, the Read Head may have to be tilted 5 or 10 degrees to eliminate the reflection.
Location for Mounting Poles with Brackets: Each system has two mounting plates designed to fit across any size web. The two 6 foot poles, sent with the system, are then cut to fit the exact distance across the web. (See below Figure) With the bottom of the read head positioned 1” away from the web, the mounting brackets are designed to adjust in all appropriate directions very easily. As with most things, common sense is the key to success. Mount the brackets in such a way that it is easy for the operator to adjust the Read Head when necessary.
One of the “cut-down” 6 foot poles
Mounting Plates
Mounting Brackets with Read Head.
- 10 -