The text of a manual · part 2 of 6
C-BOX 150 Installation Manual, pages 5 to 8
Pages 5 to 8 of 34: CONTENTS; SAFETY PRECAUTIONS; GENERAL VIEW
The original document is the PDF (2.2 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Datalogic C-Box 150
Page 5
CONTENTS
SAFETY PRECAUTIONS............................................................................ iv Power Supply................................................................................................iv WEEE Compliance .......................................................................................iv GENERAL VIEW .......................................................................................... v GUIDE TO INSTALLATION ....................................................................... vii 1 1.1 1.2
INTRODUCTION .......................................................................................... 1 Product Description....................................................................................... 1 C-BOX 150 Compatible Devices................................................................... 2
2 2.1 2.2 2.3 2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 2.4.8 2.5 2.5.1 2.5.2 2.6 2.6.1 2.6.2 2.7
INSTALLATION............................................................................................ 3 Package Contents......................................................................................... 3 Opening the Device ...................................................................................... 4 Mechanical Installation.................................................................................. 5 Electrical Connections and Hardware Setup................................................. 7 Power Supply................................................................................................ 8 System Wiring............................................................................................... 9 Scanner Chassis Grounding Jumper Settings ............................................ 12 Scanner Selection....................................................................................... 12 RS485 Bus Termination .............................................................................. 13 Powering C-BOX 150 From A Scanner....................................................... 13 OM4000 Jumper Settings ........................................................................... 14 Configuration Switch And 9-Pin Internal Connector .................................... 14 Operating Modes ........................................................................................ 16 GET/TEST/SEND Functions ....................................................................... 16 LED Indicators ............................................................................................ 18 Typical Layouts ........................................................................................... 20 1000, 2000, 4000 Scanners ........................................................................ 20 6000, 8000 Scanners .................................................................................. 21 Scanner Replacement ................................................................................ 22
3
TECHNICAL FEATURES ........................................................................... 23 iii
Page 6
SAFETY PRECAUTIONS POWER SUPPLY ATTENTION: READ THIS INFORMATION BEFORE INSTALLING THE PRODUCT - This product is intended to be installed by Qualified Personnel only. The C-BOX 150 is intended to be supplied either by a UL Listed NEC Class 2 power source, or a UL Listed ITE Limited Power Source (LPS), rated 10-30 V dc, minimum 0.5 A.
CAUTION
The overall value of power consumption of the system (C-BOX 150 + scanner) is given by adding the scanner power consumption to that of the C-BOX 150. Refer to the manual of the connected scanner for details about minimum/maximum supply voltage and power consumption.
See par. 2.4.1 for correct power supply connections.
WEEE COMPLIANCE iv
Page 7
GENERAL VIEW C-BOX 150
3
1 2
Figure A
1 25-pin scanner connector 2 Compression connectors 3 Cover screws (4)
v
Page 8
C-BOX 150 3
4
5
6
7
8
9
10
11 12
13
2
14 15
1
16 17 18
Figure B - Bottom Inside
1 Power on switch 2 Chassis grounding jumper
10 INT-30 power connector 11 Auxiliary port connector
3 Power polarity error LED (red) 12 OM4000 jumpers vi
4 RS485 Bus termin.switch
13 Warning LED (red)
5 Scanner selection switch
14 Status LED
6 Power on LED (green)
15 Spring clamp terminal blocks
7 GET button
16 Tx LED
8 TEST button
17 Configuration switch
9 SEND button
18 Power source jumper