The text of a manual · part 15 of 83
Trimble Survey Controller Reference Manual: Job Operations, pages 117 to 124
Pages 117 to 124 of 744, from Trimble Survey Controller Reference Manual
The original document is the PDF (8.5 MB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Trimble TSC1
Page 117
CHAPTER
6 6
Job Operations In this chapter: ■
Introduction
■
Job management
■
Reviewing the job database
■
Status of current job
■
Map of current job
■
File manager
■
System units
■
System settings and corrections
Page 118
6
Job Operations
6.1
Introduction Before starting a survey, select or create a job. All subsequent settings and data are stored in this job. Note – In the Trimble Survey Controller software, GPS and conventional data can be combined in a single job. You can change certain settings (such as the units and distance display) at any time. Trimble recommends that you set these before creating a job, as this reduces the number of records in the job database. For more information, see System Settings and Corrections, page 103.
6.2
Job Management You can create, open, copy, delete, and close jobs in the Trimble Survey Controller software database. The current job name is displayed at the top of the main menu. Note – If a job is stored on a PCMCIA (PC) card, always close the job before removing the PC card from the TSC1 data collector. To perform most job operations, select Files from the main menu. Then select Job management.
6.2.1
Creating a Job w
To create a job:
88 and enter the job name. Press
\ to accept the job
1.
Press name.
2.
To record data on a PC card, change the File location field to PC card. This field only appears if a PC card is inserted.
3.
Press
\ again to create and open the job.
Trimble Survey Controller Reference Manual Volume 1
Page 119
Job Operations
4.
6
The Select coordinate system menu appears. Do one of the following: –
Select a system from the list provided by the Trimble Survey Controller software. To do this, choose Select from library. Select a coordinate system from the list, then select a zone for the area. To use a geoid file from the database, set the Use geoid model field to Yes and set the Geoid model field to the geoid file name. For more information, see Using a Geoid Model, page 81.
–
Key in the projection and datum transformation parameters for the site. To do this, select Key in parameters / Projection. Enter the details for the site. Select Datum transformation and enter the details. In the Datum transformation screen, the Scale field displays a parts per million (ppm) value. Note – When keying in the coordinate system parameters, define the local ellipsoid in either the Projection screen or the Datum transformation screen. If the values change in one of these screens, the Trimble Survey Controller software automatically changes them in the other. The source ellipsoid is always WGS-84. The parameters do not appear here and there is no need to edit them.
–
Select Scale factor only and enter a value in the Scale field. All ground distances will be scaled by this value.
–
Copy a coordinate system from another job in the database. To do this, select Copy from other job. Select the job name that you want to copy from.
–
Select No projection/no datum.
Trimble Survey Controller Reference Manual Volume 1
89
Page 120
6
Job Operations
Set the Coordinates field to Ground and enter a value (average site elevation) in the Reference elevation field to use ground coordinates after a site calibration. Alternatively, set the Coordinate field to Grid. Set the Use geoid model field to Yes and select a geoid model to calculate a Geoid/Inclined plane vertical adjustment after a site calibration. If a survey is to contain conventional observations only, select Scale factor only. If conventional observations are to be combined with GPS measurements, choose a coordinate system now. For more information, see Choosing a Coordinate System for a Conventional Survey, page 85. Note – If you are not sure of the coordinate system, select No projection/no datum. Set the Coordinates field to Ground and enter the average site elevation in the Reference elevation field. Define the values later in the job and all points will be updated. (To do this, select Configuration / Job / Coordinate system. or and enter the parameters or select a Press coordinate system.)
k9
If no datum transformation and no projection are defined, any points measured using GPS are displayed only as WGS-84 coordinates. Any points measured using a conventional instrument are displayed with null (?) coordinates.
C
Warning – If using GPS, define the coordinate system and/or calibration for the job before computing offsets and/or intersection points, or staking out points. If you later change the coordinate system or calibration, any of the above points already computed, measured, or staked out will not be in terms of the new coordinate system. They will be inconsistent with points computed or staked out after the change.
5.
90
Press
O\ or to create the job.
Trimble Survey Controller Reference Manual Volume 1
Page 121
Job Operations 6.2.2
Opening a Job To open a job, highlight the name of the required job and press
6.2.3
Copying a Job 1. 2.
\
Y
To copy a job: Highlight the name of the job to be copied and press
\
6
.
.
Enter a name for the new job in the To name field and press .
The complete job is copied.
B 6.2.4
Tip – Use this function to rename a file.
Deleting a Job To delete a job: 1.
Make sure the job is closed.
2.
Highlight the name of the job to be deleted and press y n d
.
The Trimble Survey Controller software warns you if the job has not yet been transferred to an office computer. 3.
y to continue the deletion process, or Press job and download it later.
to keep the to confirm the deletion, all raw files If you press associated with the job are also deleted. If you make a mistake when deleting a job, undo the deletion. See Undeleting a Job.
Trimble Survey Controller Reference Manual Volume 1
91
Page 122
6 6.2.5
Job Operations
Undeleting a Job To see a list of recently deleted files, press
\ u
.
To undelete a file, highlight the name of the job to be undeleted and press . A deleted file remains on the Undelete list as long as there is memory space. When the TSC1 memory starts to get full, the oldest deleted file is purged from memory.
6.2.6
Copying Data Between Jobs Use this option to copy data between jobs. You can copy the following data: •
Calibration
•
All control points
•
Calibration and control points
•
Roads
•
Points
To copy data from another job:
92
(
1.
From the main menu select Files / Copy data between jobs.
2.
Highlight the Job to copy from field and press . Select the name of the job that contains the data you want to copy and press .
3.
Highlight the Job to copy to field and press . Select the name of the job that you want to copy the data into and press .
4.
In the Copy field, select the appropriate option according to the data that you want to copy.
5.
Set the Copy duplicate points field to Yes if you want to copy a point - even if it already exists in the job you are copying to.
\
Trimble Survey Controller Reference Manual Volume 1
(
\
Page 123
Job Operations
6
If you set the Copy duplicate points field to Yes, the Overwrite field appears. Set it to Yes if you want the duplicate points you copy to overwrite (delete) the points in the job you are copying to. 6.
O n
Press
.
When copying points, the message:
y
Calibration differs from current job. Copy calibration also?
y appears if the two jobs have different calibrations. Press or as appropriate. If you press the calibration is also copied. If duplicate points were copied, a warning message appears and shows how many duplicates were copied.
6.2.7
Closing a Job To close the current job press required.
ä
. Then delete or copy the job as
If the job is stored on the PC card, close the job before removing the PC card from the TSC1 data collector.
6.3
Reviewing the Job Database To review the database for the current job, see Reviewing the Database, page 57.
Trimble Survey Controller Reference Manual Volume 1
93
Page 124
6
Job Operations
6.4
Status of Current Job From the main menu select Files / Status of current job. A screen appears, showing details of the job status. See Figure 6.1.
Figure 6.1
Status of Current Job screen
If a PC card is inserted, an extra field called File location appears. It shows where the file is stored - on the PC card or in main memory. The Job space field shows the memory taken up by data such as job records, RTK points, and coordinate system details. It does not include the memory used by the raw GPS files. The Logging time available field appears when the current survey is logging data. It shows how much memory is left in the receiver or TSC1 if logging continues at the current logging interval and with the current number of satellites. The GPS file space field shows the memory taken up by the raw GPS files when GPS data is logged to the TSC1 data collector for postprocessing. The Downloaded field shows whether or not the job has been downloaded. The Projection field (or System or Zone field, depending on the options set) shows the coordinate system for the current job. The Calibrated field shows whether or not the job has been calibrated. 94
Trimble Survey Controller Reference Manual Volume 1