The text of a manual · part 1 of 4
C-BOX 100 Installation Manual, pages 1 to 5
Pages 1 to 5 of 25
The original document is the PDF (509 KB). This is its text as extracted, unedited; tables and drawings read best in the PDF, and each page heading opens it at that page.
For the Datalogic C-Box 100
Page 1
C-BOX IO0O
Installation Manual
= >
DATALOGIC
Page 2
C-BOX IO0O
Installation Manual
= >
DATALOGIC
Page 3
C-BOX 100 INSTALLATION MANUAL
Page 4
DATALOGIC S.p.A. Via Candini 2 40012 - Lippo di Calderara di Reno Bologna - Italy
C-BOX 100 Ed.: 09/2003
ALL RIGHTS RESERVED Datalogic S.p.A. reserves the right to make modifications and improvements without prior notification. Datalogic shall not be liable for technical or editorial errors or omissions contained herein, nor for incidental or consequential damages resulting from the use of this material. Product names mentioned herein are for identification purposes only and may be trademarks and or registered trademarks of their respective companies. Datalogic S.p.A. 2001 - 2003
821000552 (Rev. B)
Page 5
CONTENTS
GUIDE TO INSTALLATION ........................................................................ iv GENERAL VIEW .......................................................................................... v SAFETY PRECAUTIONS........................................................................... vii Power Supply...............................................................................................vii 1 1.1 1.2
GENERAL FEATURES ................................................................................ 1 Description .................................................................................................... 1 Supported Scanner Models........................................................................... 1
2 2.1 2.2 2.3 2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.5
INSTALLATION............................................................................................ 2 Package Contents......................................................................................... 2 Opening the Device ...................................................................................... 3 Mechanical Installation.................................................................................. 4 Electrical Connections and Setup ................................................................. 6 Power Supply................................................................................................ 7 System Wiring............................................................................................... 8 Chassis Grounding Jumper Settings........................................................... 10 Scanner Selection....................................................................................... 11 RS485 Bus Termination .............................................................................. 11 OM4000 Jumper Settings ........................................................................... 12 9-Pin Scanner Auxiliary Serial Interface...................................................... 13
3
TECHNICAL FEATURES ........................................................................... 14 iii